The U.S. Environmental Protection Agency (EPA) signed a Record of Decision for the Portland Harbor Superfund Site (Site) on January 3, 2017 (ROD) that selected Remedial Actions (RA) for the in-river portion of the Site from approximately river miles (RMs) 1.9 to 11.8. The ROD provides information about how Site data will influence Remedial Design (RD), remedial construction, and future maintenance of remediated areas.
All data must be formatted such that they can be easily uploaded to the Portland Harbor Superfund Site database (e.g., Scribe).
The recontamination Appendix A to Settlement Agreement, Docket No.00-0000-0000 Statement of Work – River Mile 11E Portland Harbor Superfund Site assessment will include an upland evaluation of pathways to the river through storm water, groundwater, and river bank erosion to ensure that upland sources have been controlled.
Appendix A to Settlement Agreement, Docket No.00-0000-0000 Statement of Work – River Mile 11E Portland Harbor Superfund Site 3 Project Schedule for Major Deliverables Table 1 contains the Schedule for Project Deliverables which is incorporated as an enforceable requirement of this SOW and the Settlement Agreement.
As noted throughout this SOW, two key linkages between the RM 11E Project Area process and larger Portland Harbor process are expected: • The results of the Portland Harbor RI/ FS will inform the RM 11E Project Area supplemental data collection efforts outlined in this SOW.
Specifically, the Implementability Study shall be performed to assess how the current site configuration and river dynamics (natural and Appendix A to Settlement Agreement, Docket No.00-0000-0000 Statement of Work – River Mile 11E Portland Harbor Superfund Site anthropogenic) may impact both the selection of the remedial alternatives and the remedial design.
Appendix A to Settlement Agreement, Docket No.00-0000-0000 Statement of Work – River Mile 11E Portland Harbor Superfund Site • Conserve natural resources and energy.
Definitions of terms such as “reduce risks” and “acceptable levels” shall be consistent with the Portland Harbor RI/FS Work Plan or as modified by the harbor wide RI/FS process.
The framework for the selection of a remedial alternative at RM 11E is contained within the March 30, 2012 Draft FS for Portland Harbor (Integral et al., 2012).