Capacity of the fuel tank definition

Capacity of the fuel tank means the fuel-tank capacity as specified by the manufacturer.
Capacity of the fuel tank means the fuel-tank capacity as specified by the manufacturer of the vehicle.

Examples of Capacity of the fuel tank in a sentence

  • Any part of the self-closing valve that might become detached during the ad- dition of fuel shall be secured to the tank by a chain or other fastening to prevent loss.(2) The fuel tank shall have a definite position in the equipment assembly, and no provision shall be made for at- tachment of separate or auxiliary fuel tanks.(3) Capacity of the fuel tank shall not exceed the amount of fuel necessary to operate the engine continuously at full load for approximately four hours.(b) Fuel lines.

  • Any part of the self-closing valve th a t might be come detached during the addition of fuel shall be secured to the tank by a chain or other fastening to prevent loss.(2) The fuel tank shall have a definiteposition in the equipment assembly, and no provision shall be made for attach ment of separate or auxiliary fuel tanks.(3) Capacity of the fuel tank shall not exceed the amount of fuel necessary to operate the engine continuously at full load for approximately four hours.(b) Fuel lines.

Related to Capacity of the fuel tank

  • Generation Capacity Resource shall have the meaning specified in the Reliability Assurance Agreement.

  • Planned Financed Generation Capacity Resource means a Planned Generation Capacity Resource that, prior to August 7, 2015, has an effective Interconnection Service Agreement and has submitted to the Office of the Interconnection the appropriate certification attesting achievement of Financial Close.

  • Capacity Resource shall have the meaning provided in the Reliability Assurance Agreement.

  • INTER-CONNECTION POINT/ DELIVERY/ METERING POINT means a single point at 220kV or above, where the power from the Project(s) is injected into the identified ISTS Substation (including the dedicated transmission line connecting the Projects with the substation system) as specified in the RfS document. Metering shall be done at this interconnection point where the power is injected into. For interconnection with grid and metering, the WPDs shall abide by the relevant CERC/ SERC Regulations, Grid Code and Central Electricity Authority (Installation and Operation of Meters) Regulations, 2006 as amended and revised from time to time.

  • Capacity Storage Resource means any Energy Storage Resource that participates in the Reliability Pricing Model or is otherwise treated as capacity in PJM’s markets such as through a Fixed Resource Requirement Capacity Plan.

  • Interconnection Point means the point(s) of connection(s) at which the project is connected to the grid i.e. it shall be at 11 / 22 kV bus bar level of substation of MSEDCL.

  • Generating Facility Capacity means the net seasonal capacity of the Generating Facility and the aggregate net seasonal capacity of the Generating Facility where it includes multiple energy production devices. Good Utility Practice shall mean any of the practices, methods and acts engaged in or approved by a significant portion of the electric industry during the relevant time period, or any of the practices, methods and acts which, in the exercise of reasonable judgment in light of the facts known at the time the decision was made, could have been expected to accomplish the desired result at a reasonable cost consistent with good business practices, reliability, safety and expedition. Good Utility Practice is not intended to be limited to the optimum practice, method, or act to the exclusion of all others, but rather to delineate acceptable practices, methods, or acts generally accepted in the region. Governmental Authority shall mean any federal, state, local or other governmental regulatory or administrative agency, court, commission, department, board, or other governmental subdivision, legislature, rulemaking board, tribunal, or other governmental authority having jurisdiction over any of the Parties, their respective facilities, or the respective services they provide, and exercising or entitled to exercise any administrative, executive, police, or taxing authority or power; provided, however, that such term does not include Developer, NYISO, Affected Transmission Owner, Connecting Transmission Owner, or any Affiliate thereof. Hazardous Substances shall mean any chemicals, materials or substances defined as or Highway shall mean 115 kV and higher transmission facilities that comprise the following NYCA interfaces: Xxxxxxxx East, West Central, Xxxxxx East, Xxxxx South, Central East/Total East, and UPNY-ConEd, and their immediately connected, in series, bulk power system facilities in New York State. Each interface shall be evaluated to determine additional “in series” facilities, defined as any transmission facility higher than 115 kV that (a) is located in an upstream or downstream zone adjacent to the interface and (b) has a power transfer distribution factor (DFAX) equal to or greater than five percent when the aggregate of generation in zones or systems adjacent to the upstream zone or zones that define the interface is shifted to the aggregate of generation in zones or systems adjacent to the downstream zone or zones that define the interface. In determining “in series” facilities for Xxxxxxxx East and West Central interfaces, the 115 kV and 230 kV tie lines between NYCA and PJM located in LBMP Zones A and B shall not participate in the transfer. Highway transmission facilities are listed in ISO Procedures. Initial Synchronization Date shall mean the date upon which the Large Generating Facility is initially synchronized and upon which Trial Operation begins, notice of which must be provided to the NYISO in the form of Appendix E-1. In-Service Date shall mean the date upon which the Developer reasonably expects it will be ready to begin use of the Connecting Transmission Owner’s Attachment Facilities to obtain back feed power. Interconnection Facilities Study shall mean a study conducted by NYISO or a third party consultant for the Developer to determine a list of facilities (including Connecting Transmission Owner’s Attachment Facilities, Distribution Upgrades, System Upgrade Facilities and System Deliverability Upgrades as identified in the Interconnection System Reliability Impact Study), the cost of those facilities, and the time required to interconnect the Large Generating Facility with the New York State Transmission System or with the Distribution System. The scope of the study is defined in Section 30.8 of the Standard Large Facility Interconnection Procedures.

