Possession of contraband definition

Possession of contraband means possession of any item or property in violation of facility rules.

Examples of Possession of contraband in a sentence

  • Possession of contraband, including any article knowingly possessed which has been altered or for which permission has not been given.

  • Possession of contraband presumed illegal shall require notification to law enforcement, establishment of chain of custody to include documenting when, where, and who discovered the item.

  • Possession of contraband items (see Contraband), mace or pepper spray during school or at any school activityDisruptions of school may result in suspension and/or recommendation for expulsion.

  • Possession of contraband is prohibited and subjected to criminal prosecution.

  • Contraband Possession of contraband is a violation of TDCJ rules.

  • Possession of contraband may be reported to local law enforcement.

  • Possession of contraband on the grounds of a prison facility may result in a felony conviction.

  • Possession of contraband that looks like or is represented to be certain prohibited items.

  • Possession of contraband materials while on school property or at school-sponsored events.

  • Possession of contraband will subject you to disciplinary action.

Related to Possession of contraband

  • Environmentally constrained area means the following areas where the physical alteration of the land is in some way restricted, either through regulation, easement, deed restriction or ownership such as: wetlands, floodplains, threatened and endangered species sites or designated habitats, and parks and preserves. Habitats of endangered or threatened species are identified using the Department's Landscape Project as approved by the Department's Endangered and Nongame Species Program.

  • Completion of Construction means the date, as determined by the Division after consultation with the Recipient, that the work of building and erection of the Project is substantially complete.

  • Caribbean Basin country construction material means a construction material that—

  • Designated country construction material means a construction material that is a WTO GPA country construction material, an FTA country construction material, a least developed country construction material, or a Caribbean Basin country construction material.

  • GENERAL AND SPECIAL CONDITIONS OF CONTRACT means the instructions to Tenderer and General and special conditions of contract pertaining to the work for which above tenders have been called for.

  • WTO GPA country construction material means a construction material that—

  • Commence Construction means that an owner or operator has either undertaken a continuous program of construction or has entered into a contractual obligation to undertake and complete, within a reasonable time, a continuous program of construction.

  • Commencement of Construction means the commencement of construction of foundation components or elements (such as footings, rafts or piles) for the home.

  • Contribution in aid of construction, as used in this subrule, means a nonrefundable cash payment grossed-up for the income tax effect of such revenue covering the costs of a distribution main extension or service line that are in excess of costs paid by the utility. The amount of tax shall be reduced by the present value of the tax benefits to be obtained by depreciating the property in determining the tax liability.

  • Hazardous substance UST system means an UST system that contains a hazardous substance defined in section 101(14) of the Comprehensive Environmental Response, Compensation and Liability Act of 1980 (but not including any substance regulated as a hazardous waste under subtitle C) or any mixture of such substances and petroleum, and which is not a petroleum UST system.

  • Contraband means any tangible or intangible article whatsoever which DOC has not previously authorized and may include letters, stamps, tools, weapons, papers, floor implements, writing materials, messages (written and verbal), instruments and the like. Contractors shall discuss any questions regarding such matters with the Facility supervisor immediately upon those questions arising.

  • Processes with Significant Environmental Aspects means the Equipment which, during regular operation or if not properly operated or maintained, may cause or are likely to cause an adverse effect.

  • State Water Control Law means Chapter 3.1 (§62.1-44.2 et seq.) of Title 62.1 of the Code of Virginia.

