Integrated head restraint definition

Integrated head restraint means a head restraint formed by the upper part of the seat‑back. Head restraints meeting the definitions of paragraphs 2.12.2. or 2.12.3. below but which can only be detached from the seat or the vehicle structure by the use of tools or by partial or complete removal of the seat covering, meet the present definition;
Integrated head restraint means a head restraint formed by the upper part of the seat-back. Head restraints meeting the definitions of paragraphs 2.12.2. or 2.12.3. below but which can only be detached from the seat or the vehicle structure by the use of tools or by partial or complete removal of the seat covering, meet the present definition;
Integrated head restraint means a head restraint which can only be detached from the seat or the vehicle structure by the use of tools or by partial or complete removal of the seat covering meet the present definition.

More Definitions of Integrated head restraint

Integrated head restraint means a head restraint formed by the upper part of the seat-back."
Integrated head restraint means a head restraint formed by the upper part of the seat‑back."
Integrated head restraint means a head restraint constituted by the upper part of the seat back. Head restraints corresponding to the definitions in paragraphs 2.2.2 and 2.2.3 below, but which cannot be detached from the seat or the vehicle structure except by the use of tools or following the partial or total removal of the seat furnishings, correspond to this definition;
Integrated head restraint or “fixed head restraint” means a head restraint formed by the upper part of the seat back, or a head restraint that is not height adjustable and cannot be detached from the seat or the vehicle structure except by the use of tools or following the partial or total removal of the seat furnishings.
Integrated head restraint means a head restraint formed by the upper part of
Integrated head restraint means a head restraint formed by the upper part of the seat-back. Head restraints meeting the definitions of paragraphs

Related to Integrated head restraint

  • Non-transient non-community water system means a public water system that is not a community water system and that regularly serves at least 25 of the same persons over 6 months per year.

  • Transient non-community water system or “transient non-CWS” means a non- CWS that does not regularly serve at least 25 of the same persons over six months of the year.

  • public service infrastructure means publicly controlled infrastructure of the following kinds:

  • Integrated resource plan means a plan which contains the demand and energy forecast for at least a fifteen-year period, contains the supplier's or producer's program for meeting the requirements shown in its forecast in an economic and reliable manner, including both demand-side and supply-side options, with a brief description and summary cost-benefit analysis, if available, of each option which was considered, including those not selected, sets forth the supplier's or producer's assumptions and conclusions with respect to the effect of the plan on the cost and reliability of energy service, and describes the external environmental and economic consequences of the plan to the extent practicable. For electrical utilities subject to the jurisdiction of the South Carolina Public Service Commission, this definition must be interpreted in a manner consistent with the integrated resource planning requirements pursuant to Section 58‑37‑40 and any process adopted by the commission. For electric cooperatives subject to the regulations of the Rural Electrification AdministrationUtilities Service, this definition must be interpreted in a manner consistent with any integrated resource planning process prescribed by Rural Electrification Administration Utilities Service regulations.

  • Integrated Development Plan means a plan formulated and approved as envisaged in Section 25 of the Municipal Systems Act 2000, as amended.

  • integrated iron and steel industry means an industry for the manufacture of iron and steel or for the manufacture of steel from iron ore by a process which does not necessarily involve the production of pig iron or basic iron in the production of steel;

  • Nontransient noncommunity water system means a public water system that is not a community water system and that regularly serves at least the same 25 persons over 6 months per year.

  • Regional Transmission Expansion Plan means the plan prepared by the Office of the Interconnection pursuant to Operating Agreement, Schedule 6 for the enhancement and expansion of the Transmission System in order to meet the demands for firm transmission service in the PJM Region.

  • Mechanical restraint means any device or object used to limit a student’s movement.

