Examples of Maximum State of Charge in a sentence
Maximum State of Charge (MaxSOC) The maximum amount of State of Charge, in MWh of an ESR.
We support the need for new and amended legislation to expedite our actions to address poor performance and illegal waste activity.
The QSE shall ensure that the State of Charge (SOC) is greater than or equal to the Minimum State of Charge (MinSOC) and less than or equal to the Maximum State of Charge (MaxSOC).
Minimum State of Charge (MinSOC);(ii) Maximum State of Charge (MaxSOC); and(iii) Hour Beginning Planned SOC.
Those physical and operating characteristics are as follows: (1) State of Charge, (2) Maximum State of Charge, (3) Minimum State of Charge, (4) Maximum Charge Limit, (5) Maximum Discharge Limit, (6) Minimum Charge Time, (7) Maximum Charge Time, (8) Minimum Run Time, (9) Maximum Run Time, (10) Minimum Discharge Limit, (11) Minimum Charge Limit, (12) Discharge Ramp Rate, and(13) Charge Ramp Rate.
PJM Compliance Fling, ER20-469-000.October 17th Order found (at P 174) that the PJM rules did not appropriately account for an Energy Storage Resource’s State of Charge, Maximum State of Charge, and Minimum State of Charge through bidding parameters or other means in both its day-ahead and real-time market dispatch, as required by Order No. 841.
Commission Determination We find that PJM’s proposed tariff revisions do not comply with the requirement of Order No. 841 to account for the State of Charge, Maximum State of Charge, and Minimum State of Charge of resources using the Storage Participation Model.
Please explain how PJM’s proposed participation model accounts for Minimum State of Charge, Maximum State of Charge, Minimum Charge Time, Maximum Charge Time, Minimum Run Time, and Maximum Run Time.
Describe the electrical connections between the generation facility and the load.THE FOLLOWING APPLIES TO ENERGY STORAGE RESOURCES: Primary frequency response operating range for Energy Storage Resources: Formatted: Justified, No widow/orphan controlFormatted: Justified, Indent: First line: 0", No widow/orphan control Minimum State of Charge: ; and Maximum State of Charge: .
If it is found within the lower (SoCLL) and upper (SoCUL) limits of SoC, obtained using the Maximum Depth of Discharge (DoDmax), the Maximum State of Charge (SoCmax), and buffer energy EBuff, then a charge/discharge operation is performed depending on the sign of PCOMP(k).