JPS Grid. The transmission and distribution facilities on JPS’ side of the Interconnection Point through which the output of the Facility will be distributed by JPS to users of electricity.
JPS Grid. The transmission or distribution facilities on JPS' side of the Interconnection Point through which the Net Energy Output of the Complex will be distributed by JPS to users of electricity. "JPS Termination Notice" - A notice of termination issued by JPS to the Company pursuant to Clause 12.4. “kW” - Kilowatts. "kWh" - Kilowatt-hours. "Laws of Jamaica" - The laws of Jamaica and all proclamations, rules, regulations, subsidiary legislation, notifications and policies made pursuant thereto.
JPS Grid means JPS’ transmission and distribution network.

Examples of JPS Grid in a sentence

  • Notwithstanding the foregoing, the Company reserves the right, without penalty, to immediately isolate itself from the JPS Grid in the event of voltage or frequency variations (“abnormal or contingency conditions”) on the JPS Grid and/or the Interconnection Facilities outside of the limits within which it is obligated to operate.

  • The Company warrants that the JPS Interconnection Facilities are free from defects in materials and workmanship for a period of one (1) year from the Commercial Operations Date and are of such standard and technical specification to accommodate any supply of energy to the JPS Grid.

  • The Facility shall remain transiently stable and connected to the JPS Grid without tripping of the Facility.

  • The Operating Committee shall be responsible for (a) coordinating the construction schedules of each Parties' portion of the Facility, Interconnection Facilities and required modifications to the JPS Grid and (b) Ongoing coordination of areas of mutual interest and concern involving the Facility and the Interconnection Facilities.

  • The energy price for any given Month shall be the short run avoided cost of generation to the JPS Grid which price shall be published by the OUR from time to time.

  • The disconnect switch shall be located on the load side of the JPS Grid such that it can be isolated from the JPS distribution network.

  • The OUR’s “Declaration of Indicative Generation Avoided Costs” Document # Ele 2010/ELE2010009_DCL001 published December 2010, as such document may be amended or replaced, shall govern the energy price payable by JPS for energy supplied to the JPS Grid by the QE from the QF in accordance with this Contract.

  • Notwithstanding the foregoing, the Company reserves the right, without penalty, to immediately isolate itself from the JPS Grid in the event of voltage or frequency variations (“abnormal or contingency conditions”) on the JPS Grid and or the JPS Interconnection Facilities outside of the limits within which it is obligated to operate.

  • The Operating Committee shall be responsible for (a) coordinating the construction schedules of each Parties' portion of the Complex, Interconnection Facilities and required modifications to the JPS Grid and (b) Ongoing coordination of areas of mutual interest and concern involving the Complex and the Interconnection Facilities.

  • The Company shall install such equipment that shall allow the Company to supply to generate and supply power to the JPS Grid in accordance with the applicable power factor parameters set out in the Generation Code.

Related to JPS Grid

  • Pricing Grid the pricing grid attached hereto as Annex A.

  • Pricing Level III shall exist on an Adjustment Date if the Consolidated Leverage Ratio for the relevant period is less than 3.75 to 1.00 but greater than or equal to 3.25 to 1.00.

  • Level III Pricing applies on any day on which (i) the Borrower’s long-term debt is rated A- or higher by S&P or A3 or higher by Moody’s and (ii) neither Level I Pricing nor Level II Pricing applies.

  • Level III means a level of detail in the CPM Schedule which is an implementation (control) schedule used to direct the Work by providing schedule parameters to the more detailed implementation level, identify and resolve schedule problems, status progress in terms of Milestones, measure the impact of scope changes and delays, develop recovery plans, and support schedule-related contractual action. The work breakdown structure in the Level III CPM Schedule is at an area level, and shall involve over two thousand (2,000) activities. The Level III CPM Schedule is developed with the assistance of and accepted by Contractor’s Key Personnel. All Major Equipment (including bulk material requirements) are scheduled at area level and detailed construction activities at each commodity level follow the same area concept. The Subcontract schedules are similarly developed for each area, as applicable.

  • Digital Signal Level 0 (DS-0) means the lowest-level signal in the time division multiplex digital hierarchy, and represents a voice-grade channel operating at either the 56 Kbps or 64 Kbps transmission bit rates. There are twenty-four (24) DS-0 channels in a DS-1.