Open Loop Vapor Control System definition

Open Loop Vapor Control System means a Vapor Control System that is not a Closed Loop Vapor Control System.
Open Loop Vapor Control System means Tank Systems with Vapor Control Systems that are subject to the Open Loop Vapor Control System requirements in Appendix B.
Open Loop Vapor Control System means Vapor Control Systems at Tank Systems that are subject to the Open Loop Vapor Control System requirements in Paragraphs 19.a-19.b (Vapor Control System Engineering Evaluation and Modifications).

Examples of Open Loop Vapor Control System in a sentence

  • Design Standard means engineering design methods, equations, and information used to evaluate the capacity and operation of each Open Loop Vapor Control System, the control device(s), and vapor recovery unit consistent with the operational parameters (e.g., manufacturer specifications) and the size and design of the Vapor Control System, including piping, pressure relief valves, and available tank headspace.

  • Using the results of the field survey activities described in Appendix B, subparagraph 3(a) and the Open Loop Vapor Control System Engineering Design Standard described in Appendix B, Paragraph 2, HighPoint shall then determine if the existing Vapor Control System at each Tank System is adequately designed and sized to handle the Potential Peak Instantaneous Vapor Flow Rate which shall be calculated through the application of the Open Loop Modeling Guideline (“Open Loop Engineering Evaluation”).

  • Within five (5) Calendar Days after KPK obtains any Reliable Information including, but not limited to, observances or detections of Reliable Information during inspections required by Appendix B, subparagraph 3(a)(2) (Closed Loop Vapor Control System Verification of Engineering Evaluation), Appendix C, Paragraph 4 (Open Loop Vapor Control System Initial Verification), Paragraph 10 (Directed Inspection and Preventative Maintenance Program), Paragraph 12 (Periodic Inspections and Monitoring).

  • For each Tank System that uses an Open Loop Vapor Control System, the engineering evaluation ensures that the Vapor Control System is adequately designed and sized to handle the Potential Peak Instantaneous Vapor Flow Rate that was calculated through the application of the Open Loop Modeling Guideline and Open Loop Engineering Design Standard (see Paragraphs 1 and 2 of this Appendix).

  • The purpose of the Modeling Guideline is to determine the Open Loop Vapor Control System PPIVFR for purposes of designing and adequately sizing Vapor Control Systems and to provide procedures for achieving this objective.

  • Should the Modeling Guideline be updated, EP Energy can use the version current at the time of the Open Loop Vapor Control System Engineering Evaluations.

  • Using the field survey activities from Paragraph 16 and the Engineering Design Standards from Paragraph 18, EP Energy shall determine whether each Open Loop Vapor Control System is adequately designed and sized to handle the PPIVFR as calculated through the application of the Modeling Guideline.

  • EP Energy shall ensure that the modifications result in a Vapor Control System that is adequately designed and sized to handle the PPIVFR, as determined through application of an Open Loop Vapor Control System Engineering Evaluation consistent with the Engineering Design Standard.

  • Address any parameters or practices relied upon in developing the PPIVFR for the Tank System or Vapor Control System capacity that are observable during an AVO walk-around by ensuring that such parameters or practices (e.g., temperatures, pressures, etc.) identified by the Open Loop Vapor Control System Engineering Evaluation as critical for ensuring the Tank System and Vapor Control System are operating as designed.

Related to Open Loop Vapor Control System

  • Vapor control system means a system that prevents release to the atmosphere of gasoline vapors in excess of 80 milligrams per liter of gasoline loaded (4.7 grains per liter).

  • Control system means a system for controlling the light output of a Luminaire, including:

  • Inventory control system means a system described in Section 4-41a-103.

  • Emission control system means the electronic engine management controller and any emission related component in the exhaust or evaporative system which supplies an input to or receives an output from this controller.

  • Fuel system means the components which store or transport fuel on board the vehicle and comprise the fuel tank system, all fuel and vapour lines, any non-tank mounted fuel pumps and the activated carbon canister.

  • Electronic Control System means a combination of units, designed to co-operate in the production of the stated vehicle control function by electronic data processing. Such systems, often controlled by software, are built from discrete functional components such as sensors, electronic control units and actuators and connected by transmission links. They may include mechanical, electro-pneumatic or electro-hydraulic elements.

  • Cabinet x-ray system means an x-ray system with the x-ray tube installed in an enclosure independent of existing architectural structures except the floor on which it may be placed. The cabinet x-ray system is intended to contain at least that portion of a material being irradiated, provide radiation attenuation, and exclude personnel from its interior during generation of radiation. Included are all x-ray systems designed primarily for the inspection of carry-on baggage at airline, railroad, and bus terminals, and in similar facilities. An x-ray tube used within a shielded part of a building, or x-ray equipment that may temporarily or occasionally incorporate portable shielding, is not considered a cabinet x-ray system.

  • Single tomogram system means a CT x-ray system which obtains x-ray transmission data during a scan to produce a single tomogram.

  • Electronic toll collection system means a system of collecting tolls or charges which is capable of charging an account holder the appropriate toll or charge by transmission of information from an electronic device on a motor vehicle to the toll lane, which information is used to charge the account the appropriate toll or charge.

  • air traffic control service means a service provided for the purpose of:

  • Interconnection Activation Date means the date that the construction of the joint facility Interconnection arrangement has been completed, trunk groups have been established, joint trunk testing is completed and trunks have been mutually accepted by the Parties.

