Geotechnical Survey definition

Geotechnical Survey means that certain geotechnical reports referenced in Exhibit F. “Government Authority” means any and all foreign, national, federal, state, county, city, municipal, local or regional authorities, departments, bodies, commissions, corporations, branches, directorates, agencies, ministries, courts, tribunals, judicial authorities, legislative bodies, administrative bodies, regulatory bodies, autonomous or quasi-autonomous entities or taxing authorities or any department, municipality or other political subdivision thereof.
Geotechnical Survey means that certain geotechnical reports referenced in Exhibit F.
Geotechnical Survey means the geotechnical survey of the Site, presented by Employer to Tenderer as part of the Tender Documents, and which is attached to these Main Terms as Ap- pendix 9 ("Geotechnical Survey").

Examples of Geotechnical Survey in a sentence

  • Also, a device designed to enable fish to effectively pass around or through an obstruction.• Float: An anchored offshore platform used for water-related recreation.• Geotechnical Survey: A professional assessment of the land and soils in an area.

  • Items not included but required for proper operation of works shall be included in the unit and lump sum prices, to be quoted by the bidder All necessary Confirmatory Topographical, Geotechnical Survey & Investigation Works.

  • The Century Concord Wuhe Yinmahu Wind Power project it undertook won the first prize of the Beijing City Outstanding Engineering Geotechnical Survey & Design Award, which further enhanced the company’s competitiveness in the external market.

  • The following documents have to be submitted by the applicant to DIN CERTCO: ─ The application for certification completely filled in and with a legally binding signature.─ Signed FSC licence agreement which is not suspended The applicant shall receive from DIN CERTCO, following receipt of the application, a confirmation of order with a process number and notes regarding the further course of the procedure and, as applicable, queries concerning any missing documents.

  • B.00 Project and Program Considerations B.04 Includes Geotechnical Survey and Report.

  • Coordination with Geotechnical, Survey, and Traffic consultants for the project will be performed during the Preliminary Engineering and Design Phase.

  • FCS_COP.1.1/ Asymmetric Role Authentication The TSF shall perform [Asymmetric Role Authentication] in accordance with a specified cryptographic algorithm [RSA with ISO9796-2 padding with partial recovery and with SHA-1 or SHA-256] and cryptographic key sizes [1024 bits, 1536 bits or 2048 bits] that meet the following: [IASECC].

  • Students commonly give explanations in terms of “imparting force”, “dying out”, and “balancing” (DiSessa, 1993).

  • Depth: to refusal.Location: Indicative locations are shown on drawing titled Emerald Submission Map - Geotechnical Survey Layout_Final.

  • The researches that support PMI are also available:● Technical Report of the Geophysical, Bathymetric and Geotechnical Survey (Jet- Probe) carried out in the North Bay of Santa Catarina Island - Marina Beira-Mar, prepared by the Commercial and Industrial Association of Florianópolis - ACIF;● Nautical Ordering Plan - PON, carried out by the organization FloripAmanhã, which bases the choice of the place presented, as well as, presents a diagnosis on the nautical theme.


More Definitions of Geotechnical Survey

Geotechnical Survey means the drilling of bore-holes to source scientific information and other data relating to soil and sub-soil conditions including assessment of its load bearing capacity with an objective to set up the offshore wind projects;

Related to Geotechnical Survey

  • Survey shall have the meaning set forth in Section 4.1.

  • Survey Area means the area of land or waters the subject of a Survey, or proposed to be the subject of a Survey.

  • Environmental Impact Assessment means a systematic examination conducted to determine whether or not a programme, activity or project will have any adverse impacts on the environment;

  • Quantity Surveyor means a duly qualified quantity surveyor of at least five (5) year’s experience in the assessment of building material and construction costs. Quantity Surveyor Assessment means an assessment by an independent Quantity Surveyor of the Construction Cost to the reasonable satisfaction of the Council. Regulation means the Environmental Planning and Assessment Regulation, 2000 (as amended).

  • Site Engineer means an Engineer appointed by the SBIIMS at site as their representative for day-to-day supervision of work and to give instructions to the contractors.