Readiness to change definition

Readiness to change means one dimension to be considered in consumer placement, continued stay, and transition and is an evaluation of the consumer’s current emotional and cognitive awareness of the need to change, coupled with a commitment to change.

Examples of Readiness to change in a sentence

  • Readiness to change consists of five stages: pre-contemplation (no thought of change), contemplation (thinking about change), decision / determination stage (making a plan to change), action (implementation), and maintenance (continuation of desirable) 16.

  • Readiness to change – Has little awareness and needs intervention to engage and stay in treatment, or there is high severity in this dimension.

  • Initial wellness screenings involve/address the following: ❖ Total cholesterol, HDL, LDL, triglycerides, TC/HDL ratio ❖ Height, weight, body mass index ❖ Tobacco use ❖ Nutrition ❖ Stress ❖ Exercise and physical activity ❖ Readiness to change ❖ Diabetes ❖ Blood pressure If requested by an employee, Hospital also will provide lab work including the following: TSH, Iron, Iron Binding, and PSA.

  • Readiness to change and post-intervention drinking among Hispanic college students living on the US/Mexico border.

  • The specific strategies of motivational interviewing are designed to elicit, clarify, and resolve ambivalence in a client-centred and respectful counselling atmosphere.• Readiness to change is not a client trait, but a fluctuating product of interpersonal interaction.

  • Readiness to change and pre-treatment abstinence in alcohol behavioral couple therapy.

  • Readiness to change is quintessential for the companies today as the climatic changes in the business are so rampant with the impending changes in global economic situations.

  • Readiness to change mediates the impact of eating disorder symptomatology on treatment outcome in anorexia nervosa.

  • Readiness to change is not a trait of the client, but a fluctuating result of interpersonal interaction.

  • Readiness to change is a necessity that must be experienced by an organization in order to be able to continue to adapt to a dynamic environment.

Related to Readiness to change

  • Locational Deliverability Area Reliability Requirement means the projected internal capacity in the Locational Deliverability Area plus the Capacity Emergency Transfer Objective for the Delivery Year, as determined by the Office of the Interconnection in connection with preparation of the Regional Transmission Expansion Plan, less the minimum internal resources required for all FRR Entities in such Locational Deliverability Area.

  • Time of Completion means the time for completing the execution of and passing the Tests on Completion of the Works of any section or part thereof as stated in the Contract (or as extended under Clause...) calculated from the Commencement Date

  • Operational Acceptance Tests means the tests specified in the Technical Requirements and Agreed Project Plan to be carried out to ascertain whether the System, or a specified Sub system, is able to attain the functional and performance requirements specified in the Technical Requirements and Agreed Project Plan, in accordance with the provisions of GCC Clause 27.2 (Operational Acceptance Test).

  • Interconnected Reliability Operating Limit or “IROL” shall mean the value (such as MW, MVAR, Amperes, Frequency, or Volts) derived from, or a subset of, the System Operating Limits, which if exceeded, could expose a widespread area of the bulk electrical system to instability, uncontrolled separation(s) or cascading outages.

  • Locational Deliverability Area or “LDA” shall mean a geographic area within the PJM Region that has limited transmission capability to import capacity to satisfy such area’s reliability requirement, as determined by the Office of the Interconnection in connection with preparation of the Regional Transmission Expansion Plan, and as specified in Reliability Assurance Agreement, Schedule 10.1.

  • Scope Change means any change to the scope of a contract to accommodate a need not originally provided for in the contract and which may include the acquisition of additional deliverables or the extension of the term of the contract and which may require an adjustment to the contract price;

  • Certificate of Final Completion means the certificate issued by A/E that documents, to the best of A/E’s knowledge and understanding, Contractor’s completion of all Contractor’s Punchlist items and pre-final Punchlist items, final cleanup and Contractor’s provision of Record Documents, operations and maintenance manuals, and all other closeout documents required by the Contract Documents.

  • Interconnection Feasibility Study means either a Generation Interconnection Feasibility Study or Transmission Interconnection Feasibility Study.

  • Terminal condition means an incurable condition caused by injury, disease, or illness that according to reasonable medical judgment will produce death within six months, even with available life-sustaining treatment provided in accordance with the prevailing standard of medical care.

