Full Interconnection Study definition

Full Interconnection Study means the set of studies conducted by the TSP under the Full Interconnection Study Agreement consisting of the Steady-State and Transfer Analysis; System Protection (Short-Circuit) Analysis; Dynamic and Transient Stability Analysis; Facilities Study; and if applicable, Sub-Synchronous Oscillation (“SSO”) Study.
Full Interconnection Study means the study required by ERCOT as part of the resource integration process.

Examples of Full Interconnection Study in a sentence

  • ERCOT will utilize the latest data provided by the IEs/REs in the Security Screening Study, or Full Interconnection Study if started, to model the Resource using the simple model.

  • The CPUC 3667 Full Interconnection Study Rules provide the basic structure and steps that are appropriate to use as a starting point for over 10 MW installations.

  • Level 3 (Full Interconnection Study) - For Generating Facilities that have a power rating of 10 megawatts (MW) or less and do not qualify for the Simplified or Fast Track processes.

  • Notwithstanding the other provisions of this Section, the Full Interconnection Study Agreement, if any, is unaffected by this Agreement.

  • The fees required for interconnection include a Security Screening Study fee of $1,000 to $5,000 and a Full Interconnection Study fee of $15/MW and a$15,000 or $30,000 deposit (ERCOT 2004).

  • As soon as practicable following completion of the Full Interconnection Study, Oncor will negotiate an Interconnection Agreement with the resource entity.

  • Pursuant to the terms and conditions of this Agreement, Transmission Service Provider shall interconnect Generator’s Plant with Transmission Service Provider’s System consistent with the results of the Full Interconnection Study that was prepared in response to generation interconnection request #16INR0052 to ERCOT from OCI Alamo 7 LLC.

  • Pursuant to the terms and conditions of this Agreement, Transmission Service Provider shall interconnect Generator’s Plant with Transmission Service Provider’s System consistent with the results of the Full Interconnection Study that was prepared in response to generation interconnection request #11INR0062 to ERCOT from Wind Tex Energy, LP.

  • Under ERCOT’s proposal in Section 1.3, the generation interconnection request would become public domain information at the Full Interconnection Study stage.

  • CenterPoint Energy believes it is likely that no proposal would satisfy all parties, and that ERCOT’s proposal to make generation interconnection information public at the Full Interconnection Study stage is a reasonable compromise.

Related to Full Interconnection Study

  • Interconnection Study means any of the studies defined in the CAISO Tariff or, if applicable, any distribution provider’s tariff that reflect the methodology and costs to interconnect the Project to the Participating Transmission Owner’s electric grid.

  • Interconnection Studies means the Interconnection Feasibility Study, the System Impact Study, and the Facilities Study described in Tariff, Part IV and Tariff, Part VI.

  • Optional Interconnection Study means a sensitivity analysis of an Interconnection Request based on assumptions specified by the Interconnection Customer in the Optional Interconnection Study Agreement.

  • Optional Interconnection Study Agreement means the form of agreement for preparation of an Optional Interconnection Study, as set forth in Tariff, Attachment N-3.

  • Interconnection Feasibility Study means either a Generation Interconnection Feasibility Study or Transmission Interconnection Feasibility Study.

  • Generation Interconnection Feasibility Study means a study conducted by the Transmission Provider (in coordination with the affected Transmission Owner(s)) in accordance with Tariff, Part IV, section 36.

  • Local Interconnection Trunks/Trunk Groups means the trunks that are used for the termination of Local Exchange Traffic, pursuant to iconectiv Technical Reference GR 317-CORE.

  • Local Interconnection Trunks/Trunk Groups means the trunks that are used for the termination of Local Exchange Traffic, pursuant to iconectiv Technical Reference GR 317-CORE.

  • Firm Transmission Feasibility Study means a study conducted by the Transmission Provider in accordance with Tariff, Part II, section 19.3 and Tariff, Part III, section 32.3.

