New UST definition

New UST means an UST system that will be used to contain an accumulation of regulated substances and for which installation commenced on or after December 22, 1988 (see also "Existing Tank.")
New UST means each UST or UST system that Nassau County installs, brings into use, or discovers after August 1, 2019 that is located in Nassau County, including at any Facility listed in Appendices A or B.
New UST s" means any UST system that will be used to contain an accumulation of regulated substances for which installation commenced after December 22, 1988.

Examples of New UST in a sentence

  • After September 20, 2018, existing UST systems shall comply with the registration requirements outlined in LAC 33:XI.301.C.B. New UST Systems.

  • Not later than December 22, 1998, all existing UST systems shall com- ply with one of the following requirements:(a) New UST system performance standards under WAC 173-360-305;(b) The upgrading requirements in subsections (2) through (4) of this section; or(c) Closure requirements under WAC 173-360-380 through 173-360-398, including applicable requirements for corrective action under WAC 173-360-399.(2) Tank upgrading requirements.

  • New UST facilities shall not be installed using groundwater monitoring as the only leak detection method.

  • New UST facilities shall not be installed using vapor monitoring as the only leak detection method.

  • Existing UST systems installed prior to 1/26/05 in Baltimore, Carroll, Cecil, Frederick and Harford counties or New UST systems installed after 1/26/05 in Anne Arundel, Baltimore, Carroll, Cecil, Charles, Calvert, Frederick, Harford, Howard, Montgomery, and Prince George’s counties.

  • New UST system design, construc- tion, installation, and notification.

  • New UST and treatment systems were installed.14 By April 14 Although such events could be identified as an “other positive” milestone, the magnitude and awareness of this event was unclear and it is relatively close in time to the more prominent milestone (i.e., notification letters sent to all residents within a half mile).

  • GENERAL REQUIREMENTS:• New UST systems for fuel are required to have double wall construction, overfill prevention, overspill protection, tank interstitial monitoring, continuous automatic leak detection, anchoring, monitoring well network, protection from corrosion, etc.

  • New UST systems installed after July 1, 2017, must meet all requirements at installa- tion.

  • New UST systems shall meet compatibility requirements described in paragraph (D)(9) of this rule.

Related to New UST

  • FILOT or “FILOT Payments” shall mean the amount paid or to be paid in lieu of ad valorem property taxes as provided herein.

  • Common name means any designation or identification such as code name, code number, trade name, brand name or generic name used to identify a chemical other than by its chemical name.

  • Trailer means a vehicle designed to be pulled by a: