Examples of Construction and/or Manufacture Documents in a sentence
The Construction and/or Manufacture Documents shall be in the custody and care of the Contractor during the Contract.
If the Construction and/or Manufacture Documents or Works are not in accordance with the Contract, the rectification shall not constitute a Variation.
The Contractor shall keep, on the Site, one complete set of the documents forming the Contract, the Construction and/or Manufacture Documents, Variations, other communications given or issued from time to time and the documents/samples mentioned in Sub-clause 5.3. The Employer, the Engineer and their Assistants (as referred to in Sub-clause 3.3) shall have the right to access these documents at all reasonable times.
The design, the Construction and/or Manufacture Documents, the execution and the completed Works (including remedying of defects therein) shall comply with the specifications, technical standards, building construction, safety and environmental regulations and other standards specified in the Employer's Requirements applicable to the Works or defined by the applicable laws and regulations.
The Contractor shall remedy any defects in the Works, as directed by the Engineer.(b) The Contractor shall design (to the extent required & specified in the Contract)manufacture, procure, supply, execute, install, complete, test (including Integrated Testing) and commission the Works, including providing Construction and/or Manufacture Documents within the Time for Completion and shall remedy the defects within the Contract Period.
The Contractor's Representative shall give his whole time to directing the preparation of the Construction and/or Manufacture Documents and the execution of the Works.
Care also involved supervision of pediatric residents and medical students.
Prior to the issue of any Taking Over Certificate, the Contractor shall submit to the Engineer one soft copy and four printed copies of the relevant "as-built drawings", and any further Construction and/or Manufacture Documents specified in the Employer's Requirements.
The Contractor shall design, if in the scope of work, manufacture, execute, install, complete, test (including Integrated Testing as the case may be) and commission, the Works, including providing Construction and/or Manufacture Documents, within the Time for Completion and shall remedy any defects within the Contract Period.
The Contractor shall keep on Site one complete set of the documents forming the Contract the Construction and/or Manufacture Documents, Variations, other communications given or issued from time to time and the documents/samples mentioned in Sub-Clause 5.3. The Employer, the Engineer and their assistants (as referred to in Sub-Clause 3.3) shall have the right to access these documents all reasonable times.