NPDES Construction Permit definition

NPDES Construction Permit means the current Minnesota Pollution Control Agency General Permit to Discharge Stormwater Associated with Construction Activity Under the National Pollution Discharge Elimination System Sate Disposal System Program (NPDES/SDS).

Examples of NPDES Construction Permit in a sentence

  • Construction activities which disturb 1 acres or greater are viewed as a source of pollution, and the RWQCB requires a Notice of Intent (NOI) be filed, along with obtaining an NPDES Construction Permit prior to the start of construction.

  • The issuance of an NPDES Construction Permit (or permit coverage under the statewide General Permit (PAG-2)) satisfies the requirements subsection A.

  • All FFA and 4-H entry applications must be made on official entry forms, completed in all respects, signed by the exhibitor and the County Extension Agent, Agriculture Science Teacher, or 4-H adult leader under whose actual supervision the project was raised ormade.

  • The contractor shall ensure that a copy of the (SWPPP) required by the NPDES Construction Permit is on-site at all times.

  • NPDES Construction Permit, to be issued by the Illinois Environmental Protection Agency.

  • Erosion and sediment control, at a minimum, shall meet the requirements and provisions defined in the most current MPCA NPDES General Storm Water Permit for Construction Activities, also referred to as the NPDES Construction Permit.

  • The issuance of an NPDES Construction Permit (or permit coverage under the statewide General Permit (PAG-2)) satisfies the requirements of subsection § 245- 14.A.E. A copy of the erosion and sediment control plan and any required permit, as required by DEP regulations, shall be available on the project site at all times.F. Additional erosion and sediment control design standards and criteria are recommended to be applied where infiltration BMPs are proposed.

  • If more than 10 acres are disturbed and drained to a single point of discharge, temporary sediment basins must be installed, however, if the site has special waters as determined by the City or defined by the NPDES Construction Permit requirements, then temporary sediment basins must be installed where 5 or more acres are disturbed.

  • Moreover, the LWP is not directly observed by the MODIS passive measurements, but is rather inferred from combining optical depth and effective radius retrievals assuming a vertically homogeneous cloud, introducing some uncertainty thereby.

  • If required by the RWQCB, the developer shall file a Notice of Intent (NOI), and if required file an NPDES Construction Permit prior to the start of construction.

Related to NPDES Construction Permit

  • Construction permit is defined in Section 4.

  • Existing construction means any structure for which the "start of construction" commenced before the effective date of the initial floodplain management code or ordinance adopted by the community as a basis for that community's participation in the NFIP.

  • Pipeline Construction means a substantial disturbance to agricultural land associated with installation, replacement, removal, operation or maintenance of a pipeline, but shall not include work performed during an emergency. Emergency means a condition where there is clear and immediate danger to life or health, or essential services, or a potentially significant loss of property. When the emergency condition ends, pipeline construction will be in accordance with these rules.

  • Begin actual construction means, in general, initiation of physical on-site construction activities on an emissions unit which are of a permanent nature. Such activities include, but are not limited to, installation of building supports and foundations, laying of underground pipework, and construction of permanent storage structures. With respect to a change in method of operation, this term refers to those on-site activities, other than preparatory activities, which mark the initiation of the change.

  • Commenced Construction means (a) all of the following site preparation work is completed: ingress and egress routes exist; the site on which the Project will be located is cleared and graded; there is power service to the site; footings are prepared; and foundations have been poured consistent with purchased equipment specifications and project design; or (b) the following financial commitments have been made: (i) (A) an engineering, procurement, and construction contract (“EPC”) has been executed by all parties and is effective; or (B) contracts (collectively, “EPC Equivalents”) for all of the following have been executed by all parties and is effective: (1) project engineering, (2) procurement of all major equipment, and (3) construction of the Project, and (ii) the cumulative payments made by the Developer under the EPC or EPC Equivalents to the counterparties to those respective agreements is equal to at least thirty (30) percent of the total costs of the EPC or EPC Equivalents.