  • Base Capacity Resource means a Capacity Resource as described in Tariff, Attachment DD, section 5.5A(b).

  • Project Capacity means the AC capacity of the project at the generating terminal(s) and to be contracted with MSEDCL for supply from the Solar Power Project.

  • Base Capacity Resource Price Decrement means, for the 2018/2019 and 2019/2020 Delivery Years, a difference between the clearing price for Base Capacity Resources and the clearing price for Capacity Performance Resources, representing the cost to procure additional Capacity Performance Resources out of merit order when the Base Capacity Resource Constraint is binding.

  • Production Capacity means the amount of potable water which can be supplied to the distribution system in a twenty-four-hour period.

  • Emergency generator means any generator of which the sole function is to provide emergency backup power during an interruption of electrical power from the electric utility. An emergency generator does not include:

  • Planned External Financed Generation Capacity Resource means a Planned External Generation Capacity Resource that, prior to August 7, 2015, has an effective agreement that is the equivalent of an Interconnection Service Agreement, has submitted to the Office of the Interconnection the appropriate certification attesting achievement of Financial Close, and has secured at least 50 percent of the MWs of firm transmission service required to qualify such resource under the deliverability requirements of the Reliability Assurance Agreement.

  • Potential electrical output capacity means, with regard to a unit, 33 per- cent of the maximum design heat input of the unit.

  • Contract Capacity has the meaning set forth in Section 3.1(f).

  • Delivery Points means: (i) for natural gas transported by interstate pipelines, the city gate stations of your Utility, and (ii) for electricity, one or more points at which Company, as your agent, has arranged for the delivery of electricity to a third party (such as your Utility) for your account or at your premises.

  • connecting point means the point at which the drainage installation joins the connecting sewer;

  • Delivery Point means the point(s) of connection(s) at which energy is delivered into the Grid System i.e. the Interconnection Point.

  • Demarcation Point The Demarcation Point shall have the meaning set forth in 47 Digital Subscriber Line Access Multiplexer (DSLAM): Equipment that links End User xDSL connections to a single packet switch, typically ATM or IP. Direct Trunked Transport (DTT): A DS1 or DS3 interoffice facility that connects the CenturyLink Serving Wire Center of the CLEC’s Local Interconnection Entrance Facility or Collocation to the terminating CenturyLink Tandem or End Office used exclusively for the transmission and routing of Telephone Exchange Service and Exchange Access.

  • Inter-connection Point means interface point of renewable energy generating facility with the transmission system or distribution system, as the case may be:

  • Generator means a device that produces electricity.

  • Interconnection Customer means a Generation Interconnection Customer and/or a Transmission Interconnection Customer.

  • Connection Point means an exit point or an entry point or a bidirectional point identified or to be identified as such in an access contract.

  • Bulk mixing plant means machinery, appliances or other similar devices that are assembled in such a manner so as to be able to mix materials in bulk for the purposes of using the mixed product for construction work;

  • low voltage means the set of nominal voltage levels that are used for the distribution of electricity and whose upper limit is generally accepted to be an a.c. voltage of 1000V ( or a d.c. voltage of 1500 V). [SANS 1019]

  • PJM Region shall have the meaning specified in the Operating Agreement. “PJM Tariff,” “Tariff,” “O.A.T.T.,” “OATT,” or “PJM Open Access Transmission Tariff” shall mean that certain PJM Open Access Transmission Tariff, including any schedules, appendices or exhibits attached thereto, on file with FERC and as amended from time to time thereafter.