  • Limited Demand Resource Reliability Target for the PJM Region or an LDA, shall mean the maximum amount of Limited Demand Resources determined by PJM to be consistent with the maintenance of reliability, stated in Unforced Capacity that shall be used to calculate the Minimum Extended Summer Demand Resource Requirement for Delivery Years through May 31, 2017 and the Limited Resource Constraint for the 2017/2018 and 2018/2019 Delivery Years for the PJM Region or such LDA. As more fully set forth in the PJM Manuals, PJM calculates the Limited Demand Resource Reliability Target by first: i) testing the effects of the ten- interruption requirement by comparing possible loads on peak days under a range of weather conditions (from the daily load forecast distributions for the Delivery Year in question) against possible generation capacity on such days under a range of conditions (using the cumulative capacity distributions employed in the Installed Reserve Margin study for the PJM Region and in the Capacity Emergency Transfer Objective study for the relevant LDAs for such Delivery Year) and, by varying the assumed amounts of DR that is committed and displaces committed generation, determines the DR penetration level at which there is a ninety percent probability that DR will not be called (based on the applicable operating reserve margin for the PJM Region and for the relevant LDAs) more than ten times over those peak days; ii) testing the six-hour duration requirement by calculating the MW difference between the highest hourly unrestricted peak load and seventh highest hourly unrestricted peak load on certain high peak load days (e.g., the annual peak, loads above the weather normalized peak, or days where load management was called) in recent years, then dividing those loads by the forecast peak for those years and averaging the result; and (iii) (for the 2016/2017 and 2017/2018 Delivery Years) testing the effects of the six-hour duration requirement by comparing possible hourly loads on peak days under a range of weather conditions (from the daily load forecast distributions for the Delivery Year in question) against possible generation capacity on such days under a range of conditions (using a Monte Carlo model of hourly capacity levels that is consistent with the capacity model employed in the Installed Reserve Margin study for the PJM Region and in the Capacity Emergency Transfer Objective study for the relevant LDAs for such Delivery Year) and, by varying the assumed amounts of DR that is committed and displaces committed generation, determines the DR penetration level at which there is a ninety percent probability that DR will not be called (based on the applicable operating reserve margin for the PJM Region and for the relevant LDAs) for more than six hours over any one or more of the tested peak days. Second, PJM adopts the lowest result from these three tests as the Limited Demand Resource Reliability Target. The Limited Demand Resource Reliability Target shall be expressed as a percentage of the forecasted peak load of the PJM Region or such LDA and is converted to Unforced Capacity by multiplying [the reliability target percentage] times [the Forecast Pool Requirement] times [the DR Factor] times [the forecasted peak load of the PJM Region or such LDA, reduced by the amount of load served under the FRR Alternative].

  • standard term sheet has the meaning ascribed thereto in NI 41-101;

  • Interregional Transmission Project means transmission facilities that would be located within two or more neighboring transmission planning regions and are determined by each of those regions to be a more efficient or cost effective solution to regional transmission needs.

  • Public garage means a building or other place where vehicles or vessels are kept and stored and where a charge is made for the storage and keeping of vehicles and vessels.

  • Central Office Switch (CO means the switching entity within the public switched Telecommunications network, including but not limited to:

  • Public Areas shall include, but not be limited to, public or common rooms, waiting rooms, lobbies and public meeting rooms, or other similar areas which are open to the general public.

  • Psychiatric residential treatment facility means a facility which

  • Central Transmission Utility means the Government Company notified by the Central Government under Sub-Section (1) of Section 38 of the Electricity Act, 2003.

  • Integrated Services Digital Network (ISDN means a switched network service that provides end-to-end digital connectivity for the simultaneous transmission of voice and data. Basic Rate Interface-ISDN (BRI-ISDN) provides for a digital transmission of two (2) 64 Kbps bearer channels and one (1) 16 Kbps data channel (2B+D).

  • Serving Wire Center (SWC) means the Wire Center that serves the area in which the other Party’s or a Third Party’s Wire Center, aggregation point, point of termination, or point of presence is located.

  • Network Integration Transmission Service means the transmission service provided under Tariff, Part III.

  • Integrated pest management means careful consideration of all available plant protection methods and subsequent integration of appropriate measures that discourage the development of populations of harmful organisms and keep the use of plant protection products and other forms of intervention to levels that are economically and ecologically justified and reduce or minimise risks to human health and the environment. ‘Integrated pest management’ emphasises the growth of a healthy crop with the least possible disruption to agro-ecosystems and encourages natural pest control mechanisms;

  • CTU or Central Transmission Utility means the Central Transmission Utility as defined in sub-section (10) of Section 2 of the Electricity Act 2003;

  • vertically integrated undertaking means an electricity undertaking or a group of electricity undertakings where the same person or the same persons are entitled, directly or indirectly, to exercise control, and where the undertaking or group of undertakings perform at least one of the functions of transmission or distribution, and at least one of the functions of generation or supply of electricity;

  • Interconnected Reliability Operating Limit or “IROL” shall mean the value (such as MW, MVAR, Amperes, Frequency, or Volts) derived from, or a subset of, the System Operating Limits, which if exceeded, could expose a widespread area of the bulk electrical system to instability, uncontrolled separation(s) or cascading outages.

  • Public water system means a system for the provision of water for human consumption through pipes or other constructed conveyances that has 15 or more service connections or regularly serves at least 25 individuals daily at least 60 days out of the year.

  • State Transmission Utility or “STU” shall mean the Board or the Government company notified by the respective State Government under Sub-section (1) of Section 39 of the Act;