Loaded test definition

Loaded test means an exhaust emissions test conducted at cruise or transient conditions as prescribed by the director.

Examples of Loaded test in a sentence

  • Loaded test equipment specifications shall meet United States Environmental Protection Agency requirements for acceleration simulation mode equipment.

  • Loaded test 6.1.2 The survival craft or rescue boat, loaded with its normal equipment or an equivalent mass and a distributed mass equivalent to that of the number of persons, each weighing 75 kg, it is permitted to accommodate, should be released by operation of the launching control on deck.

  • Loaded test equipment specifications shall meet United States Environmental Protection Agency [EPA] requirements for acceleration simulation mode [Acceleration Simulation Mode] equipment.

  • Safety inspection shall be carried out in the following order: - Inspection of the profile of the lift; - External inspection; - Technical inspection – No-load test; - Loaded test – Test methods; - Inspection result processing.

  • Loaded test equipment specifications must [shall] meet United States Environmental Protection Agency requirements for acceleration simulation mode equipment.

  • AS TESTED VEHICLE WEIGHT CONDITION (1) With the test vehicle in the Fully Loaded test weight condition, drain the fuel system and operate the engine until the fuel system is dry.

  • Loaded test equipment specifications shall meet EPA requirements for Acceleration Simulation Mode equipment.

  • Loaded test results are given in Table 3.2. While using PCM compressor running time both 6 mm and 8 mm decreased.

  • Safety inspection shall be carried out in the following order:- Inspection of the profile of the lift;- External inspection;- Technical inspection – No-load test;- Loaded test – Test methods;- Inspection result processing.Note: Only take the next step if the previous step is passed.

Related to Loaded test

  • DNS test Means one non-­‐recursive DNS query sent to a particular “IP address” (via UDP or TCP). If DNSSEC is offered in the queried DNS zone, for a query to be considered answered, the signatures must be positively verified against a corresponding DS record published in the parent zone or, if the parent is not signed, against a statically configured Trust Anchor. The answer to the query must contain the corresponding information from the Registry System, otherwise the query will be considered unanswered. A query with a “DNS resolution RTT” 5 times higher than the corresponding SLR, will be considered unanswered. The possible results to a DNS test are: a number in milliseconds corresponding to the “DNS resolution RTT” or, undefined/unanswered.

  • RDDS test Means one query sent to a particular “IP address” of one of the servers of one of the RDDS services. Queries shall be about existing objects in the Registry System and the responses must contain the corresponding information otherwise the query will be considered unanswered. Queries with an RTT 5 times higher than the corresponding SLR will be considered as unanswered. The possible results to an RDDS test are: a number in milliseconds corresponding to the RTT or undefined/unanswered.

  • EPP test Means one EPP command sent to a particular “IP address” for one of the EPP servers. Query and transform commands, with the exception of “create”, shall be about existing objects in the Registry System. The response shall include appropriate data from the Registry System. The possible results to an EPP test are: a number in milliseconds corresponding to the “EPP command RTT” or undefined/unanswered.

  • Fit test means the use of a protocol to qualitatively or quantitatively evaluate the fit of a respirator on an individual.

  • COVID-19 test means a viral test for SARS-CoV-2 that is:

  • Start-Up Testing means the completion of applicable required factory and start-up tests as set forth in Exhibit C.

  • Drug use test means a scientifically substantiated method to test for the presence of illegal or performance-enhancing drugs or the metabolites thereof in a person’s urine.

  • Critical Test Concentration or "(CTC)" means the specified effluent dilution at which the Permittee is to conduct a single-concentration Aquatic Toxicity Test.

  • Drug test means a test designed to detect the illegal use of a controlled substance.

  • Asset Test means, for an Asset Review, each Test, as defined in the Asset Representations Review Agreement, in Schedule A to the Asset Representations Review Agreement to be performed by the Asset Representations Reviewer on the related Asset Review Receivables.

  • Cannabis testing facility means an entity registered by

  • Genetic test means an analysis of human DNA, RNA, chromosomes, proteins, or metabolites, that detect genotypes, mutations, or chromosomal changes. The term “genetic test” does not mean an analysis of proteins or metabolites that does not detect genotypes, mutations, or chromosomal changes; or an analysis of proteins or metabolites that is directly related to a manifested disease, disorder, or pathological condition that could reasonably be detected by a health care professional with appropriate training and expertise in the field of medicine involved.

  • Excess Concentration means, without duplication, the sum of the following amounts:

  • Small quantity generator means a generator who generates less than 1000 kg of hazardous waste in a calendar month.

  • Harvest batch means a specifically identified quantity of dried flower or trim, leaves, and other cannabis plant matter that is uniform in strain, harvested at the same time, and, if applicable, cultivated using the same pesticides and other agricultural chemicals, and harvested at the same time.

  • 2 Wire Analog Voice Grade Loop or “Analog 2W” provides an effective 2-wire channel with 2-wire interfaces at each end that is suitable for the transport of analog Voice Grade (nominal 300 to 3000 Hz) signals and loop-start signaling. This Loop type is more fully described in Verizon Technical Reference (TR)-72565, as revised from time-to-time. If “Customer-Specified Signaling” is requested, the Loop will operate with one of the following signaling types that may be specified when the Loop is ordered: loop-start, ground-start, loop- reverse-battery, and no signaling. Customer specified signaling is more fully described in Verizon TR-72570, as revised from time-to- time. Verizon will not build new facilities.

  • Tractor truck means every motor vehicle designed and used primarily for drawing other vehicles

  • Buffer Zone means an area designated to be left along roads or other features in which there will be no cutting.

  • Plant Test Date or "PTD" means the date acceptance testing is performed with CLEC. "Point of Interface", "Point of Interconnection," or "POI" is a demarcation between the networks of two (2) LECs (including a LEC and CLEC). The POI is that point where the exchange of traffic takes place.

  • Generator Forced Outage means an immediate reduction in output or capacity or removal from service, in whole or in part, of a generating unit by reason of an Emergency or threatened Emergency, unanticipated failure, or other cause beyond the control of the owner or operator of the facility, as specified in the relevant portions of the PJM Manuals. A reduction in output or removal from service of a generating unit in response to changes in market conditions shall not constitute a Generator Forced Outage.

  • Incurrence Test means the incurrence test set out in Clause 12.1 (Incurrence Test).

  • Screening Test means a drug or alcohol test which uses a method of analysis allowed by the Minnesota Drug and Alcohol Testing in the Workplace Act to be used for such purposes.

  • Percolation test means a subsurface soil test at the depth of a proposed absorption system or similar component of an OWTS to determine the water absorption capability of the soil, the results of which are normally expressed as the rate at which one inch of water is absorbed. The rate is expressed in minutes per inch.

  • Commissioning test means tests applied to a distributed generation facility by the applicant after construction is completed to verify that the facility does not create adverse system impacts and performs to the submitted specifications. At a minimum, the scope of the commissioning tests performed shall include the commissioning test specified in Institute of Electrical and Electronics Engineers, Inc. (IEEE) Standard 1547 Section 5.4 "Commissioning tests".

  • Genetic testing means an analysis of genetic markers to exclude or identify a man as the father or a woman as the mother of a child. The term includes an analysis of one or a combination of the following:

  • Acceptance Test is a test of the Features executed by the Customer to prepare the acceptance.