  • Normal Operating Conditions means those Service conditions which are within the control of Grantee. Those conditions which are not within the control of Grantee include, but are not limited to, natural disasters, civil disturbances, power outages, telephone network outages, and severe or unusual weather conditions. Those conditions which are ordinarily within the control of Grantee include, but are not limited to, special promotions, pay-per-view events, rate increases, regular peak or seasonal demand periods, and maintenance or upgrade of the Cable System.

  • Final Completion means the date determined and certified by A/E and Owner on which the Work is fully and satisfactorily complete in accordance with the Contract.

  • Commercial Operation means the condition of operation in which the complete equipment covered under the Contract is officially declared by the Owner to be available for continuous operation at different loads up to and including rated capacity. Such declaration by the Owner, however, shall not relieve or prejudice the Contractor of any of his obligations under the Contract.

  • major non-compliance outcome notification means a notification received by a council under section 19N(3) or (4) of the Food Act 1984, or advice given to council by an authorized officer under that Act, of a deficiency that does not pose an immediate serious threat to public health but may do so if no remedial action is taken

  • service delivery and budget implementation plan means a detailed plan approved by the executive mayor of the municipality, in terms of section 53(l) (c) (ii) of the MFMA, for implementing the municipality's delivery of municipal services and which indicate –

  • Generation Interconnection Feasibility Study means a study conducted by the Transmission Provider (in coordination with the affected Transmission Owner(s)) in accordance with Tariff, Part IV, section 36.

  • Final completion and acceptance means the stage in the progress of the work as determined by the Contracting Officer and confirmed in writing to the Contractor, at which all work required under the contract has been completed in a satisfactory manner, subject to the discovery of defects after final completion, and except for items specifically excluded in the notice of final acceptance.

  • Day-ahead Scheduling Reserves Resources means synchronized and non-synchronized generation resources and Demand Resources electrically located within the PJM Region that are capable of providing Day-ahead Scheduling Reserves.

  • Program change means any elimination, curtailment or reorganization of a curriculum offering, program or school operation or a reorganization or closing of a school or consolidation of two or more individual schools or school districts that is unrelated to financial exigency.

  • Normal operation means all periods of operation except start-up and shutdown operations and maintenance of equipment;

  • Commercial Operations Date or "COD": The date on which Facility first achieves Commercial Operations.

  • Service Availability The total number of minutes in a calendar quarter that the Tyler Software is capable of receiving, processing, and responding to requests, excluding maintenance windows, Client Error Incidents and Force Majeure.

  • Initial Environmental Examination or “IEE” means the initial environmental examination for the Project, including any update thereto, prepared and submitted by the Borrower and cleared by ADB;

  • Commercial Operations Upon satisfaction of the following conditions, the Facility shall be considered to have achieved Commercial Operations on the Day specified in Seller's written notice described below: (i) the Acceptance Test has been passed, (ii) all generating units have passed Control System Acceptance Tests, (iii) the Transfer Date has occurred, (iv) Seller has (1) provided to Company the Required Models (as defined in Section 6(a) (Seller's Obligation to Provide Models) of Attachment B (Facility Owned by Seller)) in the form of Source Code, (2) placed the current version of the Source Code for the Required Models with the Source Code Escrow Agent as required in Section 6(b)(i)(A) (Establishment of Source Code Escrow) of Attachment B (Facility Owned by Seller), or (3) if Seller is unable to arrange for the placement of the appropriate Source Code into the Source Code Escrow account, placed the required funds with the Monetary Escrow Agent as required in Section 6(b)(ii)(A) (Establishment of Monetary Escrow) of Attachment B (Facility Owned by Seller), and (v) Seller provides Company with written notice that (aa) Seller is ready to declare the Commercial Operations Date and (bb) the Commercial Operations Date will occur within 24 hours (i.e., the next Day).

  • General Condition means these General Terms and Conditions of Contract.

  • Date of Commercial Operation means the date on which the (nuclear or non-nuclear) power plant has successfully passed all performance and operational tests required by the end customer for commercial operation. In all other cases the warranty shall apply for twenty-four (24) months from delivery of the goods or performance of the services, or such longer period of time as customarily provided by Supplier, plus delays such as those due to non-conforming goods and services. The warranties shall apply to Buyer, its successors, assigns and the users of goods and services covered by this Order.

  • Commissioning Date means that date when construction of the contemplated Project is complete, and the Maintenance Term commences;