Plan water quality objective definition

Plan water quality objective means any or all applicable requirements of the basin plan, the enclosed bays and estuaries plan and the California ocean plan.
Plan water quality objective means any or all applicable requirements of the Basin Plan, the Enclosed Bays and Estuaries Plan, the Inland Surface Water Plan, and the California Ocean Plan.

Examples of Plan water quality objective in a sentence

  • The Basin Plan water quality objective for dissolved oxygen applicable to ocean waters is stated as follows: “The dissolved oxygen concentration in ocean waters shall not at any time be depressed more than 10 percent from that which occurs naturally, as the result of the discharge of oxygen demanding waste materials”.

  • If the required improvements do not result in significantly improved groundwater quality within four years of adoption of this Order, the Provisions require that the Discharger implement additional treatment or control as necessary to bring the discharge into compliance with the Basin Plan water quality objective.

  • The limit for residual chlorine is based on the Basin Plan water quality objective, “Chlorine residual shall not be present in surface water discharges at concentrations that exceed 0.1 mg/L and shall not persist in receiving waters at any concentration that causes impairment of beneficial uses.”It is impracticable to use a 7-day average or a 30-day average limitation, because it is not as protective of beneficial uses as a daily maximum limitation.

  • The WDRs/WRRs may be reopened to include limitations for constituents which showed reasonable potential to cause or contribute to an exceedance of a Basin Plan water quality objective.

  • Floating algal scum and algal mats are also an aesthetically unpleasant nuisance.The limitations for biostimulatory substances are based on the Basin Plan water quality objective, “Waters shall not contain biostimulatory substances in concentrations that promote aquatic growth to the extent that such growth causes nuisance or adversely affects beneficial uses,” and other relevant information and are intended to be protective of the beneficial uses, pursuant to 40 CFR part 122.44(d).

  • On January 7 the Governor released a budget for 2016/17 that contained a lot of great news for our district.

  • This approach incorporates recent scientific information for dioxins on a congener-specific basis, while continuing to use the Ocean Plan water quality objective for dioxins (TCDD equivalents) and standards implementation procedures.

  • Using March 2011 to October 2015 data, the RPA showed five conclusive non-exceedances of the Ocean Plan water quality objective for Non-Chlorinated Phenolics and five conclusive non-exceedances of the Ocean Plan water quality objective for Chlorinated Phenolics.

  • An increased monitoring frequency (compared to the remaining Table B pollutants) is required for copper, zinc, and TCDD Equivalents because these pollutants were detected in the effluent at a concentration greater than the Ocean Plan water quality objective and the next permit may require that the discharge meet Ocean Plan water quality objectives without adjustment for minimum initial dilution.

  • Alternative 2: Adopt the proposed instream numeric targets as goals for addressing sediment related impacts and meeting the settleable material, sediment, and suspended material and retain the existing Basin Plan water quality objective for turbidity.

Related to Plan water quality objective

  • Applicable water quality standards means all water quality standards to which a discharge is subject under the federal Clean Water Act and which has been (a) approved or permitted to remain in effect by the Administrator following submission to the Administrator pursuant to Section 303(a) of the Act, or (b) promulgated by the Director pursuant to Section 303(b) or 303(c) of the Act, and standards promulgated under (APCEC) Regulation No. 2, as amended.

  • Student growth objective means an academic goal that teachers and designated supervisors set for groups of students.

  • High quality waters means all state waters, except:

  • Water quality volume means the volume equal to the first one-half inch of runoff multiplied by the impervious surface of the land development project.

  • Water quality standards means provisions of state or federal law which consist of a designated use or uses for the waters of the Commonwealth and water quality criteria for such waters based upon such uses. Water quality standards are to protect the public health or welfare, enhance the quality of water and serve the purposes of the State Water Control Law (§ 62.1-44.2 et seq. of the Code of Virginia) and the federal Clean Water Act (33 USC § 1251 et seq.).

  • Mobile crisis outreach team means a crisis intervention service for minors or families of minors experiencing behavioral health or psychiatric emergencies.

  • Plan Objective means the objective of securing the return described in the brochure to which these Terms and Conditions are attached.

