Construction Measurement Period definition

Construction Measurement Period means the period commencing on the Signature Date and ending on the day immediately preceding the Commercial Operation Date;

Examples of Construction Measurement Period in a sentence

  • In the light of this the project Company has committed to 0.58% of the Total Project Value in the Construction Measurement Period, whereas Project Value in respect of the Construction Measurement Period means the capital costs and costs of services procured for the Construction of the Facility or Facilities constituting a Project excluding any Excluded Amounts, to be spent on the development of its suppliers.

  • TABLE 2.2 – Committed Obligations with regard to Local Content13 SUB-ELEMENT(S) 1.2 For purposes of Table 2.2 above, reference to Committed Obligations (Local Content Obligations) shall refer to the Seller’s undertaking and commitment that the Seller and its Contractors shall during the Construction Measurement Period ensure that the Value of Local Content Spend is not less than [18%] in relation to the Project.

  • Economic Development Elements 5.1 The Economic Development requirements to be met by the Seller and its Contractors in the Construction Measurement Period and the Operating Measurement Period are contained in this Schedule 2 (Economic Development Obligations).

Related to Construction Measurement Period

  • Applicable Measurement Period means the most recently completed four consecutive fiscal quarters of the Issuer immediately preceding the Applicable Calculation Date for which internal financial statements are available.

  • Performance Measurement Period has the meaning set forth in Section 3.1(e)(ii).

  • Construction Period means the period commencing from the Appointed Date and ending on the date of the Completion Certificate;

  • Construction Completion Date means the Completion Date of the Construction as specified in the Statutory Declaration of Completion for the Project;

  • Measurement Period shall have the meaning specified in Section 14.01(b)(i).

  • Project Completion Date means the date on which the Completion Certificate is issued;

  • Reference evapotranspiration or “ETo” means a standard measurement of environmental parameters which affect the water use of plants. ETo is given expressed in inches per day, month, or year as represented in Appendix C of these Guidelines, and is an estimate of the evapotranspiration of a large field of four to seven-inch tall, cool-season grass that is well watered. Reference evapotranspiration is used as the basis of determining the Maximum Applied Water Allowances.

  • project completion period means the period of sixty (60) months commencing from and expiring on for the construction and obtaining of Temporary Occupation Permit or Permits for the whole of the Development as provided in clause 3.3;

  • Baseline Period means the period used to determine the baseline emission rate for each regulated pollutant under OAR 340 division 222.

  • Construction Commencement Date means the date set out in the Addendum, if applicable, by which you must commence construction of the Hotel. For the Hotel to be considered under construction, youmust have begun to pour concrete foundations for the Hotel or otherwise satisfied any site-specific criteria for “under construction” set out in the Addendum.

  • Adjusted Total turnover means the turnover in a State or a Union territory, as defined under sub-section (112) of section 2, excluding the value of exempt supplies other than zero-rated supplies, during the relevant period;

  • Measurement means metered volumes at a custody transfer meter through a turbine, Coriolis, or such other meter.

  • Construction Phase means that Phase of the Project which shall commence after the Authority provides the Trade Contractor with written Notice to Proceed with the Construction Phase.

  • Continuous parameter monitoring system or "CPMS" means all of the equipment necessary to meet the data acquisition and availability requirements of this chapter, to monitor process and control device operational parameters (for example, control device secondary voltages and electric currents) and other information (for example, gas flow rate, oxygen or carbon dioxide concentrations), and to record average operational parameter value on a continuous basis.

  • Required Reserve Factor Floor means, for any Calculation Period, the sum (expressed as a percentage) of (a) 28.00% plus (b) the product of the Adjusted Dilution Ratio and the Dilution Horizon Ratio, in each case, as of the immediately preceding Cut-Off Date.

  • Model Year means the CI engine manufacturer’s annual production period, which includes January 1st of a calendar year, or if the manufacturer has no annual production period, the calendar year.

  • SONIA Compounded IndexStart means, with respect to an Interest Accrual Period, the SONIA Compounded Index determined in relation to the day falling the Relevant Number of London Banking Days prior to the first day of such Interest Accrual Period; and

  • Construction Completion means physical construction of a cleanup action component is complete.

  • Adjustment Period means the period from the Effective Date up to and including the Expiry Time;

  • Project Year means the twelve-month period beginning from the Effective Date and ending twelve months thereafter (the First Project Year), and any twelve-month period beginning at the end of the First Project Year, or the end of subsequent Project Years;

  • Initial compliance period means the three-year compliance period that begins January 1, 1993, except for the MCLs for dichloromethane, 1,2,4-trichlorobenzene, 1,1,2-trichloroethane, benzo(a)pyrene, dalapon, di(2-ethylhexyl)adipate, di(2-ethyl- hexyl)phthalate, dinoseb, diquat, endothall, endrin, glyphosate, hexachlorobenzene, hexachlorocyclopentadiene, oxamyl, picloram, simazine, 2,3,7,8-TCDD, antimony, beryllium, cyanide, nickel, and thallium, as they apply to a supplier whose system has fewer than 150 service connections, for which it means the three-year compliance period that began on January 1, 1996.

  • Project Completion means the date, as determined by the Division after consultation with the Recipient, that operation of the Project is initiated or is capable of being initiated, whichever comes first.

  • Continuous parameter monitoring system (CPMS means all of the equipment necessary to meet the data acquisition and availability requirements of the Prevention of Significant Deterioration program, to monitor process and control device operational parameters (for example, control device secondary voltages and electric currents) and other information (for example, gas flow rate, O2 or CO2 concentrations), and to record average operational parameter value(s) on a continuous basis.

  • Substantial Completion Date means the date on which Substantial Completion occurs.

  • Measurement Point means the emission source for which continuous emission measurement systems (CEMS) are used for emission measurement, or the cross-section of a pipeline system for which the CO2 flow is determined using continuous measurement systems;

  • Lateral expansion means a horizontal expansion of the waste boundaries of an existing MSW landfill. A lateral expansion is not a modification unless it results in an increase in the design capacity of the landfill.