Integration as defined in ORS 427.005 means:
Coordinated Transaction Scheduling or “CTS” shall mean the market rules that allow transactions to be scheduled based on a bidder’s willingness to purchase energy from a source in either the NYISO or PJM Control Area and sell it at a sink in the other Control Area if the forecasted price at the sink minus the forecasted price at the corresponding source is greater than or equal to the dollar value specified in the bid.
Integration Proponent means in relation to an Integration Agreement, “the Company” or “the Joint Venturers” as the case may be as defined in, and for the purpose of, that Integration Agreement;
Implementation Schedule means the Implementation Schedule in Section VII of the tendering documents.
External beam radiation therapy means therapeutic irradiation in which the source of radiation is at a distance from the body.
Coordinated External Transaction means a transaction to simultaneously purchase and sell energy on either side of a CTS Enabled Interface in accordance with the procedures of Operating Agreement, Schedule 1, section 1.13, and the parallel provisions of Tariff, Attachment K- Appendix.
service delivery and budget implementation plan means a detailed plan approved by the executive mayor of a municipality in terms of section 53(l)(c)(ii) of the MFMA for implementing the municipality's delivery of municipal services and its annual budget, and which must indicate
Interconnection Study means any of the studies defined in the CAISO Tariff or, if applicable, any distribution provider’s tariff that reflect the methodology and costs to interconnect the Project to the Participating Transmission Owner’s electric grid.
SRS means the scheme referred to by the Ministry of Finance as the Supplementary Retirement Scheme or such other scheme as shall replace or supersede the Supplementary Retirement Scheme from time to time.
Internal combustion engine or ‘engine’ means an energy converter, other than a gas turbine, designed to transform chemical energy (input) into mechanical energy (output) with an internal combustion process; it includes, where they have been installed, the emission control system and the communication interface (hardware and messages) between the engine's electronic control unit(s) and any other powertrain or non-road mobile machinery control unit necessary to comply with Chapters II and III;
Interconnection Studies means the Interconnection Feasibility Study, the System Impact Study, and the Facilities Study described in Tariff, Part IV and Tariff, Part VI. Interface Pricing Point:
online interface means any software, including a website, part of a website or an application, that is operated by or on behalf of an economic operator, and which serves to give end users access to the economic operator's products;
Interface means the mixture occurring in pipeline operations between adjoining batches having similar or dissimilar physical characteristics.
Interoperability means the ability of a Qwest OSS Function to process seamlessly (i.e., without any manual intervention) business transactions with CLEC's OSS application, and vice versa, by means of secure exchange of transaction data models that use data fields and usage rules that can be received and processed by the other Party to achieve the intended OSS Function and related response. (See also Electronic Bonding.)
Planned External Financed Generation Capacity Resource means a Planned External Generation Capacity Resource that, prior to August 7, 2015, has an effective agreement that is the equivalent of an Interconnection Service Agreement, has submitted to the Office of the Interconnection the appropriate certification attesting achievement of Financial Close, and has secured at least 50 percent of the MWs of firm transmission service required to qualify such resource under the deliverability requirements of the Reliability Assurance Agreement.
Stationary internal combustion engine means a spark or compression ignited, reciprocating internal combustion engine which is not a portable emission unit.
Interconnection Feasibility Study means either a Generation Interconnection Feasibility Study or Transmission Interconnection Feasibility Study.
Dynamic driving task means the same as that term is defined in Section 41-26-102.1.
LOCKHEED XXXXXX Procurement Representative means a person authorized by LOCKHEED XXXXXX'x cognizant procurement organization to administer and/or execute this Contract.
Generation Interconnection Feasibility Study means a study conducted by the Transmission Provider (in coordination with the affected Transmission Owner(s)) in accordance with Tariff, Part IV, section 36.2.
Mid-Span Fiber Meet An Interconnection architecture whereby two carriers’ fiber transmission facilities meet at a mutually agreed upon point for the mutual exchange of traffic, subject to the trunking requirements and other terms and provisions of this Agreement. The “point” of Interconnection for purposes of 47 U.S.C §§251(c)(2) and 251(c)(3) remains on CenturyLink’s network and is limited to the Interconnection of facilities between the CenturyLink Serving Wire Center and the location of the CLEC switch or other equipment located within the area served by the CenturyLink Serving Wire Center. Minutes of Use: Shall be abbreviated as MOU. Multiple Exchange Carrier Access Billing (MECAB): The document prepared by the Billing Committee of the Ordering and Billing Forum (OBF), which functions under the auspices of the Carrier Liaison Committee (CLC) of the Alliance for Telecommunications Industry Solutions (ATIS). The currently effective version of the MECAB document, published by ATIS (0401004-00XX), contains the recommended guidelines for the billing of an Access Service provided by two or more LECs, or by one LEC in two or more states within a single LATA. Multiple Exchange Carriers Ordering and Design Guidelines for Access Services - Industry Support Interface (MECOD): A document developed by the Ordering/Provisioning Committee under the auspices of the Ordering and Billing Forum (OBF), which functions under the auspices of the Carrier Liaison Committee (CLC) of the Alliance for Telecommunications Industry Solutions (ATIS). The currently effective version of the MECOD document, published by ATIS (0404120-00XX), establishes methods for processing orders for Access Service that is to be provided by two or more LECs. National Emergency Number Association (NENA): A not-for-profit corporation established in 1982 to further the goal of “One Nation-One Number” for emergency calls. NENA is a networking source and promotes research, planning, and training. NENA strives to educate, set standards and provide certification programs, legislative representation and technical assistance for implementing and managing 911 systems.
Beam axis means a line from the source through the centers of the x-ray fields.
Optional Interconnection Study Agreement means the form of agreement for preparation of an Optional Interconnection Study, as set forth in Tariff, Attachment N-3. Part I:
Base Load Generation Resource means a Generation Capacity Resource that operates at least 90 percent of the hours that it is available to operate, as determined by the Office of the Interconnection in accordance with the PJM Manuals.
TDP means “TDP” as that term is defined in the Second Amended Joint Plan or as that term is defined in any Plan confirmed by the Bankruptcy Court.
SCCs means the standard contractual clauses for the transfer of Personal Data to third countries pursuant to Regulation (EU) 2016/679 of the European Parliament and of the Council, and implemented by the European Commission decision 2021/914, dated 4 June 2021.