Excessive Total Outages Energy definition

Excessive Total Outages Energy has the meaning set forth in Article 9.3.

Examples of Excessive Total Outages Energy in a sentence

  • Excessive Total Outages Project Company covenants that, in respect of each Contract Year, the Excessive Total Outages Energy ("ETOE") for such Contract Year shall be less than or equal to zero (0).

  • Excessive Total OutagesProject Company covenants that, in respect of each Contract Year, the Excessive Total Outages Energy (" ETOE") for such Contract Year shall be less than or equal to zero (0).

Related to Excessive Total Outages Energy

  • Ultra Low Sulfur Diesel Fuel means diesel fuel that has a sulfur content of no more than fifteen parts per

  • Carbon dioxide equivalent or “CO2 equivalent” or “CO2e” means the number of metric tons of CO2 emissions with the same global warming potential as one metric ton of another greenhouse gas. Global warming potential values shall be determined consistent with the definition of Carbon Dioxide Equivalent in MRR section 95102(a).

  • Lower explosive limit (LEL) means the concentration of a compound in air below which a flame will not propagate if the mixture is ignited.

  • Exceedance means a condition that is detected by monitoring that provides data in terms of an emission limitation or standard and that indicates that emissions (or opacity) are greater than the applicable emission limitation or standard (or less than the applicable standard in the case of a percent reduction requirement) consistent with any averaging period specified for averaging the results of the monitoring.

  • Generator Forced Outage means an immediate reduction in output or capacity or removal from service, in whole or in part, of a generating unit by reason of an Emergency or threatened Emergency, unanticipated failure, or other cause beyond the control of the owner or operator of the facility, as specified in the relevant portions of the PJM Manuals. A reduction in output or removal from service of a generating unit in response to changes in market conditions shall not constitute a Generator Forced Outage.

  • Peak tube potential means the maximum value of the potential difference across the x-ray tube during an exposure.

  • low voltage means the set of nominal voltage levels that are used for the distribution of electricity and whose upper limit is generally accepted to be an a.c. voltage of 1000V ( or a d.c. voltage of 1500 V). [SANS 1019]

  • Cubic foot of gas means the amount of gas required to fill a cubic foot of space when the gas is at an absolute pressure of fourteen and seventy-three hundredths (14.73) pounds per square inch at a temperature of sixty (60) degrees Fahrenheit.

  • Low-level radioactive waste or “waste” means radioactive material that consists of or contains class A, B, or C radioactive waste as defined by 10 C.F.R. 61.55, as in effect on January 26, 1983, but does not include waste or material that is any of the following:

  • Potential electrical output capacity means, with regard to a unit, 33 per- cent of the maximum design heat input of the unit.

  • Hydraulic lift tank means a tank holding hydraulic fluid for a closed-loop mechanical system that uses compressed air or hydraulic fluid to operate lifts, elevators, and other similar devices.

  • Combined sewer overflow means the discharge of untreated or

  • Generator Planned Outage means the scheduled removal from service, in whole or in part, of a generating unit for inspection, maintenance or repair with the approval of the Office of the Interconnection in accordance with the PJM Manuals.

  • Cubic Metre means the volume of gas which occupies one cubic metre when such gas is at a temperature of 15 degrees Celsius, and at a pressure of 101.325 kilopascals absolute;

  • Day-ahead System Energy Price means the System Energy Price resulting from the Day- ahead Energy Market.

  • Plasma arc incinerator means any enclosed device using a high intensity electrical discharge or arc as a source of heat followed by an afterburner using controlled flame combustion and which is not listed as an industrial furnace.

  • high voltage means the classification of an electric component or circuit, if its working voltage is > 60 V and ≤ 1500 V DC or > 30 V and ≤ 1000 V AC root mean square (rms).

  • Forced Outage means any unplanned reduction or suspension of the electrical output from the Facility resulting in the unavailability of the Facility, in whole or in part, in response to a mechanical, electrical, or hydraulic control system trip or operator-initiated trip in response to an alarm or equipment malfunction and any other unavailability of the Facility for operation, in whole or in part, for maintenance or repair that is not a scheduled maintenance outage and not the result of Force Majeure.

  • Loop Concentrator/Multiplexer or "LCM" is the Network Element that does one or more of the following: aggregates lower bit rate or bandwidth signals to higher bit rate or bandwidth signals (multiplexing); disaggregates higher bit rate or bandwidth signals to lower bit rate or bandwidth signals (demultiplexing); aggregates a specified number of signals or channels to fewer channels (concentrating); performs signal conversion, including encoding of signals (e.g., analog to digital and digital to analog signal conversion); or in some instances performs electrical to optical (E/O) conversion. LCM includes DLC, and D4 channel banks and may be located in Remote Terminals or Central Offices.

  • Seasonal high water table means the highest zone of soil or rock that is seasonally or permanently saturated by a perched or shallow water table. A planar surface, below which all pores in rock or soil (whether primary or secondary) that is seasonally or permanently saturated.

  • Maximum contaminant level (MCL) means the maximum permissible level of a contaminant in water which is delivered to any user of a public water system.

  • Natural Outlet means any outlet into a watercourse, pond, ditch, lake, or other body of surface or groundwater.

  • Reid vapor pressure means the vapor pressure of crude oil or other volatile petroleum products at 100 degrees Fahrenheit as determined by the latest edition of ASTM D6377 (RVPE): Standard Test Method for Determination of Vapor Pressure of Crude Oil.

  • Total tetrahydrocannabinol means the sum of the percentage by weight of tetrahydrocannabinolic acid multiplied by eight hundred seventy-seven thousandths plus the percentage of weight of tetrahydrocannabinol.

  • Unplanned Outage refers to the unavailable status of the units of the Power Plant other than Planned Outage. Based on the urgency of the needs of outage, the Unplanned Outage can be classified into five categories: (1) immediate outage; (2) the outage which could be delayed for a short while but the units must exit within six hours; (3) the outage which could be postponed over six hours but the units must exit within seventy-two hours; (4) the outage which could be deferred over seventy-two hours but the units must exit before the next Planned Outage; and (5) the prolonged outage which is beyond the period of the Planned Outage.

  • Bandwidth means a distributor’s defined tolerance used to flag data for further scrutiny at the stage in the VEE process where a current reading is compared to a reading from an equivalent historical billing period. For example, a 30 percent bandwidth means a current reading that is either 30 percent lower or 30 percent higher than the measurement from an equivalent historical billing period will be identified by the VEE process as requiring further scrutiny and verification;