For Small Generator Facilities with a Nameplate Capacity of 1 MW or above, the Interconnection Customer shall carry adequate insurance coverage that shall be acceptable to the EDC; provided, that the maximum comprehensive/general liability coverage that shall be continuously maintained by the Interconnection Customer during the term shall be not less than $2,000,000 for each occurrence, and an aggregate, if any, of at least $4,000,000.
Maryland Standard Small Generator Interconnection Rules – The most current version of the procedures for interconnecting Small Generator Facilities adopted by the Maryland Public Service Commission (PROVIDE COMAR REFERENCE) Parallel Operation or Parallel - The state of operation which occurs when a Small Generator Facility is connected electrically to the Electric Distribution System and the potential exists for electricity to flow from the Small Generator Facility to the Electric Distribution System.
Ancillary Services necessary to deliver the energy produced by the Generator Facilities over the Transmission System, if any, will be provided to Interconnection Customer or any entity purchasing or otherwise acquiring energy generated by the Generator Facilities pursuant to the provisions of the Transmission Provider’s Open Access Transmission Tariff or any successor tariff.
In the event of the need for an emergency outage of the Generator Facilities, the Interconnection Customer will provide the Transmission Owner notice of the need for electrical clearance as soon as the Interconnection Customer is aware of the need for the outage.
Attachment 4 Operating Requirements for Small Generator Facilities Operating in Parallel Applicable sections of EDC’s operating manuals applying to the small generator interconnection shall be listed and Internet links shall be provided.
The study performed by GTC that analyzes the impact on the ITS and the GTC System of interconnecting the Generator Facilities with the Transmission Provider System and identifies required mitigation for such impacts.
In addition, notwithstanding the foregoing, (i) GTC may assign this Agreement without prior written consent of Generator to any wholly owned direct or indirect subsidiary of GTC or to any successor affiliate corporation thereof, provided that such assignee owns the portion of the GTC System to which the GTC Work relates and (ii) Generator may assign this Agreement without prior written consent of GTC to any wholly owned direct or indirect subsidiary of Generator that will own the Generator Facilities.
Interconnection Customer shall tie the ground grid for its transmission line from the Interconnection Customer’s Generator Facilities to the Point of Interconnection to the ground grid of the Transmission Owner’s Stand Alone Network Upgrades at a point provided by the Transmission Owner at the Point of Interconnection.
Cooperative shall have access at reasonable times to the Generator whether before, during or after the time the Generator Facilities first produce energy, to perform reasonable on-site inspections to verify that the installation and operation of the Generator complies with the requirements of this Agreement and to verify the proper installation and continuing safe operation of the Generator.