Operational Date means the date on which a union school district
Scheduled Commercial Operation Date shall have the meaning ascribed to it in Clause 5.4.1;
Activation Date means the date on which the Service and User Account (hereinafter defined) are activated for the Customer by TM as more particularly described in Clause 3.2 hereunder.
Commencement Date of the Contract means the date of signing of the Contract between the Purchaser and the Contractor.
Scheduled Completion Date shall be the date set forth in Clause 10.3;
Scheduled operation time means the scheduled operating hours of the System for the month. All planned downtime on the system would be deducted from the total operation time for the month to give the scheduled operation time.
Operational Period means the Certificate’s actual term of validity, beginning with the start of the Validity Period and ending on the earlier of: (i) the end of the Validity Period disclosed in the Certificate; or (ii) the revocation of the Certificate.
Scheduled Commissioning Date or “SCD” of the Project shall mean [Insert Date];
Commercial Operation Date (COD) means the date certified by the DISCOM’s committee upon successful commissioning (as per provisions of the PPA) of the project when all equipments as per rated capacity have been installed and energy has flown into the grid.
Accumulation Commencement Date means January 1, 2021, or such later date as the Calculation Agent on behalf of the Issuer determines in accordance with Section 2.11 hereof.
Service Activation Date means the same as Activation Date.
Guaranteed Commercial Operation Date has the meaning set forth in Section 3.9(c)(i).
Initial compliance period means the three-year compliance period that begins January 1, 1993, except for the MCLs for dichloromethane, 1,2,4-trichlorobenzene, 1,1,2-trichloroethane, benzo(a)pyrene, dalapon, di(2-ethylhexyl)adipate, di(2-ethyl- hexyl)phthalate, dinoseb, diquat, endothall, endrin, glyphosate, hexachlorobenzene, hexachlorocyclopentadiene, oxamyl, picloram, simazine, 2,3,7,8-TCDD, antimony, beryllium, cyanide, nickel, and thallium, as they apply to a supplier whose system has fewer than 150 service connections, for which it means the three-year compliance period that began on January 1, 1996.
Commercial Operation Date means the date on which a Material Project is substantially complete and commercially operable.
Railway Operation Date means the date of the first carriage of iron ore, freight goods or other products over the relevant Railway (other than for construction or commissioning purposes);
Self-service storage facility or "facility" means any real property designed or used for the purpose of renting or leasing individual storage space to tenants who are to have access to that space for the purpose of storing and removing personal property.
Formation Date has the meaning set forth in the Recitals hereof.
Amortization Commencement Date means the date on which an Amortization Event is deemed to occur pursuant to Section 20 hereof.
Deactivation Date means the date a generating unit within the PJM Region is either retired or mothballed and ceases to operate.
Interconnection Activation Date means the date that the construction of the joint facility Interconnection arrangement has been completed, trunk groups have been established, joint trunk testing is completed and trunks have been mutually accepted by the Parties.
Continuous emissions rate monitoring system or “CERMS” means the total equipment required for the determination and recording of the pollutant mass emissions rate (in terms of mass per unit of time).
USGS Business Day means any day except for a Saturday, Sunday or a day on which the Securities Industry and Financial Markets Association or any successor thereto (“SIFMA”) recommends that the fixed income departments of its members be closed for the entire day for purposes of trading in U.S. government securities.
Continuous parameter monitoring system or "CPMS" means all of the equipment necessary to meet the data acquisition and availability requirements of this chapter, to monitor process and control device operational parameters (for example, control device secondary voltages and electric currents) and other information (for example, gas flow rate, oxygen or carbon dioxide concentrations), and to record average operational parameter value on a continuous basis.
Continuous parameter monitoring system (CPMS means all of the equipment necessary to meet the data acquisition and availability requirements of the Prevention of Significant Deterioration program, to monitor process and control device operational parameters (for example, control device secondary voltages and electric currents) and other information (for example, gas flow rate, O2 or CO2 concentrations), and to record average operational parameter value(s) on a continuous basis.
Pre commencement condition means a condition imposed on the grant of permission which must be complied with: before any building/ other operation/ or use of the land comprised in the development is begun.
ECB Recommended Rate Index Cessation Effective Date means, in respect of an ECB Recommended Rate Index Cessation Event, the first date on which the ECB Recommended Rate is no longer provided, as determined by the Issuer and notified by the Issuer to the Calculation Agent;