Examples of Group B public water system in a sentence
Based on public water system definitions and classifications (see Section 2.0), the following flow chart will help you decide whether your proposed Group B public water system is subject to the Group B design approval process.
If not, I will proceed with the design and/or approval of a Group B public water system.
If not, I will proceed with the design and approval of a Group B public water system.
AutoFeatures does not take raw data, such as binary files or network captures, as input, but relational data.
A Group B public water system without a current operating permit.
Six (6) months after the effective date of these regulations, no Group B public water system shall operate without an operating permit issued by the Health Officer.
Sanitary survey: A review, inspection, and assessment of a Group B public water system, which should occur at least once every five (5) to ten (10) years, to determine the adequacy of the system and its operation for producing and distributing safe and reliable drinking water.
A transfer of a Group B public water system permit will be required at the time a public water system is transferred from one public water system owner to another, or whenever the name of the public water system is changed.
PSN–13 Defense Advanced GPS Receiver (DAGR): Global Positioning System (GPS) capability is currently provided to Abrams tanks using the DAGR.
One thousand or more people for two or more con- secutive days within a calendar year.(((20))) (21) "Group B public water system" means a public water system that is not a Group A public water sys- tem.