Interconnection Tripping Schedule definition

Interconnection Tripping Schedule. The inter-tripping logic to be developed to indicate protection relays and their proposed settings for electrical protection of the Facility and the interconnection of the Facility to the JPS Grid System.
Interconnection Tripping Schedule. The inter-tripping logic to be developed to indicate protection relays and their proposed settings for electrical protection of the Complex and the interconnection of the Complex to the JPS’ Grid. “Jamaica Electricity Sector Book of Codes” – The comprehensive Grid Codes which have been developed in parallel, designed to provide a comprehensive framework for the development, maintenance and operation of an efficient, safe and reliable Jamaican Power Grid.

Related to Interconnection Tripping Schedule

  • Interconnection Point means the point(s) of connection(s) at which the project is connected to the grid i.e. it shall be at 11 / 22 kV bus bar level of substation of MSEDCL.

  • Interconnection is As Defined in the Act.

  • Interconnection Activation Date means the date that the construction of the joint facility Interconnection arrangement has been completed, trunk groups have been established, joint trunk testing is completed and trunks have been mutually accepted by the Parties.

  • Interconnection Facilities means the Transmission Owner Interconnection Facilities and the Customer Interconnection Facilities.

  • Surplus Interconnection Service means any unneeded portion of Interconnection Service established in an Interconnection Service Agreement, such that if Surplus Interconnection Service is utilized, the total amount of Interconnection Service at the Point of Interconnection would remain the same. Switching and Tagging Rules:

  • interconnected system means a number of transmission and distribution systems linked together by means of one or more interconnectors;