Design Completion definition

Design Completion. Design shall be considered complete upon the Respondentssubmission of approvable plans and specifications to the Department for review.
Design Completion means the completion of the development of a Joint Product as evidenced by the written agreement of the PEC.

Examples of Design Completion in a sentence

  • All expenses incidental to performing Consultant’s Basic Services including, but not limited to, overtime, reproduction of documents and other materials associated with Respondent’s deliverables and presentation materials; reproduction of construction contractor’s submittals; reproduction of Design Completion Consultants’ submittals; transportation and subsistence; telephone, computer, facsimile, or other similar costs; and the like, shall be included within the Contract Price.

  • All expenses incidental to performing Consultant’s Basic Services including, but not limited to, reproduction of documents and other materials associated with Respondent’s deliverables and presentation materials; reproduction of construction contractor’s submittals; reproduction of Design Completion Consultants’ submittals; transportation and subsistence; telephone, computer, facsimile, or other similar costs; and the like, shall be included within the Contract Price.

  • Phase II Design Completion and Commencement of Fabrication & Site Work Date: a.

  • Final Design Completion: (Phase 1)Contractor shall complete final design of the core project within two (2) weeks of execution of this Contract.

  • Design Completion Reviews:Schedule and conduct the project milestone design reviews.

  • The following table lists the design milestones and statuses for Appendix A of the Agreement.Table 2 – Design Completion Milestones*The table in Section VIII.0 of this report indicates certification of completed activities.

  • Contractor shall commence the Design Services within 5 days of receiving the Notice to Proceed (NTP) ("Design Commencement Date"), diligently and continuously prosecute the Design Services until the completion of the Design Services, meet all Interim Dates, and complete the Final Design by the Final Design Completion Date.

  • Based on the Tentative Project Schedule and Specific Project Schedule Requirements below, the Offeror shall develop a preliminary project schedule covering the period from Notice to Proceed (NTP) through Design Completion based on anticipated workload and resources and include it as part of the Offeror’s proposal response to Section III Part B, Article 2 Methods.

  • Phase I (up to 60% Design Completion) Planning - up to 5% and or 10% of the project will consist of engineering evaluation, assessment and concept development as listed below.

  • Planned Preliminary Engineering/NEPA Completion Date: [insert date] [insert date] Planned Final Design Completion Date: [insert date] [insert date] Planned Construction Substantial Completion Date: [insert date] [insert date] Budget: [ If any amounts listed in sections 3–4 of schedule D differ from the budget presented in the application, describe the changes here and provide an explanation of the cause of those changes.

Related to Design Completion

  • Project Completion means the date, as determined by the Division after consultation with the Recipient, that operation of the Project is initiated or is capable of being initiated, whichever comes first.

  • Construction Completion means physical construction of a cleanup action component is complete.

  • Mechanical Completion means that (a) all components and systems of the Project have been properly constructed, installed and functionally tested according to EPC Contract requirements in a safe and prudent manner that does not void any equipment or system warranties or violate any permits, approvals or Laws; (b) the Project is ready for testing and commissioning, as applicable; (c) Seller has provided written acceptance to the EPC Contractor of mechanical completion as that term is specifically defined in the EPC Contract.

  • Substantial Completion means the stage in the progress of the work as determined and certified by the Contracting Officer in writing to the Contractor, on which the work (or a portion designated by the Government) is sufficiently complete and satisfactory. Substantial completion means that the property may be occupied or used for the purpose for which it is intended, and only minor items such as touch-up, adjustments, and minor replacements or installations remain to be completed or corrected which:

  • Testson Completion means the tests which are specified in the Contractor agreed by both Parties or instructed as a Variation, and which are carried out under Clause 9 [Tests on Completion] before the Works or a Section (as the case may be) are taken over by the Procuring Entity.

  • Design flow means the average annual flow or average daily flow specified in an approved facilities plan or approved plans and specifications, the flow specified in a WPDES permit, or the flow required to meet performance standards.

  • Final Completion means the date determined and certified by A/E and Owner on which the Work is fully and satisfactorily complete in accordance with the Contract.

  • Study Completion means the database for the Study has been locked and all Essential Documents have been provided to the Sponsor, including a copy of the letter from the Reviewing HREC acknowledging receipt of the final report and/or closure letter from the Principal Investigator.

  • Construction Completion Date means the Completion Date of the Construction as specified in the Statutory Declaration of Completion for the Project;

  • Tests on Completion means the tests which are specified in the Contract or agreed by both Parties or instructed as a Variation, and which are carried out under Clause 9 [Tests on Completion] before the Works or a Section (as the case may be) are taken over by the Procuring Entity.

  • Design Phase means the period during which the Transporter shall prepare a draft project proposal for publication in accordance with section 4.3;

  • Project Completion Date means the date on which the Completion Certificate is issued;

  • Design-build means a project delivery method in which the detailed design and subsequent construction is provided through a single contract with a Design-Build firm; a team, partnership, or legal entity that includes design professionals and a builder. The Design-Build Project delivery shall be implemented in accordance with Tex. Gov’t Code § 2166.2531.2

  • Design-Builder means the Person selected pursuant to the RFP that enters into the Contract with the Department to design and construct the Project (also referred to as the “Design-Build Team”).

  • Completion means the fulfilment of the Related Services by the Supplier in accordance with the terms and conditions set forth in the Contract.

  • Construction Work means any work in connection with⎯

  • Practical Completion means the completion of the Project where the building is fit for occupancy and/or purpose.

  • Design-build team means an entity that consists of:

  • project completion period means the period of sixty (60) months commencing from and expiring on for the construction and obtaining of Temporary Occupation Permit or Permits for the whole of the Development as provided in clause 3.3;

  • Tenant Improvement Work means the construction of the Tenant Improvements, together with any related work (including demolition) that is necessary to construct the Tenant Improvements.

  • New Work means any Services/Deliverables outside the scope of the Contract and not specifically provided under any Statement of Work, that once added will result in the need to provide the Contractor with additional consideration.

  • Tenant Improvements Defined in Exhibit B, if any.

  • Commissioning means the process for determining the need for and for obtaining the supply of healthcare and related services by the Trust within available resources.

  • piece-work means any system by which earnings are calculated upon the quantity or output of work performed;

  • Project Schedule means a document that, with respect to each Phase of the Project, identifies, coordinates and integrates the anticipated design and construction schedules, the Contracting Authority’s and Owner's responsibilities, government authority reviews and other activities as are necessary for the timely completion of the Work.

  • Phase 1 means the phase of the ATP comprised of: (1) improvements to the State Street Substation; (2) construction of the Proposed Line; (3) the rebuilding of NYSEG’s existing Lines 971 and 000 xxxxx xx Xxxxxxxx Xxxx xx the NYSEG ROW to allow for construction of the Proposed Line as intended; (4) improvements to the Elbridge Substation to accept the Proposed Line; and (5) National Grid’s conveyance to NYSEG of the NYSEG Acquired ROW and such other land interests as contemplated by the Purchase and Sale Agreement.