Examples of Rope Shovel in a sentence
In the event the Purchaser elects to exercise the option to cause the applicable Access Party to transport, remove or dispose of the Rope Shovel out of the Premises in accordance with Section 4.2(i), the Term shall be deemed, in respect of the Rope Shovel only, to be extended until the earlier of (a) the complete removal of the Rope Shovel from the Premises, and (b) the date that is twelve (12) months from the end of the Term.
In the event an Access Party elects to exercise the option to transport, remove or dispose of an Excluded Asset other than the Rope Shovel out of the Premises in accordance with Section 4.3(i), the Term shall be deemed, in respect of such Excluded Asset only, to be extended until the earlier of (a) the complete removal of such Excluded Asset from the Premises, and (b) the date that is 30 days from the end of the Term.
Sl.NoBrief Description of Goods &ServicesQuantityExpected Delivery schedule at Site120 CuM Electric Rope Shovel as per design criteria given in Part-D, Clause D.3 of Technical Specifications, Section VI.02 nos.At least 01 (one) machine within 12 months from the date of signing of Contract.Thereafter, the 2nd machine within 75 days.Project wise Allocation:Dudhichua OCP, NCL – 02 nos.
Test SchedulingEach test administration is specific to a single grade-level cluster and tier, and the Speaking test is always delivered individually.
Rope Shovel and Walking Dragline equipment Business was lost as our collaborator Company was taken over by our competitor.
Table – B [If the bidder qualifies against sub clause -7.5.2 of clause - 7: Provenness criteria, Section II (ITB)] Sl.NoBrief Description of Goods &ServicesQuantityExpected Delivery schedule at Site142CuM Electric Rope Shovel as per design criteria given in Technical Specification (Section – VI, part- D, Clause- 3)08(Eight)01 (one) machine within 15 months from the date of signing of contract to be supplied in First lot.
EquipmentMARCperiodMinimum annualGuaranteed %ge Availabilty1st to 6th7th to 9th10th to 12th13th to 17thElectric Rope Shovel 10 Cu.M.1785848382 During the MARC period, one month time shall be allowed at a stretch two times (first in the 6/7th year and second in the 10th/11th year) for major rehabilitation of the equipment in consultation with the Project Head.
This specification is intended to cover the technical requirements for the design, manufacture, testing, delivery, on site erection and commissioning of a self- propelled, crawler mounted, bottom discharge Electric Rope Shovel of 10 Cum dipper capacity (SAE).
Repairs and maintenance will be paid as Costs of Non-Gaming Operations.
Table – B [If the bidder qualifies against sub clause -7.5.2 of clause - 7: Provenness criteria, Section II (ITB)] Sl.NoBrief Description of Goods &ServicesQuantityExpected Delivery schedule at Site120CuM Electric Rope Shovel as per design criteria given in Technical Specification (Section – VI, part- D, Clause- 3)16(Sixteen) nos.