Existing Excavation definition

Existing Excavation means any excavation which lawfully existed as of August 24, 1979, from which earth material of sufficient weight or volume to be commercially useful has been removed during the 2-year period before August 24, 1979.
Existing Excavation means any excavation, as described in RSA 155-E: 2, I, which lawfully existed as of August 24, 1979, from which earth material of sufficient weight or volume to be commercially useful had been removed during the 2-year period before August 24, 1979 and had submitted the report as required by RSA 155-E:2, I, (d).
Existing Excavation means any excavation which lawfully exists in accordance with the provisions of RSA 155-E:2(I).

Examples of Existing Excavation in a sentence

  • The regulator of the Town of Newton has determined that none of the excavation sites within the municipality has met the burden of proof that they are exempt from a permit under RSA 155-E:2, I (Existing Excavation) and RSA 155-E:2, III (Stationary Manufacturing Plants).

  • The "Existing Excavation Exemption Application" shall be considered by the Regulator at a duly called and fully noticed public hearing, such notice being consistent with RSA 155-E:7, as the same may be amended, from time to time.

  • Existing Excavation Operations: The Perry City Council shall determine by resolution such filing fee as is reasonably required for city review of the application to renew, amend or expand a Conditional Use Excavation Permit and evaluation of appropriate rehabilitation requirements, related surety requirements and other issues involved in the application and approval process (see fFee sSchedule).

  • The regulator of the Town of CANDIA has determined that none of the excavation sites within the Municipality have met the burden of proof that they are exempt from a permit under RSA 155-E:2, I (Existing Excavation) and RSA 155-E:2, III (Stationary Manufacturing Plants).

  • Figure 7: Pre-stripped Northern Section of Existing Excavation - Looking Northeast Since the overburden is only a maximum of 700mm thick, there will be no issues with respect to the stability of any cut slopes formed in this material.

  • It was necessary to replace the interference filter with spectrally narrower and with better blocking.

  • Existing Excavation: An excavation which lawfully existed as of August 24, 1979, from which earth material of sufficient weight or volume to be commercially useful has been removed during the two year period before August 24, 1979.

  • Existing Excavation: any excavation, as described in RSA 155-E:2, I, which lawfully existed as of August 24, 1979, from which earth material of sufficient weight or volume to be commercially useful has been removed during the 2-year period before August 24, 1979 and had submitted the report as required by RSA 155-E:2, I, (d).

  • An owner who considers their excavation exempt from the permit requirement due to the "existing excavation" exemption shall, nevertheless file an "Existing Excavation Exemption Application" with the Regulator before commencing such operation, and shall present such evidence as the Regulator reasonably requires to determine that the proposed project is entitled to the claimed exemption.


More Definitions of Existing Excavation

Existing Excavation means any excavation which lawfully existed as of August 24, 1979, from which earth material of sufficient weight or volume to be commercially useful has been removed during the 2-year period before August 24, 1979. All pit owners must comply with RSA 155-E: 2,I, (d), otherwise pit is determined to have been abandoned.

Related to Existing Excavation

  • Excavation means the mechanical removal of earth material.

  • Excavation zone means the volume containing the tank system and backfill material bounded by the ground surface, walls, and floor of the pit and trenches into which the UST system is placed at the time of installation.

  • Excavate or "excavation" means ditching, dredging, or mechanized removal of earth, soil or rock.

  • Excavation work means the making of any man-made cavity, trench, pit or depression formed by cutting, digging or scooping;

  • Built-Up Area and/or “Covered Area” in relation to a Flat shall mean the floor area of that Flat including the area of balconies and terraces, if any attached thereto, and also the thickness of the walls (external or internal) and the columns and pillars therein Provided That if any wall, column or pillar be common between two Flats, then one-half of the area under such wall column or pillar shall be included in the built-up area of each such Flat.

  • Constructed wetlands means areas intentionally designed and created to emulate the water quality improvement function of wetlands for the primary purpose of removing pollutants from stormwater.

