Phase I Environmental Assessment A “Phase I assessment” as described in, and meeting the criteria of, the ASTM, plus a radon and asbestos inspection.
Temporary clean coal technology demonstration project means a clean coal technology demonstration project that is operated for a period of five years or less and that complies with the SIP and other requirements necessary to attain and maintain the national ambient air quality standards during the project and after the project is terminated.
Clean coal technology demonstration project means a project using funds appropriated under the heading “Department of Energy—Clean Coal Technology,” up to a total amount of $2,500,000,000 for commercial demonstration of clean coal technology, or similar projects funded through appropriations for the Environmental Protection Agency. The federal contribution for a qualifying project shall be at least 20 percent of the total cost of the demonstration project.
Environmental Assessment Act means the Environmental Assessment Act, R.S.O. 1990, c.E.18.
Natural environment means the air, land and water, or any combination or part thereof, of the Province of Ontario; (“environnement naturel”)
Project Improvements means site improvements and facilities that are:
Infrastructure improvement means permanent infrastructure that is essential for the public health and safety or that:
Phase I Environmental Report means a report by an Independent Person who regularly conducts environmental site assessments in accordance with then current standards imposed by institutional commercial mortgage lenders and who has a reasonable amount of experience conducting such assessments.
Improvement Plan means the plan required by the Authority from the Supplier which shall detail how the Supplier will improve the provision of the Goods and/or Services pursuant to Clause 29.1.1 (Authority Remedies);
Operating Environment means, collectively, the platform, environment and conditions on, in or under which the Software is intended to be installed and operate, as set forth in the Statement of Work, including such structural, functional and other features, conditions and components as hardware, operating software and system architecture and configuration.
Production Environment means a logical group of virtual or physical computers comprised within the Cloud Environment to which the Customer will be provided with access and use the purchased Cloud Application(s) in production and for its generally marketed purpose.
Needs Improvement the Educator’s performance on a standard or overall is below the requirements of a standard or overall, but is not considered to be unsatisfactory at this time. Improvement is necessary and expected. Unsatisfactory: the Educator’s performance on a standard or overall has not significantly improved following a rating of needs improvement, or the Educator’s performance is consistently below the requirements of a standard or overall and is considered inadequate, or both.
Environmental Assessment means an assessment of the presence, storage or release of any hazardous or toxic substance, pollutant or contaminant with respect to the collateral securing a Shared-Loss Loan that has been fully or partially charged off.
Development Project means a project for the development of land within a project area.
Construction material means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
Floodplain Development Permit means any type of permit that is required in conformance with the provisions of this ordinance, prior to the commencement of any development activity.
Environmental Site Assessment means a Phase I environmental report meeting the requirements of the American Society for Testing and Materials, and, if in accordance with customary industry standards a reasonable lender would require it, a Phase II environmental report, each prepared by a licensed third party professional experienced in environmental matters.
Project Management Report means each report prepared in accordance with Section 4.02 of this Agreement;
Subproject means a specific project to be carried out by an existing BE utilizing the proceeds of a Sub-loan or Investment, as hereinafter defined, fulfilling the conditions set forth in Part A of Schedule 4 to this Agreement;
WTO GPA country construction material means a construction material that—
Energy efficiency improvement means equipment, devices, or materials intended to decrease energy consumption, including, but not limited to, all of the following:
Project Application means the federal Section 5311 operating assistance project application submitted by the Municipal Corporation to, and as approved by the Commissioner for the Project described in Appendix C of this Agreement, including all project supporting information submitted therewith;
Environmental Infrastructure System means the Environmental Infrastructure Facilities of the Borrower, including the Project, for which the Borrower is receiving the Loan.
Infrastructure Improvements means a street, road, sidewalk, parking facility, pedestrian mall, alley, bridge, sewer, sewage treatment plant, property designed to reduce, eliminate, or prevent the spread of identified soil or groundwater contamination, drainage system, waterway, waterline, water storage facility, rail line, utility line or pipeline, transit-oriented development, transit-oriented property, or other similar or related structure or improvement, together with necessary easements for the structure or improvement, owned or used by a public agency or functionally connected to similar or supporting property owned or used by a public agency, or designed and dedicated to use by, for the benefit of, or for the protection of the health, welfare, or safety of the public generally, whether or not used by a single business entity, provided that any road, street, or bridge shall be continuously open to public access and that other property shall be located in public easements or rights-of-way and sized to accommodate reasonably foreseeable development of eligible property in adjoining areas. Infrastructure improvements also include 1 or more of the following whether publicly or privately owned or operated or located on public or private property:
Data Protection Impact Assessment means an assessment by the Controller of the impact of the envisaged processing on the protection of Personal Data.
Environmental Impact Assessment means a systematic examination conducted to determine whether or not a programme, activity or project will have any adverse impacts on the environment;