Examples of Disposal Ground in a sentence
All resulting debris shall be deposited at a Waste Disposal Ground operating under the authority of Manitoba Regulation #150/91.
The Contractor shall, during and at the completion of construction, clean-up the construction area and all resulting debris shall be deposited at a Waste Disposal Ground operating under the authority of Manitoba Regulation 150/91.
This proposal generally references TILA section 103(aa) to refer to the pre-Dodd-Frank Act provision, which is in effect until the Dodd-Frank Act’s amendments take effect, and TILA section 103(bb) to refer to the amended and renumbered provision.factors, including the fact that HOEPA’s coverage thresholds were set relatively high, HOEPA’s assignee liability provisions make the loans relatively unattractive to secondary market investors, and general compliance burden and perceived stigma.
The Contractor shall, during and at the completion of construction, clean-up the construction area and all resulting debris shall be deposited at a Waste Disposal Ground operating under the authority of Manitoba Regulation #150/91.
Where an ANZECC trigger value guideline is exceeded in two or more surveys and for which background levels do not also exceed the guideline sediment limit, then a sediment quality survey shall be undertaken to representatively determine metal concentrations in the sediments at the Offshore Spoil Disposal Ground (OSDG hereafter).
The Contractor will, during and at the completion of construction, clean up the construction area and all resulting debris shall be deposited at a Waste Disposal Ground operating under the authority of Waste Disposal Grounds Regulation, Manitoba Regulation 150/91.
All dredged material shall be disposed of within the Offshore Spoil Disposal Ground (OSDG) identified by the following NZTM co-ordinates and shown in Plan B.
The consent holder shall every five years undertake in-faunal sampling and analysis of the sediments within and near the Offshore Spoil Disposal Ground, until expiry of this consent.
The consent holder shall within 6 months of the commencement of this consent submit to the Council and Liaison Group a report from a coastal processes engineer detailing the investigations to be carried out into the long term capacity of the Outer Spoil Disposal Ground, as generally outlined in the Worley Parsons report of 2 February 2015 submitted with the application.
The consent holder shall undertake annual hydrographic and side-scan sonar surveys of the Offshore Spoil Disposal Ground.