  • Disposal system means a system for disposing of sewage, industrial waste, or other wastes, or for the use or disposal of sewage sludge. “Disposal system” includes sewer systems, treatment works, point sources, dispersal systems, and any systems designed for the usage or disposal of sewage sludge.

  • Database Management System (“DBMS”) is a computer process used to store, sort, manipulate and update the data required to provide Selective Routing and ALI.

  • Large Facility Interconnection Procedures or “LFIP”) shall mean the interconnection procedures applicable to an Interconnection Request pertaining to a Large Generating Facility that are included in Attachment X of the NYISO OATT. Standard Large Generator Interconnection Agreement (“LGIA”) shall mean this Agreement, the form of interconnection agreement applicable to an Interconnection Request pertaining to a Large Generating Facility, that is included in Attachment X of the NYISO OATT. System Deliverability Upgrades shall mean the least costly configuration of commercially available components of electrical equipment that can be used, consistent with Good Utility Practice and Applicable Reliability Requirements, to make the modifications or additions to Byways and Highways and Other Interfaces on the existing New York State Transmission System and Distribution System that are required for the proposed project to connect reliably to the system in a manner that meets the NYISO Deliverability Interconnection Standard at the requested level of Capacity Resource Interconnection Service. System Protection Facilities shall mean the equipment, including necessary protection signal communications equipment, required to (1) protect the New York State Transmission System from faults or other electrical disturbances occurring at the Large Generating Facility and (2) protect the Large Generating Facility from faults or other electrical system disturbances occurring on the New York State Transmission System or on other delivery systems or other generating systems to which the New York State Transmission System is directly connected. System Upgrade Facilities shall mean the least costly configuration of commercially available components of electrical equipment that can be used, consistent with Good Utility Practice and Applicable Reliability Requirements, to make the modifications to the existing transmission system that are required to maintain system reliability due to: (i) changes in the system, including such changes as load growth and changes in load pattern, to be addressed in the form of generic generation or transmission projects; and (ii) proposed interconnections. In the case of proposed interconnection projects, System Upgrade Facilities are the modifications or additions to the existing New York State Transmission System that are required for the proposed project to connect reliably to the system in a manner that meets the NYISO Minimum Interconnection Standard. Tariff shall mean the NYISO Open Access Transmission Tariff (“OATT”), as filed with the Commission, and as amended or supplemented from time to time, or any successor tariff. Trial Operation shall mean the period during which Developer is engaged in on-site test operations and commissioning of the Large Generating Facility prior to Commercial Operation.

  • Energy efficiency portfolio standard means a requirement to

  • Electronic Subcontracting Reporting System (eSRS) means the Governmentwide, electronic, web-based system for small business subcontracting program reporting. The eSRS is located at http://www.esrs.gov.

  • Vapor recovery system means a vapor gathering system capable of collecting all hydrocarbon vapors and gases discharged from the storage vessel and a vapor disposal system capable of processing such hydrocarbon vapors and gases so as to prevent their emission to the atmosphere.

  • Traffic control signal means a device, whether manually, electrically, or mechanically operated, by which traffic is alternately directed to stop and permitted to proceed.

  • Instantaneous flow measurement means the flow measured during the minimum time required for the flow-measuring device or method to produce a result in that instance. To the extent practical, instantaneous flow measurements coincide with the collection of any grab samples required for the same sampling period so that together the samples and flow are representative of the discharge during that sampling period.

  • 911 system means the set of network, database and customer premise equipment (CPE) components required to provide 911 service.

  • Stormwater management system means any equipment, plants,

  • Busy Line Verification (BLV means a service whereby an End User requests an operator to confirm the busy status of a line.

  • Monitoring System means a system established by BNY to fulfill the Responsibilities specified in clauses (d) and (e) of Section 1 of Article III of this Agreement.

  • User Interface(s means any technologies thatiii. Customer owns and/or for which Customer has secured an appropriate license/subscription and is/areiv. used to develop/manage user interaction features and characteristics for ERP. Solely for clarity regarding ERP licensing requirements under a contract, User Interfaces for ERP shall be deemed part of ERP and therefore require human users Using ERP via such User Interfaces to have a “Named User” and/or “User” license for ERP, as applicable.

  • Database Management System (DBMS) A system of manual procedures and computer programs used to create, store and update the data required to provide Selective Routing and/or Automatic Location Identification for 911 systems. Day: A calendar day unless otherwise specified. Dedicated Transport: UNE transmission path between one of CenturyLink’s Wire Centers or switches and another of CenturyLink’s Wire Centers or switches within the same LATA and State that are dedicated to a particular customer or carrier. Default: A Party’s violation of any material term or condition of the Agreement, or refusal or failure in any material respect to properly perform its obligations under this Agreement, including the failure to make any undisputed payment when due. A Party shall also be deemed in Default upon such Party’s insolvency or the initiation of bankruptcy or receivership proceedings by or against the Party or the failure to obtain or maintain any certification(s) or authorization(s) from the Commission which are necessary or appropriate for a Party to exchange traffic or order any service, facility or arrangement under this Agreement, or notice from the Party that it has ceased doing business in this State or receipt of publicly available information that signifies the Party is no longer doing business in this State.

  • Busy Line Verification (BLV) means a service whereby an End User requests an operator to confirm the busy status of a line.