  • Review Criteria has the meaning assigned to that term in Section 12.02(b)(i).

  • Health and Safety Plan means a documented plan which addresses hazards identified and includes safe work procedures to mitigate, reduce or control the hazards identified;

  • Objective medical evidence means reports of examinations or treatments; medical signs which are anatomical, physiological, or psychological abnormalities that can be observed; psychiatric signs which are medically demonstrable phenomena indicating specific abnormalities of behavior, affect, thought, memory, orientation, or contact with reality; or laboratory findings which are anatomical, physiological, or psychological phenomena that can be shown by medically acceptable laboratory diagnostic techniques, including but not limited to chemical tests, electrocardiograms, electroencephalograms, X-rays, and psychological tests;

  • Safe Harbors has the meaning set forth in Section 11.3.C hereof.

  • ASAM criteria means admission, continued service, transfer, and discharge criteria for the treatment of substance use disorders as published by the American Society of Addiction Medicine (ASAM).

  • Water quality means the physical characteristics of water within shoreline jurisdiction, including water quantity, hydrological, physical, chemical, aesthetic, recreation-related, and biological characteristics. Where used in this chapter, the term "water quantity" refers only to development and uses regulated under this chapter and affecting water quantity, such as impermeable surfaces and storm water handling practices. Water quantity, for purposes of this chapter, does not mean the withdrawal of ground water or diversion of surface water pursuant to RCW 90.03.250 through 90.03.340.

  • Clinical review criteria means the written screening procedures, decision abstracts, clinical protocols, and practice guidelines used by a health carrier to determine the necessity and appropriateness of health care services.

  • Quality control means the total of all activities performed by the Design-Builder, Designer, Construction Inspection Professional Engineering Firm and the Materials Testing Firm or Laboratory, subcontractors, producers or manufacturers to ensure that the Work performed by the Design-Builder conforms to the Contract requirements. For design, Quality Control activities shall include, but not be limited to, procedures for design quality, checking, design review including reviews for constructability, and review and approval of Working Plans. For construction, Quality Control activities shall include, but not be limited to, procedures for materials handling and construction quality, inspection, sampling and testing of materials both on site and at the plant(s), field testing of materials, obtaining and verifying Materials Certifications, record keeping, and equipment monitoring and calibration, production process control, and monitoring of environmental compliance. Quality Control also includes documentation of all QC design and construction efforts. The Scope of Work to be performed as part of the Quality Control task may be changed after the RFQ Phase.

  • Business Critical means any function identified in any Statement of Work as Business Critical.

  • Quality Assurance Program means the overall quality program and associated activities including the Department’s Quality Assurance, Design-Builder Quality Control, the Contract’s quality requirements for design and construction to assure compliance with Department Specifications and procedures.

  • Utilization review plan or "plan" means a written procedure for performing review.

  • Quality Plan means the quality plan to be produced by the Contractor in accordance with Schedule S2-10 (Quality Plan);

  • Business Criteria means any one or any combination of Income before Taxes, Net Income, Return on Equity, Return on Assets, Pre-tax Margin, Free Cash Flow, Valuation or EPS.

  • Performance Targets means the specific objective goal or goals (which may be cumulative and/or alternative) that are timely set in writing by the Committee for each Executive for the Performance Period in respect of any one or more of the Business Criteria.

  • National Ambient Air Quality Standards or “NAAQS” means national ambient air quality standards that are promulgated pursuant to Section 109 of the Act, 42 U.S.C. § 7409.

  • Emergency Response Plan means the plan constituting the set of procedures developed by the Owner for dealing with an Incident which may impact on the Network or Connecting Infrastructure, including all actions to be taken to minimise or alleviate any threat or danger to any person or property:

  • health and safety specification means a site, activity or project specific document prepared by the client pertaining to all health and safety requirements related to construction work;

  • Quality system means documented organizational procedures and policies: internal audits of those policies and procedures: management review and recommendation for quality improvement.”

  • Evaluation Criteria means the criteria set out under the clause 27 (Evaluation Process) of this Part C, which includes the Qualifying Criteria, Functional Criteria and Price and Preferential Points Assessment.