Effluent Treatment Plant: As a measure of environment protection /pollution control with adoption of new technology, one ETP for Drilling Installation has been commissioned.
Endangers or may endanger the safety of persons or property, the security of the Well or the safety of the Drilling Installation.
In the case of the Bail Reform Act, we placed weight on the fact that the statute applied only to defendants suspected of "the most serious of crimes," Salerno, supra, at 747; see also Foucha, supra, at 81, while the statute in Kansas v.
The Contractor shall submit a preliminary Horizontal Directional Drilling Installation Plan for the HDD post tender process.
Stratigraphic age assignments from published geologic reports and are generalized for units in study areaTable 2-1_SiteHydrostrat_Units_final6-30-06.xls TABLE 3-1 Summary of Well Drilling, Installation, and Testing DetailsInterim Measures 2006 Well Drilling Investigation ReportPG&E Topock Compressor Station Boring ID & Drill Site Location Boring Depth (ft bgs) Borehole Logging Wells Installed Approx.
The principal amount remaining unpaid to suppliers as at the end ofthe year (included in item "a" Sundry Creditors Schedule 11) -- --2.
A Drilling Fluid and Cuttings Management Plan, which may be incorporated in the Horizontal Directional Drilling Installation Plan, that will detail the fluid design, handling, storage, solids control, and containment method, clean up, disposal and monitoring pro- cesses and procedures for the management of the drilling fluids.
The sealed envelope must show the name of the bidder and his address and should be super scribed as “ Tender for Drilling/ Installation of Borewell at Staff Quarters” on the top of the envelope.
The verification report shall be based on a review of the relevant documents, including the Drilling Program or Workover Program, as the case may be, and a detailed physical inspection of the Drilling Installation and equipment and systems, and the performance of such tests as may be appropriate.
The verification report will be based on a review of the relevant documents, including the Drilling Program, a detailed physical inspection of the Drilling Installation equipment and systems, and the performance of such tests as may be appropriate.