Requested End Time definition

Requested End Time means the date and time (to the nearest minute) as notified in accordance with Clause 3 and/or 5 at which the Requested MW is no longer required to be delivered;
Requested End Time the date and time (to the nearest minute) as notified in accordance with this Annex at which the Requested MW is no longer required to be delivered;
Requested End Time means the date and time (to the nearest minute) as notified in accordance with Clause 3 and/or 5 at which the Requested KW is no longer required to be delivered;

Examples of Requested End Time in a sentence

  • DSO Re-Bound Effect A load reduction (or increase) triggered by a demand response event, that is compensated partly or fully outside the period between the Requested Start Time and Requested End Time of a Utilisation Instruction or by other resources within the Zone.

  • DSO Contracted Service Maximum Run Time [XXXX] minutes duration, being the maximum time between the Requested Start Time and Requested End Time, within the Service Window.

  • Provider Contracted Response Time The flexibility service required activation within [XXXX] minutes DSO Contracted Service Minimum Run Time [XXXX] minutes duration, being the minimum time between the Requested Start Time and Requested End Time, within the Service Window.

  • Provider Contracted Service Minimum Run Time 30 minutes duration, being the minimum time between the Requested Start Time and Requested End Time, within the Service Window.

  • The Company To be completed by the Company [Provider] To be completed by the Provider Zone ID: Flexible Unit ID: Requested Start Time: [dd/mm/yy hh:mm] Accepted Start Time: [dd/mm/yy hh:mm] Requested End Time: [dd/mm/yy hh:mm] Accepted End Time: [dd/mm/yy hh:mm] Requested MW: Accepted MW: Name: Date/Time: DECLARATION NOTIFICATION / NOMINATION NOTIFICATION In accordance with Clause 9, this is a notification of [declaration / nomination] to deliver Flexibility Services.

  • DSO Contracted Service Maximum Run Time 120 minutes duration, being the maximum time between the Requested Start Time and Requested End Time, within the Service Window.

  • DSO Contracted Se rvice Maximum Run Time 120 minutes duration, being the maximum time between the Requested Start Time and Requested End Time, within the Service Window.


More Definitions of Requested End Time

Requested End Time means the date and time (to the nearest minute) as notified in accordance with Clause 3 and/or Error! Reference source not found. at which the R equested MW is no longer required to be delivered;

Related to Requested End Time

  • Interconnection Activation Date means the date that the construction of the joint facility Interconnection arrangement has been completed, trunk groups have been established, joint trunk testing is completed and trunks have been mutually accepted by the Parties.

  • Response Time means the difference in time between the change of the component to be measured at the reference point and a system response of 90 per cent of the final reading (t90) with the sampling probe being defined as the reference point, whereby the change of the measured component is at least 60 per cent full scale (FS) and takes place in less than 0.1 second. The system response time consists of the delay time to the system and of the rise time of the system.

  • Receiving water means any lake, river, stream or wetland that receives stormwater discharges from an MS4.

  • Police officer means every officer authorized to direct or regulate traffic, or to make arrests for violations of traffic regulations.