  • New construction means, for the purposes of determining insurance rates, structures for which the "start of construction" commenced on or after the effective date of an initial FIRM or after December 31, 1974, whichever is later, and includes any subsequent improvements to such structures. For floodplain management purposes, "new construction" means structures for which the "start of construction" commenced on or after the effective date of the floodplain management regulations adopted by a community and includes any subsequent improvements to such structures.

  • General permit means a Permit which covers multiple dischargers of a point source category within a designated geographical area, in lieu of individual Permits being issued to each discharger.

  • Original construction ’ shall mean the first or initial construction

  • Environmentally constrained area means the following areas where the physical alteration of the land is in some way restricted, either through regulation, easement, deed restriction or ownership such as: wetlands, floodplains, threatened and endangered species sites or designated habitats, and parks and preserves. Habitats of endangered or threatened species are identified using the Department's Landscape Project as approved by the Department's Endangered and Nongame Species Program.

  • Building construction means any physical activity on the site involved in the erection of a structure, cladding, external finish, formwork, fixture, fitting of service installation and the unloading of plant, machinery, materials or the like.

  • Operating Permit means a permit issued pursuant to section 10 of this local law. The term “Operating Permit” shall also include an Operating Permit which is renewed, amended or extended pursuant to any provision of this local law.

  • Completion of Construction means the date, as determined by the Division after consultation with the Recipient, that the work of building and erection of the Project is substantially complete.

  • Residential construction means construction on single-family or two-family dwellings occupied or used, or intended to be occupied or used, primarily for residential purposes, and includes real property pursuant to chapter 499B.

  • Title V Permit means an operating permit under Title V of the Act.

  • Final permit means the version of a permit issued by the Department that has completed all review procedures required by Chapter 14, and for a Class I permit, Chapter 13.

  • PAL permit means the major NSR permit, the minor NSR permit, or the State operating permit under a pro- gram that is approved into the State Implementation Plan, or the title V permit issued by the Administrator that establishes a PAL for a major sta- tionary source or a GHG-only source.

  • WTO GPA country construction material means a construction material that—

  • The constructional plant means all appliances, tools, plants or machinery or whatsoever nature required in or about the execution, completion or maintenance of the works but does not include materials or other things intended to form part of the permanent work.

  • NPDES Permit means any permit or equivalent document or requirements issued by the Administrator, or, where appropriated by the Director, after enactment of the Federal Clean Water Act to regulate the discharge of pollutants pursuant to Section 402 of the Federal Act.

  • Occupation Permit means a temporary or permanent occupation permit issued by the Building Authority in relation to the Development or any part or parts thereof;

  • Interconnection Construction Service Agreement means the agreement entered into by an Interconnection Customer, Interconnected Transmission Owner and the Transmission Provider pursuant to Tariff, Part VI, Subpart B and in the form set forth in Tariff, Attachment P, relating to construction of Attachment Facilities, Network Upgrades, and/or Local Upgrades and coordination of the construction and interconnection of an associated Customer Facility. A separate Interconnection Construction Service Agreement will be executed with each Transmission Owner that is responsible for construction of any Attachment Facilities, Network Upgrades, or Local Upgrades associated with interconnection of a Customer Facility. Interconnection Customer:

  • Material of Environmental Concern means and includes pollutants, contaminants, hazardous wastes, and toxic, radioactive, caustic or otherwise hazardous substances, including petroleum, its derivatives, by-products and other hydrocarbons, or any substance having any constituent elements displaying any of the foregoing characteristics.

  • Acquisition and Construction Fund means the fund so designated in, and created pursuant to, Section 502 hereof.

  • Land disturbing construction activity means any man-made alteration of the land surface resulting in a change in the topography or existing vegetative or non-vegetative soil cover, that may result in runoff and lead to an increase in soil erosion and movement of sediment into waters of the state. Land disturbing construction activity includes clearing and grubbing, demolition, excavating, pit trench dewatering, filling and grading activities.

  • Caribbean Basin country construction material means a construction material that—

  • Title V operating permit means a permit issued under Chapter 3745-77 of the Administrative Code.