Examples of Dispatchable Resource in a sentence
Each Market Participant shall ensure that the entity controlling a Dispatchable Resource offered or made available by that Market Participant complies with the energy dispatch signals and instructions transmitted by the ISO.
The Resource must be a Dispatchable Resource located within the metered boundaries of the New England Control Area and capable of receiving and responding to electronic Dispatch Instructions.
The Dispatchable Resource output must not be ramp rate constrained such that the Dispatchable Resource cannot achieve the optimal desired dispatch point under the economic dispatch.
Energy Schedules between Balancing Authority Areas for which a tag has been identified where the source is a Dispatchable Resource or Load Settlement Location and the sink is a Load Settlement Location.
The ISO shall have the authority to direct any Market Participant to adjust the output, consumption or demand reduction of any Dispatchable Resource within the operating characteristics specified in the Market Participant’s Offer Data, Supply Offer, Demand Reduction Offer or Demand Bid.
Details of the Dispatchable Resource dispatchable energy range adjustment shall be specified in the Market Protocols.
The output of the Non-Dispatchable Resource shall be curtailed equivalent to firm service, where the Resource is: (1) a Qualifying Facility exercising its rights under PURPA to deliver its net output to its host utility; (2) a Non- Dispatchable Resource with Long-Term Service for the full capacity of the Non- Dispatchable Resource; or (3) a Non-Dispatchable Resource receiving monthly short-term firm transmission service, which has a pending request for Long-Term Service.
A Market Participant with a hydro Intermittent Power Resource that is able to operate within a dispatchable range and is capable of responding to Dispatch Instructions to increase or decrease output within its dispatchable range may elect to have that resource dispatched as a DDP Dispatchable Resource.
If a Dispatchable Resource fails to follow the Transmission Provider’s dispatch instructions communicated pursuant to Section 4.1(a)(ii) for six consecutive Dispatch Intervals, that Resource shall be considered a Self- Dispatched Resource until such time that the Market Participant Resource owner demonstrates to the Transmission Provider that such Resource is capable of following the Transmission Provider’s dispatch instructions.
A Non- Dispatchable Resource that is instructed to curtail via an XML notification shall operate at the lower of its (1) curtailment level or (2) actual net output.