Maximum State of Charge definition

Maximum State of Charge means the maximum State of Charge that should not be exceeded, measured in units of megawatt-hours. “Merchant A.C. Transmission Facility” shall mean Merchant Transmission Facilities that are alternating current (A.C.) transmission facilities, other than those that are Controllable A.C. Merchant Transmission Facilities. “Merchant D.C. Transmission Facilities” shall mean direct current (D.C.) transmission facilities that are interconnected with the Transmission System pursuant to Tariff, Part IV and Tariff, Part
Maximum State of Charge means the maximum State of Charge that should not be exceeded, measured in units of megawatt-hours.
Maximum State of Charge means, a State of Charge equal to 100%, at which point Buyer cannot schedule and deliver any further Charging Energy to the Storage Facility.

Examples of Maximum State of Charge in a sentence

  • Maximum State of Charge (MaxSOC) The maximum amount of State of Charge, in MWh of an ESR.

  • Small Generating Facility’s Primary Frequency Response Operating Range Pursuant to Article 1.8.3.4 of this Agreement, NYPA must provide primary frequency response consistent with Articles 1.8.3, 1.8.3.1, 1.8.3.2, and 1.8.3.3 of this Agreement when its operating range is between: Minimum State of Charge: 10%; and Maximum State of Charge: 90%.

  • Those physical and operating characteristics are as follows: (1) State of Charge, (2) Maximum State of Charge, (3) Minimum State of Charge, (4) Maximum Charge Limit, (5) Maximum Discharge Limit, (6) Minimum Charge Time, (7) Maximum Charge Time, (8) Minimum Run Time, (9) Maximum Run Time, (10) Minimum Discharge Limit, (11) Minimum Charge Limit, (12) Discharge Ramp Rate, and(13) Charge Ramp Rate.

  • PJM Compliance Fling, ER20-469-000.October 17th Order found (at P 174) that the PJM rules did not appropriately account for an Energy Storage Resource’s State of Charge, Maximum State of Charge, and Minimum State of Charge through bidding parameters or other means in both its day-ahead and real-time market dispatch, as required by Order No. 841.

  • Commission Determination‌ We find that PJM’s proposed tariff revisions do not comply with the requirement of Order No. 841 to account for the State of Charge, Maximum State of Charge, and Minimum State of Charge of resources using the Storage Participation Model.

  • In the event of such an arbitrator to whom the matter is originally referred, vacating his office or being unable to act for any reason whatsoever, the WAPCOS/CSEZA shall appoint another person to act as an arbitrator in accordance with terms of the agreement and the person so appointed shall be entitled to proceed from the stage at which it was left out by his predecessors.The arbitrator may from time to time with the consent of both the parties enlarge the time frame for making and publishing the award.

  • Id.Respondent argues that, as part of the violence in the work- place policy, which also prohibits banning weapons in the work- place, makes the rule lawful and that an employee reasonably would not find the rule to be construed any other way.7 How- ever, on its face, the rule is overly broad as employees would not know what discussion was permissible under Section 7.

  • Print agreement from Queue Point, complete the Certification section above the signature block, enter the information required for energy storage resources (write in the values for Minimum and Maximum State of Charge if applicable), and have your signatory execute the agreement.

  • As such, ESA respectfully requests that the Commission find that PJM’s failure to include state of charge parameters is non-compliant with Order 841 and direct PJM to initiate a stakeholder process to create a market design that (1) includes the three state of charge parameters (State of Charge, Maximum State of Charge, and Minimum State of Charge) as defined by and required by Order 841 and (2) utilizes them appropriately.

  • It depends on connection mode and the charge point (kW).o : Maximum power available for the electrical installation where the charger is located (kW).o t: Timestep corresponding to the input arrays (h).o : Maximum State of Charge of the Electric Vehicle (kWh) Requirementso : Charger power setpoint.


More Definitions of Maximum State of Charge

Maximum State of Charge means the maximum State of Charge that should not be exceeded, measured in units of megawatt- hours.

Related to Maximum State of Charge

  • Minimum State of Charge means the minimum State of Charge that should be maintained in units of megawatt-hours.

  • State of Charge means the operating parameter that represents the quantity of physical energy stored (measured in units of megawatt-hours) in an Energy Storage Resource Model Participant in proportion to its maximum State of Charge capability. State of Charge is quantified as defined in the PJM Manuals.

  • Schedule of Charges means the schedule as seen in clause Schedule of Charges;

  • AT&T WEST REGION 2-STATE means the AT&T owned ILEC(s) doing business in California and Nevada.

  • Minimum Charge means the higher of the rate minimum and the rate applied to the Contracted Minimum Demand;