Examples of Chilled Water Plant in a sentence
I should let parties amend “freely … when justice so requires.” Fed.
Chilled Water Plant Metrics DescriptionUnits Chilled Water PlantMaximum of 2 chillers per chilled water plant measured TargetChilled Water Flow Boiler Plant MetricsAll metrics will be calculated using data collected below.
Note: (aa) * Similar integrated works mentioned above shall mean “Buildings & structures onshore with pile foundations along with 50% of value mentioned in para 8(C)(a)(ii)(aa) to (cc) of High Tension electric works (excluding 33 KV).(bb) Bidder to have back to back Memorandum of Understanding (MoU) with Chilled Water Plant and Crane.
Emissions not reported due to the lack of accurate, attainable data or trends on which to base projected estimates include wastewater and purchased steam and chilled water from the shared Louisville Metro Steam & Chilled Water Plant, an independent, non-profit entity that supplies steam and chilled water to the entire downtown hospital and medical center, including our Health Sciences Center.
Engagement of Australian Tier 2, 3 & 4 suppliers.o eg Chilled Water Plant, Sewage Treatment Plant, Doors, Scuttles and Hatches.
DDC System consisting of a Panel housing Direct Digital Controllers with one Workstation PC for operation and control of Central Chilled Water Plant including pumps, AHUs, Motorized 3-way Mixing valves of AHUs, Cooling tower fans, Motorized fire dampers, Electric strip heaters, Electrode humidifiers, Fresh air fans.
Action:Kimberly Kenne moved and Scott Phelps seconded to Approve e) Approval of Proposal with Southland Energy for Pasadena High School Central Chilled Water Plant Project [BR 1482-F] - Motion No. 160Vote: Motion carried 5 - 2No: Kimberly Kenne, and Patrick Cahalan Superintendent McDonald to provide further information regarding funding.
The expansion and upgrades of the Steam & Chilled Water Plant are necessary to accommodate the growth of OU Health Sciences Center and to supply uninterrupted service to the campus.
Both the Central Utility Plant and the Chilled Water Plant are being scheduled to support FNAL’s FY 2027-2029 Long Accelerator Shutdown to allow the utility systems to be tied in.• The Kautz Road Substation Replacement Subproject preliminary plans are to enhance the reliability of the Kautz Road Substation and reduce safety risks to personnel by replacing aging infrastructure, facilitating energy control, and reducing arc-flash incident energies.
President Banowsky recommended that the Board of Regents approve the award of a purchase order in the amount of $130,649.66 to Southwest Electric for the purchase of equipment to convert Chilled Water Plant Number 2 chiller unit from steam turbine drive to an electric drive.