Finished water sampling point definition

Finished water sampling point means each entry point to the distribution system which is representative of the water intended for distribution and consumption without further treatment, except as necessary to maintain water quality in the distribution system (e.g. booster disinfection, addition of corrosion control chemicals).
Finished water sampling point means each entry point to the distribution system which is representative of the water intended for distribution and consumption
Finished water sampling point means each entry point to the distribution system which is representative of the water intended for distribution and consumption without further treatment, except as necessary to maintain water quality in the distribution system (for example, booster chlorination).

Related to Finished water sampling point

  • Finished water means the water that is introduced into the distribution system of a public water system and is intended for distribution and consumption without further treatment, except as treatment necessary to maintain water quality in the distribution system (e.g., booster disinfection, addition of corrosion control chemicals).

  • Bottled water means water that is placed in a safety sealed container or package for human 696 consumption. Bottled water is calorie free and does not contain sweeteners or other additives except 697 that it may contain: (i) antimicrobial agents; (ii) fluoride; (iii) carbonation; (iv) vitamins, minerals, and 698 electrolytes; (v) oxygen; (vi) preservatives; and (vii) only those flavors, extracts, or essences derived 699 from a spice or fruit. "Bottled water" includes water that is delivered to the buyer in a reusable 700 container that is not sold with the water.

  • INTER-CONNECTION POINT/ DELIVERY/ METERING POINT means a single point at 220kV or above, where the power from the Project(s) is injected into the identified ISTS Substation (including the dedicated transmission line connecting the Projects with the substation system) as specified in the RfS document. Metering shall be done at this interconnection point where the power is injected into. For interconnection with grid and metering, the WPDs shall abide by the relevant CERC/ SERC Regulations, Grid Code and Central Electricity Authority (Installation and Operation of Meters) Regulations, 2006 as amended and revised from time to time.

  • Grab sample means an individual sample collected in less than 15 minutes in conjunction with an instantaneous flow measurement.

  • Biomass means the biodegradable fraction of products, waste and residues from biological origin from agriculture (including vegetal and animal substances), forestry and related industries including fisheries and aquaculture, as well as the biodegradable fraction of industrial and municipal waste;

  • Yearly (1/Year) sampling frequency means the sampling shall be done in the month of September, unless specifically identified otherwise in the effluent limitations and monitoring requirements table.

  • Sewage sludge weight means the weight of sewage sludge, in dry U.S. tons, including admixtures such as liming materials or bulking agents. Monitoring frequencies for sewage sludge parameters are based on the reported sludge weight generated in a calendar year (use the most recent calendar year data when the NPDES permit is up for renewal).

  • generating plant means the generating facility described in Schedule 1 as amended from time to time;