For more information visit our privacy policy.Commencement of Construction means the commencement of construction of foundation components or elements (such as footings, rafts or piles) for the home.
Scheduled Construction Period means the period commencing from the Appointed Date and ending on Scheduled Completion Date;
Commence Construction means that an owner or operator has either undertaken a continuous program of construction or has entered into a contractual obligation to undertake and complete, within a reasonable time, a continuous program of construction.
Commenced Construction means (a) all of the following site preparation work is completed: ingress and egress routes exist; the site on which the Project will be located is cleared and graded; there is power service to the site; footings are prepared; and foundations have been poured consistent with purchased equipment specifications and project design; or (b) the following financial commitments have been made: (i) (A) an engineering, procurement, and construction contract (“EPC”) has been executed by all parties and is effective; or (B) contracts (collectively, “EPC Equivalents”) for all of the following have been executed by all parties and is effective: (1) project engineering, (2) procurement of all major equipment, and (3) construction of the Project, and (ii) the cumulative payments made by the Developer under the EPC or EPC Equivalents to the counterparties to those respective agreements is equal to at least thirty (30) percent of the total costs of the EPC or EPC Equivalents.
Contribution in aid of construction, as used in this subrule, means a nonrefundable cash payment grossed-up for the income tax effect of such revenue covering the costs of a distribution main extension or service line that are in excess of costs paid by the utility. The amount of tax shall be reduced by the present value of the tax benefits to be obtained by depreciating the property in determining the tax liability.
Start of construction means the date the development permit was issued, provided the actual start of construction, repair, reconstruction, or improvement was within 180 days of the permit date. The actual start means the first placement of permanent construction of the structure such as the pouring of slabs or footings, installation of piles, construction of columns, or any work beyond the stage of excavation, and includes the placement of a manufactured home on a foundation. (Permanent construction does not include initial land preparation, such as clearing, grading and filling; nor does it include the installation of streets and/or walkways; nor does it include excavation for a basement, footings, piers or foundations or the erection of temporary forms; nor does it include the installation on the property of buildings appurtenant to the permitted structure, such as garages or sheds not occupied as dwelling units or part of the main structure. (NOTE: accessory structures are NOT exempt from any ordinance requirements) For a substantial improvement, the actual start of construction means the first alteration of any wall, ceiling, floor, or other structural part of a building, whether or not that alteration affects the external dimensions of the building.
Completion of Construction means all the construction is complete except for minor weather-related components and conforms to the approved plans and specifications and change orders.
Cost of Construction means the total cost to Owner of those portions of the entire Project designed or specified by the Design Professional. Cost of Construction does not include the Design Professional's compensation and expenses and Owner's expenses associated with the Project or the cost of other services to be provided by others to the Owner.
Beginning teacher means a teacher who:
Original construction ’ shall mean the first or initial construction
Date of Commencement means the date designated in the Notice to Proceed for Contractor to commence the Work.
Date of application means the ef- fective date of an Application for Com- pensation filed with A.I.D. pursuant to§ 204.21 of this part.
similar stage of construction means the stage at which:
Date of Commencement of Risk means the date specified in the Schedule (unless the Policyholder is informed otherwise by the Company) from which the risk cover of the Life Assured commences under the Policy.
Interest Commencement Date means the Issue Date or such other date as may be specified in the relevant Final Terms.
Annuity Commencement Date is the first day of the month an annuity begins under this contract. This date may not be later than the date a Participant's periodic benefits are required to commence under the Code.
Beginning farmer means an individual, partnership, family farm corporation, or family farm limited liability company, with a low or moderate net worth that engages in farming or wishes to engage in farming.
Date of commencement of the project means the date of the agreement.
Date of Agreement as used herein shall be the date when by execution and delivery (as defined in paragraph 20.2) of this document or a subsequent counteroffer thereto, Xxxxx and Seller have reached agreement in writing whereby Seller agrees to sell, and Xxxxx agrees to purchase, the Property upon terms accepted by both Parties.
Benefit Commencement Date means, for any Participant or beneficiary, the date as of which the first benefit payment, including a single sum, from the Participant’s Account is due, other than pursuant to a withdrawal under Article VIII.
the commencement date means the date on which the Contract shall take effect, as notified by the Authority to the Contractor in a letter awarding the Contract.
Means and Methods of Construction means the labor, materials, temporary structures, tools, plant, and construction equipment, and the manner and time of their use, necessary to accomplish the result intended by this Contract.
Amendment No. 3 Effective Date has the meaning specified in Amendment No. 3.
Residential construction means construction on single-family or two-family dwellings occupied or used, or intended to be occupied or used, primarily for residential purposes, and includes real property pursuant to chapter 499B.
Guaranteed Construction Start Date means the Expected Construction Start Date, as such date may be extended by the Development Cure Period.
Service Commencement Date means the date the Transmission Provider begins to provide service pursuant to the terms of an executed Service Agreement, or the date the Transmission Provider begins to provide service in accordance with Tariff, Part II, section 15.3 or Tariff, Part III, section 29.1.