Equipment Status definition

Equipment Status means the equipment and pilot status which a pilot holds in his monthly assignment, e.g. First
Equipment Status means the equipment and pilot status which a pilot holds in his -monthly assignment, e.g. First Officer, etc. "Adversely Affected Pilot" is one who is to be reduced in bid status. "Month" for the purpose of pay and flight time limitation shall be as laid down in (2.14.01) to (2.14.12) following: January shall be the period January to January inclusive (30 days). February shall be the period January to March inclusive (30 days; in a leap year, days). March shall be the period March to April inclusive (31 days). April shall be the period April to May inclusive (31 days). May shall be the period May to June inclusive (30 days). June shall be the period June to July inclusive (30 days). July shall be the period July to July inclusive (30 days). August shall be the period August to August inclusive (30 days). September shall be the period August to September inclusive (30 days). October shall be the period September to October inclusive (31 days). November shall be the period October to November inclusive (31 days). December shall be the period December to December inclusive (31 days).
Equipment Status means the type of equipment to which a Captain or First is assigned.

Examples of Equipment Status in a sentence

  • Equipment Status: Radios (proper frequencies (de)selected), Visibility Range and Center, ATIS, RADAR(s), etc.

  • Real time Data Logging with Integrated Analytics & Reporting: Logging of all parameters - AC, DC, Weather, System Run Hours, Equipment Status and Alarms as well as derived/ calculated/ integrated values.

  • The Contractor shall submit a monthly Test Status Report and a Vehicle or Equipment Status Report to the COR (both reports shown in this section).

  • Process Cooling Equipment Status as Walk-in Equipment Many commenters argued in response to the August 2016 TP NOPR that process cooling equipment does not fall under the walk-in definition.

  • A reduction in the logistic costs together with an increasing in the standard service provides benefits to the customers and efficiency to the system.Padilha and Ng (2012) investigate about the evolution of dry ports in Brazil and discover how institution and infrastructure represent an obstacle in developing countries with respect to developed economies.Walker, Di Sisto, and McBain (2008) studied the factors that drive green supply chain management initiatives.

  • Appoint an IMDS/ Equipment Status Reporting POC if the workcenter has Equipment Inventory List reportable equipment.

  • The Equipment Status Reporting POC can be the workcenter supervisor or any individual within the section.

  • The workcenter IMDS/ Equipment Status Reporting POC will: Report inventory only for Communications Security (COMSEC) Operations equipment (Standard Reporting Designator (SRD) category U and IMDS report level P must be accounted for within IMDS).

  • The Vehicle or Equipment Status Report shall be submitted until all vehicles or items of equipment are disposed of.

  • Each claim submittal must include the following:- Reimbursement Request Submittal Checklist.- Invoice Itemization sheets.- Equipment Status Form (if required).- Price Quote List (utilized for bid submittal) if necessary, including copies of associated written and signed bids.


More Definitions of Equipment Status

Equipment Status. The following are used to represent equipment status: 1. E = Existing. 2. M = Modify. 3. F = Future. 4. D = Demolish or remove, do not replace. 5. N = New. 6. R = Remove, Replace with new. May 2017 C01025C17 Georgetown Wet Weather Treatment Station 11009 - 2 EQUIPMENT LIST

Related to Equipment Status

  • Original equipment manufacturer means a company that manufactures products that it has designed from purchased components and sells those products under the company's brand name.

  • INTER-CONNECTION POINT/ DELIVERY/ METERING POINT means a single point at 220kV or above, where the power from the Project(s) is injected into the identified ISTS Substation (including the dedicated transmission line connecting the Projects with the substation system) as specified in the RfS document. Metering shall be done at this interconnection point where the power is injected into. For interconnection with grid and metering, the WPDs shall abide by the relevant CERC/ SERC Regulations, Grid Code and Central Electricity Authority (Installation and Operation of Meters) Regulations, 2006 as amended and revised from time to time.

  • Equipment Room means a space intended for the operation of pool pumps, filters, heaters and controllers.