Minimum Hard Time Component Flight Hours definition

Minimum Hard Time Component Flight Hours means [****] Flight Hours
Minimum Hard Time Component Flight Hours means [****] Flight Hours Minimum Landing Gear Calendar Time means [****] months.

Related to Minimum Hard Time Component Flight Hours

  • Flight Hour means each hour or part thereof elapsing from the moment at which the wheels of the Aircraft (or other aircraft in the case of Parts or Engines temporarily installed on such other aircraft) leave the ground on the take-off of the Aircraft (or such other aircraft) until the wheels of the Aircraft (or such other aircraft) touch the ground on the landing of the Aircraft (or such other aircraft) following such take-off.

  • Clock hours means the actual number of hours or time a participant spends attending the instructional portion of training designed to develop or enhance early care and education or school-age care competencies.

  • On-Peak Hours means Hour Ending (“HE”) 0800 through HE 2300 EPT, Monday through Friday, excluding Saturday, Sunday and PJM holidays.

  • Gross Standard Volume as herein used means volume corrected to a temperature of sixty degrees (60°) Fahrenheit, in accordance with the latest API/ASTM measurement standards, and at equilibrium vapor pressure.

  • Kilowatt-hour or “kWh” shall mean three decimal six million (3.6 10E6) Joule

  • flight time means, for aeroplanes and touring motor gliders, the time between an aircraft first moving from its parking place for the purpose of taking off until it comes to rest on the designated parking position and all engines or propellers are shut down;

  • Net metering period means the 12-month period following the date of final interconnection of the

  • Commissioning Period means, with respect to each Subproject, the period commencing upon the first delivery of Feed Gas to the Subproject in accordance with Sections 4.8 and 11.1 of the Agreement continuing through achievement of RFSU, commissioning, Start Up, Performance Testing and achievement of Substantial Completion for such Subproject.

  • Generator Planned Outage means the scheduled removal from service, in whole or in part, of a generating unit for inspection, maintenance or repair with the approval of the Office of the Interconnection in accordance with the PJM Manuals.

  • Work Day means any day that an Employee is regularly scheduled to work and for which the Employee receives payment from the Employer.

  • Off-Peak Hours means those hours which are not On-Peak Hours.

  • Peak Hours or “Peak Period” means the period with the highest ridership during the entire transit service day as determined by the transit operator. Must include at least one hour during the morning commute hours and one during evening commute hours, Monday through Friday. Each Peak Period cannot be longer than three hours.