Examples of Load Control System in a sentence
If the Entrant or any part of the Entrant’s Load Control System interferes with, or causes damage to, any part of the Incumbent’s Load Control System, the Entrant must, on receiving notice from the Incumbent or on becoming aware of the situation, promptly and at its own cost remove the source of the interference and make good any damage.
Prior to operating its Load Control System, the Retailer will enter into an agreement with the Distributor which sets out the protocols for the use of the load, including the co-ordination with the Distributor of the disconnection and reconnection of load, such protocols being intended to ensure that the security, safety and integrity of the Network is not adversely affected by such load control.
Without limiting the foregoing, the Retailer will ensure that it does not operate its Load Control System in a manner that it knows will or may adversely affect the security, safety or integrity of the Network.
The Retailer shall ensure that such protocols are followed when operating its Load Control System.
S7.2 To facilitate the use of a Load Control System to achieve the highest value, the party that has obtained the right to control a load may assign that right to another party (provided that the party obtains the right to make such an assignment from the Consumer).
The Entrant must ensure that neither it nor its Load Control System interferes with the proper functioning of, or causes damage to, the Incumbent’s Load Control System.
The Entrant must ensure that neither it nor its Load Control System interferes with the properfunctioning of, or causes damage to, the Incumbent’s Load Control System.
Prior to operating its Load Control System, the Retailer will enter into an agreement with the Distributor which sets out the protocols for the use of the load, including the co-ordination with the Distributor of the disconnection and reconnection of load.
To facilitate the use of a Load Control System to achieve the highest value, the party that has obtained the right to control a load may assign that right to another party (provided that the party obtains the right to make such an assignment from the relevant Customer).
Without limiting the foregoing, the Retailer will ensure that it does not operate its Load Control System in a manner that it knows will or may adversely affect the security of the Network.