Examples of Designated Source in a sentence
Designated Source Selection trainers may grant CLPs to source selection attendees.
Reconciliations for these non-GAAP financial measures to the most directly comparable GAAP financial measures are included in the news release.
The general purpose may include, but is not limited to, the purpose of providing the economic coordination of processing, transfer and disposal services for Solid Waste and Designated Source Separated Material(s) generated within the Service Area, including but not limited to the acquisition, construction, financing, refinancing, maintaining, operating, rate setting, rate collection, and regulation of Transfer Facilities.
If the Contractor elects to use a Designated Source, and it is found that the quality or quantity of material producible from the Designated Source does not meet project requirements, and a change of source is necessary for that reason alone, a Change Order with equitable adjustment will be made.
If the Contractor elects to use a Designated Source, and it is found that the quality or quantity of material producible from the Designated Source does not meet project requirements and a change of source is necessary for that reason alone, a Change Order with equitable adjustment will be made.
The location of EPA Designated Source Area 3 (which is hereafter referred to as “Source Area 3”) is shown on the attached Figure F1.The TID occupies the site of the former Mitsubishi Motors Australia Ltd (MMAL) Tonsley Park motor vehicle manufacturing facility.
Dowel adhesive shall be a material listed in the MTO Designated Source for Materials suitable for the application.
This Addendum to the EMP relates to the southern portion of the site contamination audit area (known as EPA Designated Source Area 3, hereafter referred to as Source Area 3), which is located in the south western corner of the Tonsley Innovation District (TID).
Renewal SA has engaged Mr Anthony Lane (the Auditor) of SLR Consulting Australia (SLR) to conduct a restricted scope Site Contamination Audit (SCA) of two non-contiguous areas known as EPA Designated Source Areas 3 and 4.
If the Contractor elects to use a Designated Source, and it is subsequently found that the quality and quantity of material producible from that source is not as represented by the materials report, and a change of source is necessary for that reason alone, a Change Order with equitable adjustment will be made.