  • Interconnection is As Defined in the Act.

  • Electrical Interconnection Facilities means the equipment and facilities required to safely and reliably interconnect a Facility to the transmission system of the Transmitting Utility, including the collection system between each Bloom System, transformers and all switching, metering, communications, control and safety equipment, including the facilities described in any applicable Interconnection Agreement.

  • Development Site means any parcel or lot on which exists or which is intended for building development other than the following:

  • Interconnection Point means the point(s) of connection(s) at which the project is connected to the grid i.e. it shall be at 11 / 22 kV bus bar level of substation of MSEDCL.

  • Generation Interconnection Facilities Study means a Facilities Study related to a Generation Interconnection Request.

  • Transmission Owner Interconnection Facilities means all Interconnection Facilities that are not Customer Interconnection Facilities and that, after the transfer under Tariff, Attachment P, Appendix 2, section 5.5 to the Interconnected Transmission Owner of title to any Transmission Owner Interconnection Facilities that the Interconnection Customer constructed, are owned, controlled, operated and maintained by the Interconnected Transmission Owner on the Interconnected Transmission Owner’s side of the Point of Interconnection identified in appendices to the Interconnection Service Agreement and to the Interconnection Construction Service Agreement, including any modifications, additions or upgrades made to such facilities and equipment, that are necessary to physically and electrically interconnect the Customer Facility with the Transmission System or interconnected distribution facilities. The “Transmission Provider” shall be the Office of the Interconnection for all purposes, provided that the Transmission Owners will have the responsibility for the following specified activities:

  • Signaling Transfer Point (“STP”) means a signaling point that performs message routing functions and provides information for the routing of messages between signaling points within or between CCIS networks. A STP transmits, receives and processes CCIS messages.

  • Interconnector means a transmission line which crosses or spans a border between Member States for the purpose of connecting the national transmission system of those Member States or a transmission line between a Member State and a third country up to the territory of the Member States or the territorial sea of that Member State;

  • Interconnection Provider means PacifiCorp Transmission.

  • Interconnect means to connect an alarm system including an automatic dialing device to a telephone line, either directly or through a mechanical device that utilizes a telephone, for the purpose of using the telephone line to transmit a message upon the activation of the alarm system.

  • Interconnection Customer means a Generation Interconnection Customer and/or a Transmission Interconnection Customer.

  • Interconnected Transmission Owner means the Transmission Owner to whose transmission facilities or distribution facilities Customer Interconnection Facilities are, or as the case may be, a Customer Facility is, being directly connected. When used in an Interconnection Construction Service Agreement, the term may refer to a Transmission Owner whose facilities must be upgraded pursuant to the Facilities Study, but whose facilities are not directly interconnected with those of the Interconnection Customer.

  • Interconnection Service means the physical and electrical interconnection of the Customer Facility with the Transmission System pursuant to the terms of Tariff, Part IV and Tariff, Part VI and the Interconnection Service Agreement entered into pursuant thereto by Interconnection Customer, the Interconnected Transmission Owner and Transmission Provider.

  • Provisional Interconnection Service means interconnection service provided by Transmission Provider associated with interconnecting the Interconnection Customer’s Generating Facility to Transmission Provider’s Transmission System and enabling that Transmission System to receive electric energy and capacity from the Generating Facility at the Point of Interconnection, pursuant to the terms of the Interconnection Service Agreement and, if applicable, the Tariff.

  • Generation Interconnection Customer means an entity that submits an Interconnection Request to interconnect a new generation facility or to increase the capacity of an existing generation facility interconnected with the Transmission System in the PJM Region.

  • Reference Interconnection Offer or “RIO” means a document published by a service provider specifying terms and conditions on which the other service provider may seek interconnection with such service provider;

  • Interconnection Party means a Transmission Provider, Interconnection Customer, or the Interconnected Transmission Owner. Interconnection Parties shall mean all of them.