Date for Installation definition

Date for Installation means the dates set out in the Delivery Schedule by which the Contractor is to install the Supplies and Services at the Installation Site(s);

Examples of Date for Installation in a sentence

  • The Owner shall extend the Date for Installation Completion where the Solar System Installation have been delayed in reaching Installation Completion as a result of:regarding fees for cancellation, in line with the termination rights specified in this Contract, provided that such cancellation fees do not amount to unfair contract terms at law.

  • Item No.Related ServicesDelivery Schedule (Duration)LocationCompletion Date for Installation, commissioning andacceptance.1Supply of Water ATM cited aboveA maximum of 6 (six) months for the date ofsigning of contractAizawlLatest by the last date of the 7th month from the date of signing of Contract Agreement.

  • Date for Installation and commissioning of Lapping Machine in KAPP 3,4 site will be.

Related to Date for Installation

  • Nuclear installation means any installation of such class or description as may be prescribed by regulations made by the relevant Secretary of State from time to time by statutory instrument, being an installation designed or adapted for:

  • Standard Installation means the installation of drop cable to a customer’s premise where the distance from the point of entry into the building being served is less than 150 feet from the active cable television system plant.

  • electrical installation means an electrical installation as defined in the Regulations;

  • Installation Site means the site at which the Product is originally installed.

  • Adjusted for inflation means increased in accordance with the formula for inflation adjustment set forth in Exhibit C to the Master Settlement Agreement.