Coke Conveyor Belt Easement Area definition

Coke Conveyor Belt Easement Area is legally described in Exhibit G.
Coke Conveyor Belt Easement Area legally described on Exhibit G attached hereto and generally depicted on the Aerial, for the construction, operation, repair, maintenance and replacement of a conveyor belt system for the transportation of coke and coke related materials to and from the Fertilizer Plant (the “Coke Conveyor Belt Easement”); and (ii) the “Coke Haul Road Easement Area”, legally described on Exhibit P attached hereto and generally depicted on the Aerial, for the transportation of coke and coke related materials to and from the Fertilizer Plant over the existing roadways located thereon.
Coke Conveyor Belt Easement Area has the meaning given such term in Section 2.3(C) of this Exhibit A.

Related to Coke Conveyor Belt Easement Area

  • Easement Area means the area of the servient lot marked on the survey-strata plan as being subject to the relevant easement; and

  • Built-Up Area and/or “Covered Area” in relation to a Flat shall mean the floor area of that Flat including the area of balconies and terraces, if any attached thereto, and also the thickness of the walls (external or internal) and the columns and pillars therein Provided That if any wall, column or pillar be common between two Flats, then one-half of the area under such wall column or pillar shall be included in the built-up area of each such Flat.

  • Utility easement means a right held by a facility operator to install, maintain, and access an underground facility or pipeline.

  • ILUA Area means the geographical area in relation to which the Framework ILUA applies, as specified in Schedule 2 of the Framework ILUA;

  • Water Surface Elevation (WSE means the height, in relation to NAVD 1988, of floods of various magnitudes and frequencies in the floodplains of riverine areas.

  • Water surface elevation means the height, in relation to the National Geodetic Vertical Datum (NGVD) of 1929, the North American Vertical Datum (NAVD) of 1988, or other datum, where specified, of floods of various magnitudes and frequencies in the floodplains of riverine areas.

  • Ground water means water below the land surface in a zone of saturation.

  • Coastal area means coastal area as defined in section 22a-93(3) of the Connecticut General Statutes. “Coastal waters” means coastal waters as defined in section 22a-93(5) of the Connecticut General Statutes. “Commissioner” means commissioner as defined in section 22a-2(b) of the Connecticut General Statutes.

  • Conservation easement means that term as defined in section 2140 of the natural resources and environmental protection act, 1994 PA 451, MCL 324.2140.

  • Easement Agreement means any conditions, covenants, restrictions, easements, declarations, licenses and other agreements listed as Permitted Encumbrances or as may hereafter affect the Leased Premises.

  • Storage area means any location, facility, or vehicle which is used to store, to transport, or to secure a radiographic exposure device, a storage container, or a sealed source when it is not in use and which is locked or has a physical barrier to prevent accidental exposure, tampering with, or unauthorized removal of the device, container, or source.

  • Adjacent area means the area outside the affected area or permit area where air, surface or ground water, fish, wildlife, vegetation or other resources protected by Chapter 1513. of the Revised Code, determined according to the context in which "adjacent area" is used, are or reasonably could be expected to be adversely affected by proposed coal mining and reclamation operations including probable impacts from underground workings. With respect to underground mining operations, "adjacent area" shall include, at a minimum, the surface areas above full coal recovery areas.

  • Parcel 2 COMMON AREA APPURTENANT TO EACH COMMERCIAL UNIT PARCEL 3: NONEXCLUSIVE EASEMENTS PARCEL C (COMPRISING PARCEL 1, PARCEL 2, AND PARCEL 3,) PARCEL 1;

  • Basal area means the effective surface area available to transmit the treated effluent from the filter media in a mound system into the in-situ receiving soils. The perimeter is measured at the interface of the imported fill material and in-situ soil. On sloping sites, only the area down-gradient from the up-slope edge of the distribution media may be included in this calculation.

  • Drainage area means a geographic area within which stormwater, sediments, or dissolved materials drain to a particular receiving waterbody or to a particular point along a receiving waterbody.

  • Basement means any area of the building having its floor subgrade (below ground level) on all sides.

  • Project site, where applicable, means the place indicated in bidding documents.

  • Plant Site (Works, Factory) means the local integration of one or more plants, with any intermediate administrative levels, which are under one operational control, and includes common infrastructure, such as:

  • Local Access and Transport Area (LATA) Shall have the meaning set forth in 47 U.S.C.

  • The Project Site, where applicable, means the place or places named in the SCC.

  • Survey Area means the area of land or waters the subject of a Survey, or proposed to be the subject of a Survey.

  • Tract means 2 or more parcels that share a common property line and are under the same ownership.

  • Agreement Area means the area to which this NSHA applies, being the land and waters described in Schedule 3.

  • CONE Area means the areas listed in Tariff, Attachment DD, section 5.10(a)(iv)(A) and any LDAs established as CONE Areas pursuant to Tariff, Attachment DD, section 5.10(a)(iv)(B).

  • Loading Zone means a parking stall which is set aside for use by commercial vehicles if there is a sign referable to that stall marked ‘Loading Zone’;

  • Local Access and Transport Area or "LATA” has the meaning given to the term in the Act.