Each Transmission Owner shall include in its respective load control area its share of the output of the Colstrip Units #1 and #2 and the Project.
The visibility improvements for the various NOX control options for Colstrip Units 1 and 2 can be seen in our proposal action and in general are much lower than those for Hunter and Huntington.See 77 FR 23988, 24026–27, 24034–35(Apr.
The Transmission Operator shall take all or some portion of Transmission System series capacitors out of service, reduce available Transmission System Capacity or take other reasonable action to avoid SSR on Colstrip Units #1 and #2 or the Project.
This action will finalize a SIP approval for a revision to Montana’s Smoke Management plan and a source- specific Regional Haze FIP for imposing federal controls to meet BART requirements for PM, NOX and SO2 emissions on five specific units at four sources in Montana (Ash Grove, Holcim, Colstrip Units 1 and 2, and Corette) and imposing controls to meet RP requirements for NOX emissions at one additional source (Devon) in Montana.
Montana/Puget shall bear all costs of planning, engineering, acquisition, construction, operation and maintenance of any relay protection against SSR that is installed on Colstrip Units #1 and #2.
This section also applies to each owner and operator of CFAC and M2 Green Redevelopment LLC, Missoula site.NOTE TO PARAGRAPH (a): On June 9, 2015,the NOX and SO2 emission limits for Colstrip Units 1 and 2 and Corette were vacated by court order.(b) Definitions.
In one specific comment, the commenter stated:A projected 0.066 dv is not a visibility improvement that ‘may reasonably be anticipated to result from the use’ of additional scrubber vessels at Colstrip Units 1 and 2.
Puget’s 50% interest in Colstrip Units 1 and 2 must be utilized for the production of power that is provided for rate- regulated customers.
As noted in Fact 11, Puget owns the other 50% undivided interest in Colstrip Units 1 and 2.
PPLM contends that application of “step-up” methodology suggested by one of its officials results in a proper valuation of PPLM’s PCE at approximately $102,890,000.5. Equalization of Values PPLM claims that its hydroelectric generation assets are not equalized with Avista’s hydroelectric generation facility at Noxon Rapids, and that its partial interests in Colstrip Units 1 and 2 are not equalized with Puget’s partial interests in the same facilities.