Import Meter definition

Import Meter means Bill Meter installed at interconnection point for Measurement of Active Energy, Maximum demand and Power factor for Energy imported from the Generating Company’s Biomass Gasifier Power plant through
Import Meter means Bill Meter installed at the grid substation of ABCL/STU (delete whichever not applicable) for Measurement of Active Energy, Maximum demand and Power factor of Energy Imported to ABCL from the Generating Plant.
Import Meter means that meter which measures the imported energy by the Company from the BPDB’s grid.

Examples of Import Meter in a sentence

  • Total electricity generation in KWH during the day Export Meter Import Meter At 00 hrs.

  • Interconnected part of the local Distribution System Import Meter ‘A’ Export Meter ‘A’Import Meter ‘B’ Export Meter ‘B’ Customer ‘s NetworkEmbedded GenerationExport Meter ‘C’Isolated part of the local Distribution System only capable of being supplied through Export Meter ‘C’ Import to the Customer’s network = Import Meter ‘A’ + Import Meter ‘B’ – Export Meter ‘C’ There is Embedded Generation.

  • It is assumed that the network supplied through Export Meter ‘C’ is connected to the local Distribution System through Import Meter ‘A’ so that customers connected to the isolated part of the local Distribution System preserve system time, i.e. both parts of the Distribution System are in synchronisation (Export generation protection shall prevent ‘island generating’).

  • The legal and regulatory framework should include effective judicial or extra- judicial dispute resolution mechanisms.

  • Import Meter ‘A’ Import Meter ‘B’ BPt BPt Customer ‘s networkBPtExport Meter ‘C’ BPtIsolated part of the local distribution network capable of being supplied through Export Meter ‘C’ BPt = Boundary Point Import to the Customer’s network = Import Meter ‘A’ + Import Meter ‘B’ – Export Meter ‘C’ This is acceptable in SMRS since there is no on-site generation and an Export type Meter, Export Meter ‘C’, is measuring feed-through energy as opposed to embedded generation Export.


More Definitions of Import Meter

Import Meter means Bill Meter installed at interconnection point for Measurement of Active Energy, Maximum demand and Power factor for Energy imported from the Solar Photovoltaic Power Plant’s to UPCL 33/11 KV Grid connecting Sub- Station, , Uttarakhand.
Import Meter means that meter which measures the imported energy by the Company from the PGCB’s grid.
Import Meter means the meter (or where relevant meters) installed at the Site which measure and record the amount of electricity supplied to the Premises by the Generator’s energy supplier;
Import Meter means BillMeter installed at interconnection point for Measurement of Active Energy, Maximum demand and Power factor for Energy imported from the Solar Photovoltaic Power Plant’s to UPCL 33/11 kV , Uttarakhand.
Import Meter means Main Meter installed at the interconnection point for measurement of Active Energy, Maximum demand and Power Factor for energy imported by the Generating Station from UPCL.”
Import Meter means the meter ascribed to measure energy provided by the Offtaker to the [IPP Project Company]; Initial Operation Test bears the meaning ascribed thereto in Schedule 4; Interconnection Facilities- The facilities that interconnect the Project to the Grid System. This includes all of the equipment that measures capacity and energy output from the Project, as well as the associated safety, operational and technical specifications of the connecting grid system.
Import Meter means Bill Meter installed at interconnection point for Measurement of Active Energy, Maximum demand and Power factor for Energy imported from the Pine Leave & other Biomass Based Power Plant’s to nearest feasible LT/HT line connected to UPCL 33/11 kV..., Uttarakhand”