Examples of Rail Yard Property in a sentence
Light DutyFormer Ukiah Rail Yard Property PSI Project No. 575-249 February 17, 2011Page 9 • 3 inch Asphalt Concrete• 10 inch Class II Aggregate Base• At least 12 inches properly compacted Subgrade Soil Medium to Heavy Duty• 4.5 inch Asphalt Concrete• 14 inch Class II Aggregate Base• At least 12 inches properly compacted subgrade Soil As an alternate, concrete pavements could also be used at the site.
The WTO does not have rules applying to companies of WTO members establishing their enterprises and trading from the territories of other countries.
Beneficial uses were evaluated for on-site as well as off-site, considering current use and the following factors listed in OAR 340-122-0080(3)(f)(F):• Historical land and water uses• Anticipated future land and water uses• Concerns of community and nearby property owners• Regional and local development patterns• Regional and local population projections• Availability of alternate water sources Rail Yard Property.
The locations of the soil borings are shown onFormer Ukiah Rail Yard Property PSI Project No. 575-249 February 17, 2011Page 3 Figure 2 – Site Plan and Boring Location Map.
Classification of diabetic retinopathy from fluorescein angio- grams.
Additional work for this project included: • Negotiation of access agreements with property owners; • Participation with EPA in public meetings explaining each phase of the project; • Sampling of fish and invertebrates in the streams per EPA’s request; • Negotiations with the Rail Yard Property PRPs related to soil acceptance and use of the Rail Yard; • Satisfaction of EPA requirements for subcontractors including laboratories.
At the identified properties, soil from designated areas that exhibits PCB concentrations greater than 2 ppm is being removed and transported to the Rail Yard Property owned by AMTRAK for disposal.
Sampling and Monitoring Schedule, Rail Yard Property (as of October 2015) 9Table 6: Total PCBs in Select Asphalt Cover Area Wells, 2011-2015 10 AppendicesAPPENDIX A – REFERENCE LIST.....................................................................................................
Several potentially active and pre-Quaternary faults also occur within the regional vicinity.Former Ukiah Rail Yard Property PSI Project No. 575-249 February 17, 2011Page 6 The site is subject to a Maximum Magnitude Event of 7.5 Magnitude along the Maacama - Gerberville Fault, with a corresponding Peak Ground Acceleration of 0.51g.
Considering the use of the proposed structures, the values of SDS and SD1 calculated from the above, and the design spectral acceleration, we expect the structure to fall within SeismicFormer Ukiah Rail Yard Property PSI Project No. 575-249 February 17, 2011Page 7 Design Category D, as defined by Tables 1613.5.6(1) and 1613.5.6(2) of the code.