Examples of Name stamp in a sentence
Market animals going toMy Name stamp My addressBuyer’s name Buyer’s address City, State, Zip Codeprocessing will be released at approximately 4 pm on Monday.5. After the auction, exhibitors must compose an appropriate letter of appreciation to the buyer of their animal.
THIS DAY THE (LE) …………………………………… (POUR L’ORGANISME D’ACCUEIL) Name, stamp and signature of the representative of the ho organization (Nom, cachet et signature du représentant de l’organisme d’accueil) …………………………………………………………… (LE TUTEUR DE STAGE DE L’ORGANISME D’ACCUEIL) Name and signature ………………………………………………………………………………..
Market animals going to processing will be released at approximately 4 pm onMy Name stamp My addressBuyer’s nameBuyer’s addressCity, State, Zip CodeMonday.5. After the auction, exhibitors must compose an appropriate letter of appreciation to the buyer of their animal.
Adopted Pile Design Parameters (To type or paste part print below)Name, stamp & signature of QP(D)Date: Name, stamp & signature of QP(Geo)(D) (where applicable)Date: _Section B: To be completed and certified by AC and AC(Geo) (where applicable)I / We# have reviewed the ULT result(s), QP(D)’s / QP(Geo)(D)’s# interpretation report of the ULT and concur with the declarations set out in Section A above.
Name, stamp, and signature of the professional engineer and professional land surveyor, both licensed in the State of Washington, who prepared the final plat drawing together with their addresses, e-mails, and phone numbers;❑ 3.
For projects selected at European level, complaints may be lodged with the European Data Protection Supervisor at any time.The beneficiary declares having informed the promoters and participants in its project on the provisions and practices regarding data protection applied under the Youth in Action programme.Beneficiary Name, stamp (if applicable): Legal representative Name in capital letters: Place:Part I.
Name, stamp & signature of QP(D) Name, stamp & signature of QP(Geo)(D)**Date: Date: **For geotechnical aspects, where applicableAppendix A2 – OM examples for potential to omit strut The examples below are based on a proposed ERSS via Top down construction method with 2 layers of struts (S1 and S5) where strut S5 at Excavation Stage 5 has been designed to potentially be omitted via OM approach.
Name, stamp & signature of QP(S) Date: SECTION II (to be completed by the builder)1a b c dErection of ERSSI shall comply with the endorsed construction plans and sequence stipulated by the QP and accordingly produce a detailed excavation plan.
Name, stamp, and signature of the Professional Engineer and Professional Land Surveyor, both licensed in the State of Washington, who prepared the floodplain development drawings and associated plans together with their addresses, e-mails, and phone numbers.☐3.
Name, stamp and authorised signatures of the applicant Contact person (name and phone): Additional explanations to documentary credit application.