CCT Duration definition

CCT Duration has the meaning ascribed to it in Section 15.6(c).

Examples of CCT Duration in a sentence

  • Data collection, prior to and after the CCT Duration will be used for information and reference only.

  • The Buyer shall provide to the Supplier within ten (10) Business Days after receipt of the Capacity Check Test report from the Supplier, written confirmation of the Electricity output for the CCT Duration during the Capacity Check Test (the “Capacity Confirmation”).

  • If the total Electricity output of the Facility for each of the Capacity Check Test and the Further Capacity Check Test, as stated in their respective Capacity Confirmations, divided by the CCT Duration, in each of the respective check tests (each an “Average Test Capacity”), are both less than eighty-five percent (85%) of the Monthly Contract Capacity, then this shall be considered a Supplier Event of Default.

  • To blend the mouth in better, a third ‘context’ encoder is used to encourage in- painting.

  • The Sponsor shall provide to the Supplier within ten (10) Business Days after receipt of the Capacity Check Test report from the Supplier, written confirmation of the Electricity output for each hour of the CCT Duration during the Capacity Check Test (the “Capacity Confirmation”).

Related to CCT Duration

  • Specified Duration means, with respect to any Floating Rate to be determined in accordance with a Screen Rate Determination on an Interest Determination Date, the duration specified in the relevant Final Terms or, if none is specified, a period of time equal to the relative Interest Accrual Period, ignoring any adjustment pursuant to Condition 5(c)(ii).

  • Duration means the warranty period. This period may be a stated period of time, amount of usage, or the occurrence of a specified event, after formal acceptance of delivery, for the Government to assert a contractual right for the correction of defects.

  • Maintenance Period shall have the meaning set forth in Clause 14.1; “Maintenance Requirements” shall have the meaning set forth in Clause 14.2;

  • Applicable Measurement Period means the most recently completed four consecutive fiscal quarters of the Issuer immediately preceding the Applicable Calculation Date for which internal financial statements are available.

  • Range During Month or "(RDM)" as a sample type means the lowest and the highest values of all of the monitoring data for the reporting month.

  • Range During Sampling or "(RDS)" as a sample type means the maximum and minimum of all values recorded as a result of analyzing each grab sample of; 1) a Composite Sample, or, 2) a Grab Sample Average. For those Permittee with pH meters that provide continuous monitoring and recording, Range During Sampling means the maximum and minimum readings recorded with the continuous monitoring device during the Composite or Grab Sample Average sample collection.

  • Scheduled Black-Out Period means the period from and including the last day of a fiscal quarter of the Company to and including the business day after the day on which the Company publicly releases its earnings for such fiscal quarter.

  • Scheduled Outage means the final outage plan as approved by the RPC as per the provisions of the Grid Code;

  • Scheduled Unavailability Date has the meaning specified in Section 3.03(b).

  • Benchmark Unavailability Period means, the period (if any) (a) beginning at the time that a Benchmark Replacement Date has occurred if, at such time, no Benchmark Replacement has replaced the then-current Benchmark for all purposes hereunder and under any Loan Document in accordance with Section 2.14 and (b) ending at the time that a Benchmark Replacement has replaced the then-current Benchmark for all purposes hereunder and under any Loan Document in accordance with Section 2.14.

  • Generator Maintenance Outage means the scheduled removal from service, in whole or in part, of a generating unit in order to perform necessary repairs on specific components of the facility, if removal of the facility meets the guidelines specified in the PJM Manuals.

  • Continuous parameter monitoring system (CPMS means all of the equipment necessary to meet the data acquisition and availability requirements of the Prevention of Significant Deterioration program, to monitor process and control device operational parameters (for example, control device secondary voltages and electric currents) and other information (for example, gas flow rate, O2 or CO2 concentrations), and to record average operational parameter value(s) on a continuous basis.

  • Maintenance Term means the period of time for which Customer has purchased Maintenance Services, as evidenced by the Purchase Order delivered by Customer in connection therewith, together with all renewals effected in accordance with Section 4 of this Agreement.

  • Baseline Period means the period used to determine the baseline emission rate for each regulated pollutant under OAR 340 division 222.

  • Extended Use Period means the period beginning on the 1st day in the compliance period on which such building is part of a qualified low-income housing project, and ending on the later of the date specified by such agency in such agreement, or the date which is 15 years after the close of the compliance period.

  • Unscheduled Outage means an interruption resulting in reduction of the Availability of the Element(s) / Project (as the case may be) that is not a result of a Scheduled Outage or a Force Majeure Event.

  • Standard fertility preservation services means procedure based upon current evidence-based standards of care established by the American Society for Reproductive Medicine, the American Society for Clinical Oncology, or other national medical associations that follow current evidence-based standards of care.

  • Loop Concentrator/Multiplexer or "LCM" is the Network Element that does one or more of the following: aggregates lower bit rate or bandwidth signals to higher bit rate or bandwidth signals (multiplexing); disaggregates higher bit rate or bandwidth signals to lower bit rate or bandwidth signals (demultiplexing); aggregates a specified number of signals or channels to fewer channels (concentrating); performs signal conversion, including encoding of signals (e.g., analog to digital and digital to analog signal conversion); or in some instances performs electrical to optical (E/O) conversion. LCM includes DLC, and D4 channel banks and may be located in Remote Terminals or Central Offices.

  • Generator Forced Outage means an immediate reduction in output or capacity or removal from service, in whole or in part, of a generating unit by reason of an Emergency or threatened Emergency, unanticipated failure, or other cause beyond the control of the owner or operator of the facility, as specified in the relevant portions of the PJM Manuals. A reduction in output or removal from service of a generating unit in response to changes in market conditions shall not constitute a Generator Forced Outage.

  • Interconnection Activation Date means the date that the construction of the joint facility Interconnection arrangement has been completed, trunk groups have been established, joint trunk testing is completed and trunks have been mutually accepted by the Parties.

  • Continuous parameter monitoring system or "CPMS" means all of the equipment necessary to meet the data acquisition and availability requirements of this chapter, to monitor process and control device operational parameters (for example, control device secondary voltages and electric currents) and other information (for example, gas flow rate, oxygen or carbon dioxide concentrations), and to record average operational parameter value on a continuous basis.

  • Beyond use date means the date determined by a pharmacist and placed on a

  • Launch Date has the meaning specified therefor in Section 2.02(b) of this Agreement.

  • Desired Due Date means the desired service activation date as requested by CLEC on a service order.

  • Maintenance Outage means a time period during which Seller plans to reduce the Power Output of the Power Product, in full or in part, in order to facilitate maintenance work on the Generating Facility, other than a Major Overhaul.

  • Generator Planned Outage means the scheduled removal from service, in whole or in part, of a generating unit for inspection, maintenance or repair with the approval of the Office of the Interconnection in accordance with the PJM Manuals.