Examples of Cable Route in a sentence
This diagram shall consist of Cable Route Details on Geographical Map drawn to scale the prominent land marks and alignment of cable with reference to road.
This diagram shall consist of Cable Route Details on Geographical Map drawn to scale with prominent land marks and alignment of cable with reference to road.
It allows necessary time for all pre-construction matters to be dealt with, and for the Proposed Development, particularly the Onshore Cable Route, to be constructed in sequence within the constraints provided to mitigate environmental impacts, and subsequently the permanent easement width to be confirmed, therefore ensuring the rights to be acquired are the minimum amount required in connection with the operation and maintenance of the Proposed Development.
The limits of deviation provided for the Onshore Cable Route includes a necessary and proportionate level of flexibility so to ensure the delivery of the Proposed Development without impediment.
ERM-Hong Kong, Limited (ERM) was appointed by CLP Power (CLP) as the Environmental Team (ET) to implement the Environmental Monitoring and Audit (EM&A) programme for the Proposed 132kV Submarine Cable Route for Airport “A” to Castle Peak Power Station Cable Circuit (thereinafter called the (‘Project’)).
This diagram shall consist of Cable Route Details on Geographical Map drawn to scale the prominent landmarks and alignment of cable with reference to road.
In the event of any such discontinuance and relocation which necessitates discontinuation or relocation of the Cable or Cable Route, PG&E shall give written notice to CUSTOMER as soon as reasonably practicable.
In September 2006, a Project Profile (PP) for the proposed 132kV Cable Route for Airport “A” to Castle Peak CCTS (thereinafter called the ‘Project’) was prepared and submitted to the Environmental Protection Department (EPD) under the Environmental Impact Assessment Ordinance (EIAO) for application for Permission to apply directly for Environmental Permit (EP) (Application No. DIR-143/2006).
Figure 5 GridLink Subsea Cable Route In France, the subsea cable will cross the coastline by horizontal direction drilling at the Port of Dunkirk, and from this point an underground cable route of about 13 km will cross industrial and agricultural areas owned by the Grand Maritime Port of Dunkerque (GPMD).
FOCAS shall test the Cable installed by FOCAS in accordance with the Acceptance Testing Standards to verify that the Cable is operating in accordance with the specifications set forth in Exhibit "A." Testing shall progress segment by segment along the Cable Route as Cable splicing progresses so that test results may be reviewed in a timely manner.