Stranded cost means the amount by which the net cost of an
Avoided costs means the incremental costs to an electric utility of electric energy or capacity or both which, but for the purchase from the qualifying facility or qualifying facilities, such utility would generate itself or purchase from another source.
Embedded means the placement of transmission or distribution lines, pipes or cables into the bottom of surface waters by minimal displacement of bottom material and without the creation of a trench, or trough, through the use of techniques such as plowing-in, weighing-in, or non-trenching jets.
embedded generator means a generator who is not a market participant and whose generation facility is connected to a distribution system of a distributor, but does not include a generator who consumes more electricity than it generates;
Embedded Software means one or more software applications which permanently reside on a computing device.
Analytical x-ray equipment means equipment used for x-ray diffraction or fluorescence analysis.
Bondable stranded costs rate order means one or more
Bondable stranded costs means any stranded costs or basic
Derivative Works means any work, whether in Source or Object form, that is based on (or derived from) the Work and for which the editorial revisions, annotations, elaborations, or other modifications represent, as a whole, an original work of authorship. For the purposes of this License, Derivative Works shall not include works that remain separable from, or merely link (or bind by name) to the interfaces of, the Work and Derivative Works thereof.
Personalized license plate means a license plate that has displayed on it a
book cost means the total amount paid to purchase a security, including any transaction charges related to the purchase, adjusted for reinvested distributions, returns of capital and corporate reorganizations;
Standard equipment means the basic configuration of a vehicle which is equipped with all the features that are required under the regulatory acts of the Contracting Party including all features that are fitted without giving rise to any further specifications on configuration or equipment level.
Derivative Work means a work that is based on one or more preexisting works (such as a revision, translation, dramatization, motion picture version, abridgment, condensation, enhancement, modification, or any other form in which preexisting work may be recast, transformed, or adapted) which, if created without the authorization of the copyright owner of the preexisting work, would constitute copyright infringement.
Trip Cost means the dollar amount of Trip payments or deposits paid by the Insured prior the Insured’s Trip Departure Date and shown on any required application which is subject to cancellation penalties or restrictions. Trip cost will also include the cost of any subsequent pre-paid payments or deposits paid by the Insured for the same Trip, after application for coverage under this plan provided the Insured amends the Application to add such subsequent payments or deposits and pays any required additional plan cost prior to the Insured’s Departure Date.
Direct Cost means a cost not to exceed the cost of labor, material, travel and other expenditures to the extent the costs are directly incurred to provide the relevant assistance or service. “Direct Cost” to the Acquirer for its use of any of a Respondent’s employees’ labor shall not exceed the average hourly wage rate for such employee;
Manufacturing Cost means ***
Fixed Equipment means any property affixed in any way to the Licensed Premises existing at the time Notice to Proceed is given, whose removal would damage the Licensed Premises.
Excluded Downtime has the meaning set forth in Section 2 below.
Indirect cost means any cost not directly identified with a single final cost objective, but identified with two or more final cost objectives or with at least one intermediate cost objective.