Deliverability Assessment definition

Deliverability Assessment has the meaning set forth in the CAISO Tariff.

Examples of Deliverability Assessment in a sentence

  • The study shall identify and detail the system impacts that would result if the Generating Facility(ies) were interconnected without identified project modifications or system modifications, as provided in the On-Peak Deliverability Assessment or Off-Peak Deliverability Assessment, and other potential impacts, including but not limited to those identified in the Scoping Meeting as described in the GIP.

  • Area Off-Peak Constraints - A transmission system operating limit that would cause excessive curtailment to a substantial number of Generating Facilities during Off-Peak Load conditions, as described in Section 6.3.2.2 of Appendix DD and the CAISO Off-Peak Deliverability Assessment posted on the CAISO Website.

  • The Deliverability Assessment On-Peak case modeled a 25,845 MW load in SCE system with an import target as shown in Table 4.2. The Off-Peak case modeled a 16,140 MW load in SCE system.

  • The study shall identify and detail the system impacts that would result if the Generating Facility(ies) were interconnected without identified project modifications or system modifications, as provided in the On-Peak Deliverability Assessment or Off-Peak Deliverability Assessment, and other potential impacts, including but not limited to those identified in the Scoping Meeting as described in the CLGIP.

  • The Generating Facility’s aggregate output as evaluated in the Deliverability Assessment cannot increase as the result of any transfer, but may decrease based on the assignee’s characteristics and capacity.

  • The results will be based on the current Deliverability Assessment methodology.

  • Full Capacity Deliverability Status (FCDS) – The condition whereby a Generating Facility interconnected with the Distribution System, under coincident ISO Control Area peak demand and a variety of severely stressed system conditions, can deliver the Generating Facility’s full output to the aggregate of load on the ISO Grid, consistent with the ISO’s reliability criteria and procedures and the ISO’s On-Peak Deliverability Assessment.

  • The purpose of a draft Concept Report is to enable the City to complete the ARC Project Deliverability Assessment and prepare the project for the GDOT concept phase (should the project receive federal funding in the future).

Related to Deliverability Assessment

  • conformity assessment means the process demonstrating whether the requirements of this Regulation relating to a device have been fulfilled;

  • Risk assessment means a programme to determine any risk associated with any hazard at a construction site, in order to identify the steps needed to be taken to remove, reduce or control such hazard;

  • Phase I assessment as described in, and meeting the criteria of, (i) Chapter 5 of the FNMA Multifamily Guide or any successor provisions covering the same subject matter in the case of a Specially Serviced Mortgage Loan as to which the related Mortgaged Property is multifamily property or (ii) the American Society for Testing and Materials in the case of Specially Serviced Mortgage Loan as to which the related Mortgaged Property is not multifamily property.

  • Impact Assessment has the meaning given to it in Clause 22.1.3 (Variation Procedure);

  • conformity assessment body means a body that performs conformity assessment activities including calibration, testing, certification and inspection;

  • Environmental and Social Impact Assessment or “ESIA” means a site-specific report, to be prepared in accordance with the parameters laid down in the ESMF (as hereinafter defined) and acceptable to the Association, identifying and assessing the potential environmental and social impacts of the activities to be undertaken for the Project, evaluating alternatives, and designing appropriate mitigation, management, and monitoring measures.

  • Site Assessment means an environmental assessment report for the Mortgaged Property prepared at Borrower’s expense by a qualified environmental consultant engaged by Borrower, or by Lender on behalf of Borrower, and approved by Lender, and in a manner reasonably satisfactory to Lender, based upon an investigation relating to and making appropriate inquiries to evaluate the risks associated with Mold and any existence of Hazardous Materials on or about the Mortgaged Property, and the past or present discharge, disposal, release or escape of any such substances, all consistent with the most current version of the ASTM 1527 standard (or any successor standard published by ASTM) and good customary and commercial practice.

  • Phase I Environmental Assessment A “Phase I assessment” as described in, and meeting the criteria of, the ASTM, plus a radon and asbestos inspection.

  • Needs assessment In this section, LEAs are asked to describe the impact of the pandemic on their students, examine disproportionate impacts on specific student groups, and highlight the LEA’s promising practices in supporting students’ needs since March 2020.

  • Own risk and solvency assessment means a confidential internal assessment, appropriate to the nature, scale, and complexity of an insurer or insurance group, conducted by that insurer or insurance group of the material and relevant risks associated with the insurer or insurance group's current business plan, and the sufficiency of capital resources to support those risks.

  • Environmental Impact Assessment means a systematic examination conducted to determine whether or not a programme, activity or project will have any adverse impacts on the environment;

  • Phase II means the second part of the tuition incentive assistance program which provides assistance in the third and fourth year of 4-year degree programs.

