Examples of Covered Flare in a sentence
An “unplanned” outage is an outage of a Covered Flare that either is scheduled less than 30 Days in advance or is unscheduled.
Taking a Covered Flare “permanently out of service” means physically removing piping in the Flare header or physically isolating the piping with a welded blind so as to eliminate direct piping to the Covered Flare and surrendering any permit to operate such Covered Flare.
For the water seal drum associated with the respective Covered Flare, the pressure difference between the inlet pressure and the outlet pressure is less than the water seal pressure as set by the static head of water between the opening of the dip tube in the drum and the level setting weir in the drum; b.
Determining Whether a Covered Flare that has a Water Seal is Not Receiving Potentially Recoverable Gas Flow.
If the Defendants intend to request that the United States or LDEQ agree to a transferee’s assumption of any obligations of the Consent Decree, the Defendants must condition the transfer of the Covered Facility or Covered Flare upon the transferee’s written agreement to execute a modification to the Consent Decree that makes the terms and conditions of the Consent Decree applicable to, binding upon, and enforceable against the transferee.
The Defendants must use flow rate data for the one-year period of time ending 180 Days before the submission of the Initial WGMP to determine the Baseload Waste Gas Flow Rate, in scfd, to each Covered Flare or to the set of Covered Flares that are connected on a Flare loop.
The Defendants must operate each Covered Flare with a pilot flame present at all times.
Using all available information including, but not limited to, instrumentation, isotopic tracing, and/or engineering calculations, the Defendants must identify and estimate the flow from each process unit header (sometimes referred to as a “subheader”) to the main header(s) servicing each Covered Flare.
By no later than the Effective Date, while each Covered Flare that is actively receiving Perimeter Assist Air is In Operation, the Defendants must maintain the net heating value dilution parameter (NHVdil) at or above 22 BTU/square foot determined on a 15-minute block period basis.
The Defendants must operate each of the instruments and monitoring systems required by Paragraphs 20 and 22-23 and collect data on a continuous basis when the Covered Flare that the instrument and/or monitoring system is associated with is In Operation and Capable of Receiving Sweep, Supplemental, and/or Waste Gas, except for the periods of instrument downtime specified in sub-Paragraphs 45(a)-(d).B.