  • These courses also satisfy an MTA area Communication: COM 250 (GEO 7); Natural Science: BIO 158; Humanities: ENG 249, 257; MUS 130; Social Sciences: ANT 131; GEO 132; HIS 235 These courses apply, but do not satisfy the MTA: COM 251; EDU 232; HIS 125, 211; PLS 262; PSY 236; STM 101 JC Accounting Program Requirements (34 credits) ACC 214 Income Tax Accounting .......................................... 3 ACC 244 General Transfer Credit 3 * ACC 231 Principles of Accounting I........................................ 4 ACC 240 Principles of Financial Accounting (3)+1 4 * ACC 232 Principles of Accounting II....................................... 4 ACC 241 Principles of Managerial Accounting (3)+1 4 ACC 234 Managerial Accounting ........................................... 4 ACC 000 General Transfer Credit 4 ACC 240 Intermediate Accounting ......................................... 4 ACC 000 General Transfer Credit 4 ACC 245 Internship Externship .............................................. 3 AACR GEN General Credit 3 ACC 250 Technology Applications for Accounting ................. 3 ACC 000 General Transfer Credit 3 * BUA 250 Business Law I........................................................ 3 LAW 293 Legal Environment of Business 3 CIS 101 Introduction to Computer Systems.......................... 3 BMMT 201 General Transfer Credit 3 CIS 121 Microsoft Excel Comprehensive ............................. 3 BMMT 000 General Transfer Credit 3 EMU Requirements and Electives that May be Taken at JC or EMU (9-15 credits) * BUA 100 Contemporary Business.......................................... 3 COB 200 Introduction to Business 3 * ECN 232 Microeconomics ...................................................... 3 ECON 202 Principles of Microeconomics 3 * ENG 232 Technical and Business Writing.............................. 3 MGMT 202 Business Communication 3 Open Electives ................................................................................ 0-6 General Transfer Credit 0-6 Credits at JC: .............................................64-79 Credits that transfer to EMU 64-79 * Required for EMU’s BBA (Any Business Major) program. If not transferred, must be completed at EMU. 1 MAT 133 (STAT 170) applies as a prerequisite for DS 251. Note: Students must have the MTA endorsement or have completed JC ENG 131 (WRTG 121) and COM 231 (COMM 124) with a grade of “C” or higher, or complete WRTG 121 and COMM 124 at EMU with a C- or higher.

  • Commenced Construction means (a) all of the following site preparation work is completed: ingress and egress routes exist; the site on which the Project will be located is cleared and graded; there is power service to the site; footings are prepared; and foundations have been poured consistent with purchased equipment specifications and project design; or (b) the following financial commitments have been made: (i) (A) an engineering, procurement, and construction contract (“EPC”) has been executed by all parties and is effective; or (B) contracts (collectively, “EPC Equivalents”) for all of the following have been executed by all parties and is effective: (1) project engineering, (2) procurement of all major equipment, and (3) construction of the Project, and (ii) the cumulative payments made by the Developer under the EPC or EPC Equivalents to the counterparties to those respective agreements is equal to at least thirty (30) percent of the total costs of the EPC or EPC Equivalents.

  • Construction waste means solid waste which is produced or generated during construction, remodeling, or repair of pavements, houses, commercial buildings, and other structures. Construction wastes include, but are not limited to lumber, wire, sheetrock, broken brick, shingles, glass, pipes, concrete, paving materials, and metal and plastics if the metal or plastics are a part of the materials of construction or empty containers for such materials. Paints, coatings, solvents, asbestos, any liquid, compressed gases or semi-liquids and garbage are not construction wastes.

  • Operating Environment means, collectively, the platform, environment and conditions on, in or under which the Software is intended to be installed and operate, as set forth in the Statement of Work, including such structural, functional and other features, conditions and components as hardware, operating software and system architecture and configuration.

  • Construction Plant means appliances, machinery with necessary supply to up keep and maintenance of the works or temporary works but dose not include materials or other things intended to form part of the permanent work.

  • Acquisition and Construction Fund means the fund so designated in, and created pursuant to, Section 502 hereof.

  • Construction Activities means the disturbance of soils associated with clearing, grading, excavation activities or other construction-related activities.

  • Construction and demolition debris means and includes:

  • Begin actual construction means, in general, initiation of physical on-site construction activities on an emissions unit which are of a permanent nature. Such activities include, but are not limited to, installation of building supports and foundations, laying of underground pipework, and construction of permanent storage structures. With respect to a change in method of operation, this term refers to those on-site activities, other than preparatory activities, which mark the initiation of the change.

  • Specially constructed vehicle means any vehicle that was not originally constructed under a

  • Ocean Transportation Intermediaries (“OTI”) shall include an “ocean freight forwarder” and a “non-vessel operating carrier”;

  • Pipeline Construction means a substantial disturbance to agricultural land associated with installation, replacement, removal, operation or maintenance of a pipeline, but shall not include work performed during an emergency. Emergency means a condition where there is clear and immediate danger to life or health, or essential services, or a potentially significant loss of property. When the emergency condition ends, pipeline construction will be in accordance with these rules.

  • Regulated motor vehicle surface means any of the following, alone or in combination: