Closing Date and Time means the deadline for the submission of Proposals as set out herein.
Proposal Due Date and Time means the date and time specified in the Request for Proposal as the deadline for submitting Proposals.
Expiry Date (Data di Scadenza) means the Expiry Date as specified in § 1 of the Product and Underlying Data.
Drywell means an unlined or partially lined underground pit (regardless of geometry) into which drainage from roofs, basement floors, water softeners or other non-wastewater sources is discharged and from which the liquid seeps into the surrounding soil.
Transportation network company rider or “rider” means an
Opium poppy means the plant of the species Papaver somniferum L., except its seeds.
Effective Date of Coverage means the date of commencement of Coverage in respect of a Life Insured under the Policy pursuant to the provision on Commencement of Coverage.
Peer support specialist means an individual who has experienced a severe and persistent mental illness and who has successfully completed standardized training to provide peer support services through the medical assistance program or the Iowa Behavioral Health Care Plan.
Basic Comprehensive User Guide means the Ministry document titled Basic Comprehensive Certificates of Approval (Air) User Guide” dated April 2004 as amended.
Bathroom and tile cleaner means a product designed or labeled to clean tile or surfaces in bathrooms. “Bathroom and Tile Cleaner” does not include “Toilet/Urinal Care Product.”
Current closure cost estimate means the most recent of the estimates pre- pared in accordance with § 265.142 (a), (b), and (c).
Sewage sludge weight means the weight of sewage sludge, in dry U.S. tons, including admixtures such as liming materials or bulking agents. Monitoring frequencies for sewage sludge parameters are based on the reported sludge weight generated in a calendar year (use the most recent calendar year data when the NPDES permit is up for renewal).
Commercial Operation Date (COD) means the date certified by the DISCOM’s committee upon successful commissioning (as per provisions of the PPA) of the project when all equipments as per rated capacity have been installed and energy has flown into the grid.
technical specification means a document that prescribes technical requirements to be fulfilled by a product, process or service;
Subsurface Borings and Testing means borings, probings and subsurface explorations, laboratory tests and inspections of samples, materials and equipment; appropriate professional interpretations of all the foregoing.
Standard Methods for the Examination of Water and Wastewater means the most recent edition of Standard Methods for the Examination of Water and Wastewater published jointly by the American Public Health Association, the American Waterworks Association and the Water Environment Federation;
Cold Weather Alert means the notice that PJM provides to PJM Members, Transmission Owners, resource owners and operators, customers, and regulators to prepare personnel and facilities for expected extreme cold weather conditions.
NZOC means the New Zealand Olympic Committee Incorporated.
Intermodal Rail Yard means a rail facility in which cargo is transferred from drayage truck to train or vice-versa.
Post-closure plan means a plan indicating the actions to be taken for the care, maintenance, and monitoring of the Development after closure, that will prevent, mitigate, or minimize the threat to public health and the environment;
Standard Amendment Coversheet refers to the form used by the Judicial Council to amend agreements with other parties. Several originally signed, fully executed versions of a Standard Amendment, together with the integrated Contract Documents, shall each represent an Amendment as an individual contract counterpart.
Equipment with Specific Operational Limits means any Equipment related to the thermal oxidation of waste or waste derived fuels, fume incinerators or any other Equipment that is specifically referenced in any published Ministry document that outlines specific operational guidance that must be considered by the Director in issuing of a Certificate of Approval.
GAC20 means granular activated carbon filter beds with an empty-bed contact time of 20 minutes based on average daily flow and a carbon reactivation frequency of every 240 days.
Single Phase Aerosol Air Freshener means an aerosol air freshener with the liquid contents in a single homogeneous phase and which does not require that the product container be shaken before use.
Time Block means a time block of 15 minutes, for which specified electrical parameters and quantities are recorded by special energy meter, with first time block starting at 00.00 hrs;
oil tanker means a ship constructed or adapted primarily to carry oil in bulk in its cargo spaces and includes combination carriers and any “chemical tanker” as defined in Annex II of the present Convention when it is carrying a cargo or part cargo of oil in bulk.