  • Water surface elevation means the height, in relation to the National Geodetic Vertical Datum (NGVD) of 1929, the North American Vertical Datum (NAVD) of 1988, or other datum, where specified, of floods of various magnitudes and frequencies in the floodplains of riverine areas.

  • Base Building shall include the structural portions of the Building, the public restrooms and the Building mechanical, electrical and plumbing systems and equipment located in the internal core of the Building on the floor or floors on which the Premises are located. Tenant shall promptly provide Landlord with copies of any notices it receives regarding an alleged violation of Law. Tenant shall comply with the rules and regulations of the Building attached as Exhibit E and such other reasonable rules and regulations adopted by Landlord from time to time, including rules and regulations for the performance of Alterations (defined in Section 9).

  • Elevated Building means a non-basement building which has its lowest elevated floor raised above ground level by foundation walls, shear walls, posts, piers, pilings, or columns.

  • Demolition means the wrecking or taking out of any load-supporting structural member of a facility together with any related handling operations or the intentional burning of any facility.

  • Underground area means an underground room, such as a basement, cellar, shaft or vault, providing enough space for physical inspection of the exterior of the tank situated on or above the surface of the floor.

  • Building Project means the aggregate combined parcel of land on a portion of which are the improvements of which the Premises form a part, with all the improvements thereon, said improvements being a part of the block and lot for tax purposes which are applicable to the aforesaid land.

  • Underground facility means any item which shall be buried or placed below ground for use in connection with the storage or conveyance of water, sewage, electronic, telephone or telegraphic communications, electric energy, oil, gas or other substances, and shall include, but not be limited to pipes, sewers, conduits, cables, valves, lines, wires, manholes, attachments and those portions of poles and their attachments below ground.

  • Building Area means the greatest horizontal area of a building within the outside surface of the exterior walls.

  • mining areas means the areas delineated and coloured red on the Plan marked “A” initialled by or on behalf of the parties hereto for the purposes of identification;

  • Existing Project is a Project that has achieved Commercial Operation on or prior to the Execution Date.

  • Drainage area means a geographic area within which stormwater, sediments, or dissolved materials drain to a particular receiving waterbody or to a particular point along a receiving waterbody.

  • Existing Building means a building that (a) was in existence and completely constructed on the date that the Applicant first submitted its Application, or (b) in respect of which the IESO has, in its sole and absolute discretion, issued a written confirmation that the building will be deemed an Existing Building for the purposes of the definition of Rooftop Facility.

  • Renovation means altering a facility or one or more facility components in any way, including the stripping or removal of RACM from a facility component. Operations in which load-supporting structural members are wrecked or taken out are demolitions.

  • Water Surface Elevation (WSE means the height, in relation to mean sea level, of floods of various magnitudes and frequencies in the floodplains of coastal or riverine areas.

  • Excavator means any person performing excavation or blasting.

  • mixed-use building means a building or structure containing a residential and non- residential use other than a home occupation;

  • Parking Garage means a building or portion of a building, other than a private garage, that is used for the temporary parking of motor vehicles;

  • drainage work means any construction or reconstruction of or any alteration or addition to, or any work done in connection with a drainage installation but shall not include any work undertaken solely for purposes of repair or maintenance;

  • Common Area means all areas and facilities within the Project that are not designated by Landlord for the exclusive use of Tenant or any other lessee or other occupant of the Project, including the parking areas, access and perimeter roads, pedestrian sidewalks, landscaped areas, trash enclosures, recreation areas and the like.

  • Existing structure means any structure that is installed or approved for installation at the time a wireless services provider or wireless infrastructure provider provides notice to a locality or the Department of an agreement with the owner of the structure to co-locate equipment on that structure. "Existing structure" includes any structure that is currently supporting, designed to support, or capable of supporting the attachment of wireless facilities, including towers, buildings, utility poles, light poles, flag poles, signs, and water towers.