Describe the composition of assets (including MW level) within the Large Generating Facility, including load reduction assets (e.g., 50 MW wind facility, 20 MW Energy Storage Resource and a load reduction resource with a maximum of 1 MW of load reduction): 2.
Although there is only a 1 MW difference in NLT Transmission System loads between the case with the one-percent escalation of 2015/2016 loads (89.4 MW) and the case with actual 2016/2017 loads (90.4 MW), Energy Commission staff nevertheless believed it worthwhile to examine any difference in the results due to the differing proportional loads.
Demand in terms of Peak demand in MW, Energy Requirement in BUs and the load profile for the entire year is used as the basis for estimating the Generation Capacity addition required to meet the demand in full.
U.S. Agency for International Development, Development of a Super ESCO to Implement a 600 MW Energy Efficiency Power Plant, Bangkok, January 2010.
PPA SCHEDULE B Energy committed by the WPDs as per their covering letters and subsequent mails- MW Wind Power Projects WPD Project Capacity (MW) Energy (MUs) Declared Min.
Peak Load and Energy by Weather Year and Region Peak Load (MW) Energy (GWh) RENEWABLE PROFILESThe wind and solar shapes for all study locations are from the 2017-2018 Preferred System Plan originally developed by Astrapé.
Interconnection Customer has requested the following (from Appendix 1 of the GIP):151.803 MW Energy Resource Interconnection Service – OR – 0.00 MW Network Resource Interconnection Service in the Transmission Owner load zone.
The Parties acknowledge and agree that subject to fulfillment of MH’s Conditions Precedent in Section 8.1(1) and WPS’s Condition Precedent in Section 8.2(1), the 100 MW Energy Sale Agreement shall terminate as at the start of the Contract Term and the Parties shall execute all such documents as may be reasonably required to evidence the termination of the 100 MW Energy Sale Agreement.
Approves the four storage projects and associated contracts resulting from its Local Sub Area RFO: Vistra Moss Landing (300 MW) Energy Storage Resource Adequacy Agreement (ESRAA); esVolta –Hummingbird (75 MW) ESRAA; Micronoc – mNOC AERS (10 MW) BTM CSA; and the Moss Landing Project (182.5 MW).2.