Examples of Colstrip Units 1 and 2 in a sentence
Factors that determine which level of availability best suits M-DCPS’ environment include quality of available data, legal environment, and previous levels of inclusion of M/WBE in bidding and contracting activity.
The visibility improvements for the various NOX control options for Colstrip Units 1 and 2 can be seen in our proposal action and in general are much lower than those for Hunter and Huntington.See 77 FR 23988, 24026–27, 24034–35(Apr.
This action will finalize a SIP approval for a revision to Montana’s Smoke Management plan and a source- specific Regional Haze FIP for imposing federal controls to meet BART requirements for PM, NOX and SO2 emissions on five specific units at four sources in Montana (Ash Grove, Holcim, Colstrip Units 1 and 2, and Corette) and imposing controls to meet RP requirements for NOX emissions at one additional source (Devon) in Montana.
In one specific comment, the commenter stated:A projected 0.066 dv is not a visibility improvement that ‘may reasonably be anticipated to result from the use’ of additional scrubber vessels at Colstrip Units 1 and 2.
Sawn softwood: 1 38 x 152mm Rafters in lengths exceeding 3,9m and not exceeding 6,6m m 51 2 76 x 38mm Wall plates m 19 3 50 x 76mm Purlins in lengths exceeding 3,9m and not exceeding 6,6m m 51 Sundries: 4 Two coats creosote on sawn timbers m2 36 5 6mm Diameter galvanised wire tie 3000mm girth wrapped around rafter and purlin with ends tied together No 22 6 Hurricane clips No 55 EAVES, VERGES, ETC.
That portion of the Common Facilities allocated to Colstrip Units #1 and #2, is part of the Project, as that term is defined in the #1 & #2 Owners Agreement.
In both cases the optimum value of e2 (obtained numerically through a grid search) is attained after a moderate number of iterations (around 500 and 1600 respectively for a stopping condition |eˆ2[n + 1] − eˆ2[n]| < 10−5).
PPL Montana hereby assigns to the Owner Lessor the Owner Lessor's Percentage of PPL Montana's right, title, and interest under the Operating Agreement 1-2 as "Owner" of a 50% undivided interest in Colstrip Units 1 and 2.
Colstrip Units 1 and 2 each provide approximately 307 MW of generating capacity.
Director rotations Under the Constitution, any Director appointed by the Directors as an addition to the existing Directors or to fill a casual vacancy (a ‘‘Casual Appointment’’) holds office until the conclusion of the next annual general meeting of the Company following his or her appointment.