  • Phase I means the first part of the tuition incentive assistance program defined as the academic period of 80 semester or 120 term credits, or less, leading to an associate degree or certificate.

  • Environmental Assessment means an assessment of the presence, storage or release of any hazardous or toxic substance, pollutant or contaminant with respect to the collateral securing a Shared-Loss Loan that has been fully or partially charged off.

  • Family assessment means a comprehensive assessment of child

  • Medical assessment means an assessment of a patient’s medical condition secured by our Assistance Company working in conjunction with the Medical Evacuation Provider’s medical director and in collaboration with the attending physician. The Assistance Company in collaboration with the Medical Evacuation Provider, will utilize the assessment to determine at its sole discretion whether a Plan Holder is fit to fly; the most appropriate means to provide medical evacuation; the medical personnel who will be accompanying the patient on the transport; and to confirm the medical facility closest to one’s home can meet their medical needs. If the patient’s medical facility of choice is unable to provide the high level of medical care required by the patient, arrangements will be made to transport the patient to the appropriate medical facility closest to their home, or closest to patient's preferred medical facility in the US when possible.

  • Preliminary assessment means the first phase in the process of identifying areas of concern and determining whether contaminants are or were present at a site or have migrated or are migrating from a site, and shall include the initial search for and evaluation of, existing site specific operational and environmental information, both current and historic, to determine if further investigation concerning the documented, alleged, suspected or latent discharge of any contaminant is required. The evaluation of historic information shall be conducted from 1932 to the present, except that the department may require the search for and evaluation of additional information relating to ownership and use of the site prior to 1932 if such information is available through diligent inquiry of the public records.

  • Assessment of Compliance As defined in Section 3.21.

  • Data Protection Impact Assessment means an assessment by the Controller of the impact of the envisaged processing on the protection of Personal Data.

  • Expedited Deliverability Study means a deliverability study that an eligible Developer may elect to pursue as that term is defined in OATT Section 25 (OATT Attachment S) that may determine the extent to which an existing or proposed facility satisfies the NYISO Deliverability Interconnection Standard at its requested CRIS level without the need for System Deliverability Upgrades. The schedule and scope of the study is defined in Sections 25.5.9.2.1 and 25.7.1.2 of this Attachment S.

  • Locational Deliverability Area Reliability Requirement means the projected internal capacity in the Locational Deliverability Area plus the Capacity Emergency Transfer Objective for the Delivery Year, as determined by the Office of the Interconnection in connection with preparation of the Regional Transmission Expansion Plan, less the minimum internal resources required for all FRR Entities in such Locational Deliverability Area.

  • Acoustic Assessment Report means the report, prepared in accordance with Publication NPC-233 and Appendix A of the Basic Comprehensive User Guide,by HGC Engineering and dated August 22, 2008 submitted in support of the application, that documents all sources of noise emissions and Noise Control Measures present at the Facility and includes all up-dated Acoustic Assessment Reports as required by the Documentation Requirements conditions of this Certificate to demonstrate continued compliance with the Performance Limits following the implementation of any Modification.

  • Independent Engineering Report means a report, in form and substance satisfactory to the Administrative Agent and each of the Lenders, prepared by an Independent Engineer, addressed to the Administrative Agent and the Lenders with respect to the Oil and Gas Properties owned by the Borrower or its Subsidiaries (or to be acquired by the Borrower or any of its Subsidiaries, as applicable) which are or are to be included in the Borrowing Base, which report shall (a) specify the location, quantity, and type of the estimated Proven Reserves attributable to such Oil and Gas Properties, (b) contain a projection of the rate of production of such Oil and Gas Properties, (c) contain an estimate of the net operating revenues to be derived from the production and sale of Hydrocarbons from such Proven Reserves based on product price and cost escalation assumptions specified by the Administrative Agent and the Lenders, and (d) contain such other information as is customarily obtained from and provided in such reports or is otherwise reasonably requested by the Administrative Agent or any Lender.

  • Phase I Environmental Site Assessment means a Phase I environmental property assessment of the Assets that satisfies the basic assessment requirements set forth under the current ASTM International Standard Practice for Environmental Site Assessments (Designation E1527-13) or any other visual site assessment or review of records, reports or documents.

  • Geotechnical engineer means a professional engineer registered with the Association of Professional Engineers, Geologists, and Geophysicists of the Northwest Territories and whose principal field of specialization is the design and construction of earthworks in a permafrost environment;

  • Quality Assurance means a systematic procedure for assessing the effectiveness, efficiency, and appropriateness of services.